NOTICES & TENDERS

Notices & Tenders of the Board displayed on the Website are for general information only. The original copy of the Notices and tenders available in the Board should be consulted for authenticity.

 
DATESUBJECT OF ORDERSACTION
16.12.2024 
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela Purba Burdwan, Townhall Ground under West Bengal Khadi and village Industries Board 2024 25 2nd Call
VIEW
12.12.2024
Estimate for Fire and Safety of Readymade Garment Hub at Choupaharir Jangal,near Illambazar, Birbhum under WBKVIB 2nd Call.
VIEW
11.12.2024
State Khadi Mela 2024-25 VI Participation List
VIEW
11.12.2024
State Khadi Mela 2024-25 Khadi Participation List
VIEW
05.12.2024
Designing and beautification work for theme pavilion in State Khadi Mela in Taltala Ground under WBKVIB during the year 2024-25
VIEW
04.12.2024
Notice Inviting Quotation for Supply and Installation Desktop Computer & Accessories in Engineering Cell Under WBKVIB
VIEW
03.12.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela Birbhum,Dak Banglow Maidan, Bolpur, Birbhum under West Bengal Khadi and village Industries Board 2024-25. 
VIEW
29.11.2024
Day to Day Emergency Maintenance work of Plumbing, Civil & Electrical in Ground floor to Fourth floor (including Roof) of Hemanta Bhavan,12 B.B.D. Bag, Kol-1, Head Quarter of West Bengal Khadi & Village Industries Board during the year 2024-25 on basis of P.W.D. Govt. of West Bengal S.O.R-2017 and all agenda corrigendum 2nd Call
VIEW
29.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela Purba Burdwan, Townhall Ground under West Bengal Khadi and village Industries Board 2024-25.
VIEW
28.11.2024
Supply, fitting and fixing of 1 (One) No. of 2.0 Ton Mitsubishi or similar brand Split Air Conditioner in Head Office (Online Section – 2Th Floor) under WBKVIB
VIEW
26.11.2024
Supply and Installation of 1(One) Submersible (2 H.P) & 1(One) Centrifugal (3 H.P)Pump with all accessories  in RMG Readymade Garments Hub of Illambazar, Birbhum under WBKVIB during the year  2024-25.
VIEW
22.11.2024
Supplying Two nos Samsung or Similar make Brand Android Mobile phones in Head Quarter of WBKVIB, 12 no. B.B.D. Bag , Kol-01
VIEW
22.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela Paschim Mednipur, Mednipur Burge Town Ground under West Bengal Khadi & Village Industries Board 2024-25
VIEW
 20.11.2024
Notice Inviting Quotation for Supply and Installation of LED Glow Sign Board of 2(Two) Nos. in RMG Readymade Garments Hub of Illambazar, Birbhum under WBKVIB.
VIEW
 20.11.2024 
Supply  Laptop & Accessories in AEO Office Room  under WBKVIB
VIEW
 18.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela, Paschim Burdwan under West Bengal Khadi & Village Industries Board 2024-25
VIEW
18.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela, Purulia, GEL Church Ground under West Bengal Khadi & Village Industries Board 2024-25
VIEW
06.11.2024 
Temporary Construction, Beautification, Installation of Sound and IT, Provide Security Guard and Temporary Construction of Toilet Block to Organizing State Level Khadi Mela under West Bengal Khadi& Village Industries Board 2024-25
VIEW
06.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level KhadiMela, North 24 PGS under West Bengal Khadi& Village Industries Board 2024-25
VIEW
 05.11.2024LIFE CERTIFICATE FORMVIEW
05.11.2024Online Notice Inviting Tender for Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist Bankura3rdCall.VIEW
05.11.2024Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur, Chhatna, Bankura 3rd CallVIEW
29.10.2024Supply and Installation of Tulaipanji Rice Packing Machine of (500gm -1Kg)in 12 B.B.D Bag Head Office  under WBKVIB during the year 2024-25.VIEW
29.10.2024Day to Day Emergency Maintenance work of Plumbing, Civil & Electrical in Ground floor to Fourth floor (including Roof) of Hemanta Bhavan,12 B.B.D. Bag, Kol-1, Head Quarter of West Bengal Khadi & Village Industries Board during the year 2024-25 on basis of P.W.D. Govt. of West Bengal S.O.R-2017 and all agenda corrigendum.VIEW
28.10.2024Supply  Laptop and Accessories in CEO Office  Room  under WBKVIBVIEW
25.10.2024Supply of V.I.P Executive  Chair Godrej or similar make  in Head Office(2nd Floor) of WBKVIB  12 B.B.D. Bag,Kolkata-700001VIEW
22.10.2024Supply and Installation of New  Tally Software With latest version & all necessary application tools for Marketing Section under WBKVIB.VIEW
26.09.2024Online NIT for Supply, Installation of Solar Charka, Tool Kit for Project, Training and Distribution of Solar Charka to the Khadi and Muslin Artisians in different Districts of West Bengal during the year 2024-25 under WBKVIB 2nd CallVIEW
26.09.2024Online Notice Inviting Quotation for Inviting Rate to Supply and Installation of different type of Fire Extinguisher (Cease Fire or Similar Make) at Center of Excellence Ashoknagar, North 24 Parganas, under WBKVIB during the year 2024-25VIEW
24.09.2024Estimate for Fire and Safety of Readymade Garment Hub at Choupaharir Jangal, near Illambazar, Birbhum under WBKVIBVIEW
24.09.2024Estimate for Water Purifire of Readymade Garment Hub at Choupaharir Jangal, near Illambazar, Birbhum under WBKVIB.VIEW
04.09.2024Notice Inviting Quotation for Supply of office steel Almirah and android Phone in Head Office of WBKVIB, 12 B.B.D. Bag, Kolkata-700001.VIEW
03.09.2024Notice Inviting Quotation for Supply Desktop Computer & Accessories in CEO Office Room under WBKVIBVIEW
03.09.2024 Notice Inviting Quotation for Supply  Laptop and Accessories in Chairman Office  Room  under WBKVIBVIEW
02.09.2024Construction of Double Storied CPC Building for  Honey Cluster Project at Patghara, Hingalganj, Dist.- North 24 Parganas under W.B.K.V.I.B.VIEW
02.09.2024Supply, Installation & Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIBVIEW
30.08.2024Notice Inviting Quotation for Emergency  Supply and Installation of different size flex in Biswa Bangla Shopping festival at Science City  & Bangla Tanter Hat at Karunamoyee under WBKVIB.VIEW
20.08.2024Notice Inviting Tender for Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist Bankura 2nd Call.VIEW
20.08.2024 Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur, Chhatna, Bankura 2nd CallVIEW
20.08.2024Construction of Double Storied CPC Building for Areca Nut Processing Claster Project at Dist. Alipurduar under W.B.K.V.I.B 2nd CallVIEW
19.08.2024Supply, Installation of Solar Charka, Tool Kit for Project, Training and Distribution of Solar Charka to the Khadi and Muslin Artisians in different Districts of West Bengal during the year 2024-25 under WBKVIBVIEW
29.07.2024Installation of Glow Sign Board at Gramin Outlet Bolpur VIEW
26.07.2024Notice Inviting Quotation for Supply and Installation of Glow Sign Board(2 Nos.) in Kalyani HMP Centre, Nadia under WBKVIB VIEW
22.07.2024NOTICE INVITING QUOTATION FOR SUPPLY AND INSTALLATION OF TALLY SOFTWARE WITH LATEST VERSION & ALL NECESSARY APPLICATION TOOLS UNDER WBKVIBVIEW
21.07.2024Supplying of Bee Box in Bee Keeping Cluster ,Phase-II at Kurseong Block, Dist-Darjeeling during the Year 2024-25.VIEW
21.07.2024Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist- Bankura.VIEW
15.07.2024Supply, Installation and Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIBVIEW
12.07.2024Supply of Machine, Tools & Furniture in cluster of Binre Rice Straw Rope Making in Purba Burdwan District.VIEW
12.07.20241st Board Meeting Resolution 2024VIEW
03.07.2024Supply and Installation of Stored Pressure Water Type Fire Extinguisher Capacity 2 Liter at Nalen Gur Production Building ,majdia,Nadia District.
VIEW
 03.07.2024Construction of Double Storied CPC Building for Areca Nut Processing Claster Project at Dist. Alipurduar under W.B.K.V.I.B VIEW
27.06.2024Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur,Chhatna,Bankura.VIEW
26.06.2024CONSTRUCTION OF DOUBLE STORIED CPC BUILDING FOR ARECA NUT PROCESSING CLASTER PROJECT AT BHAJANPUR, DIST. DARJEELING  UNDER W.B.K.V.I.B.VIEW
25.06.2024Notice Inviting Quotation Beautification work in Gramin Outlet of WBKVIB at 12 B.B.D Bag, Kol- 700 001.VIEW
24.06.2024Notice Inviting Quotation for Supply and Installation of Glow Sign Board in CPC of Water Hyacinth Craft making in Purbasthali,Purba BurdwanVIEW
24.06.2024 Notice Inviting Quotation for Supply of Miscellaneous articles in Head Office of WBKVIB (2nd Floor),12 B.B.D. Bag,Kolkata-700001. VIEW
24.06.2024Notice Inviting Quotation for Supply, fitting and fixing of 1 (One) No. of 2.0Ton Split Air Conditioner in Head Office(Khadi Section – 4Th Floor) under  WBKVIBVIEW
24.06.2024Notice Inviting Quotation for Supply and Installation of Glow Sign Board in CPC of  Binre by straw product in Purbasthali,Purba Burdwan (Size--8’0” X 4’.0”)VIEW
20.06.2024Additional Work of District Level Khadi Mela 2023-24 Burdwan District under WBKVIB (Phase-II)
VIEW
19.06.2024Notice Inviting Online Tender for Remodelling and Renovation work of P.A.'s Chamber in 2nd floor of Hemanta Basu Bhavan at 12, B.B.D. Bag, Kolkata 700 001, Office of West Bengal Khadi & Village Industries Board (Civil & Electrical Work) during the year 2023-24VIEW
 19.06.2024Supply and Installation of Machineries for Dheki Processed Rice Making Project at Dalpur,Chhatna,Bankura VIEW
19.06.2024Notice Inviting Quotation for Transportation and Installation of Air Conditioner in Different District Office (Purulia, Purba Medinipur, Paschim Medinipur, Club Muslin) under WBKVIB.VIEW
18.06.2024Notice Inviting Tender for Construction of The Project Bee Keeping Cluster (may be read as Honey cluster) at DihiparaDist- Murshidabad Construction of Ground Floor Residential BuildingofDihipara Bee Keeping Cluster Industrial Cooperative Society LTD DihiparaDist- Murshidabad under WBKVIB  2nd CallVIEW
18.06.2024Online Notice Inviting Tender for Additional Renovation work of Gramin Outlet of Mayapur,  Iskcon,Dist. Nadia under WBKVIB. Civil, Sanitary and Plumbing work during the Year 2023-242nd CallVIEW
14.06.2024 Supply, Installation & Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIB VIEW
14.06.2024Construction of Three Storied CPC Building for District Office Purulia, Dist. Purulia Under W.B.K.V.I.BVIEW
14.06.2024  Repair & Renovation of Production Unit, Construction of Double Storied Office Building and Other Allied Work of Dasghara H.M.P. Centre at Dighir VIEW
14.06.2024

Additional Work of District Level Khadi Mela 2023-24 Howrah District under WBKVIB (Phase-II)

VIEW
14.06.2024

Additional Work of District Level Khadi Mela 2023-24 Howrah District under WBKVIB (Phase-I)

VIEW
14.06.2024

Additional Work of District Level Khadi Mela 2023-24 Burdwan District under WBKVIB (Phase-I)

VIEW
13.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Different District under WBKVIB.

VIEW
13.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 1 (One) Nos. of 2.0Ton Split Air Conditioner in Club Muslin, Dakhinapan under WBKVIB.

VIEW
12.06.2024

Repair work at Canteen on 3rd floor  of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001

VIEW
12.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Purba Medinipur District under WBKVIB

VIEW
12.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Paschim Medinipur District under WBKVIB

VIEW
12.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Purulia District under WBKVIB

VIEW
07.06.2024

Supply and Installation of Telephone Intercom with additional accessories in different floor of Khadi Head Office Building of WBKVIB at 12 B.B.D Bag (Hemanta Bhawan) Phase - 2  

VIEW
07.06.2024

Supply and Installation of Telephone Intercom with additional accessories in different floor of Khadi Head Office Building of WBKVIB at 12 B.B.D Bag (Hemanta Bhawan) Phase - 1

VIEW
07.06.2024

Anti-Termite Treatment of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001, during the year 2024-25 (Phase 2)

VIEW
15.05.2024

WALK-IN-INTERVIEW FOR ACCOUNT OFFICER CUM OFFICER IN CHARGE

VIEW
16.04.2024

WALK-IN-INTERVIEW FOR MARKETING OFFICER

VIEW
02.04.2024

WALK-IN-INTERVIEW FOR ASSISTANCE ENGINEER (CIVIL)

VIEW
21.03.2024

WALK-IN-INTERVIEW

VIEW
14.03.2024

Notice Inviting Online Quotation for Supply of Manpower (Existing) at various posts under WBKVIB (Head Office and All District Offices.)

VIEW 
07.03.2024Online Notice Inviting Quotation for Assignment for Assignment Regarding GST Audit on GST along with all official Formalities against monthly Transaction for the 2024-25 and 2025-26 in Respect of WBKVIBVIEW
07.03.2024Online Notice Inviting Quotation for Assignment for Preparation of Final Accounts for the F.Y. 2024-25 and 2025-26 in Respect of WBKVIBVIEW
06.03.2024Construction of Jaggery Processing Center with Boundary Wall and Ramp for Packing of Nolen Gur project at Majdia, Dist-Nadia, under WBKVIB. VIEW
22.02.2024 Notice Inviting Tender for Construction of the Project Bee Keeping Cluster (may be read as Honey Cluster) at Dihipara Dist-Murshidabad Construction of Ground Floor Residential building of Dihipara bee Keeping Cluster industrial Co-operative Society LTD Dihipara  Dist-Murshidabad under WBKVIB.VIEW

21.02.2024

Notice inviting Online Quotation for Supplying Mini Truck  Commercial and Light Commercial Vehicles LCV for carrying Khadi Textile goods in Kolkata and different districts of West Bengal based on as when required 4th Call.VIEW

17.02.2024

RESOLUTION OF 3RD BOARD MEETING OF 2023-24 DATED, THE 17TH OF FEBRUARY, 2024VIEW

07.02.2024

District Level Khadi Mela 2023-24 Burdwan DistrictVIEW
02.02.2024 Notice Inviting Tender for Setup Furnace & Machineries of Pottery Cluster at Birnagar Block, Dist. Nadia under WBKVIB.VIEW
02.02.2024District Level Khadi Mela 2023-24 Howrah District from 08-03-2024 Tikia Para Station Adjacent GroundVIEW
01.02.2024Notice Inviting Quotation for supply and installation of Machinery, Associate Tools & Furniture, at CPC Building for Project on Water Hyacinth (Kachuripana) Craft Item Making at Purbasthali-I Block, Dist.- Purba Burdwan under WBKVIB- 2nd Call.VIEW
01.02.2024Notice Inviting Tender for Repair / Rectification of Machineries for Mango Processing Cluster at Malda, under WBKVIB - 3rd Call.VIEW
17.01.20241. STALL ALLOCATION for State Khadi Mela 2024- VI  VIEW
17.01.20242. STALL ALLOCATION for State Khadi Mela 2024- KHADI  VIEW
 16.01.2024NIQ for Supply Desktop Computer & Accessories in Head Office P.A Section under WBKVIB.VIEW
03.01.2024Miscellanies Supply, Fitting, and  Fixing of various items at the newly renovated Newtown Khadi Gramin Store, Shop No. 422,1B, B.D.Block Market, Action Area 1, Street no. 165, Newtown under WBKVIB.VIEW
21.12.2023NIQ for Supplying of Mini Truck  Commercial and Light Commercial Vehicles LCV for carrying Khadi  Textile goods 3rd CallVIEW
19.12.2023Repair and restoration work of Gramin Outlet of WBKVIB at 12, B.B.D. Bag, Kolkata 700 001.VIEW
17.12.2023RESOLUTION OF 2ND BOARD MEETING OF 2023-24 DATED, THE 18TH OF DECEMBER,2023VIEW
15.12.2023Supply and Installation of Machinery, Associate Tools & Furniture, at CPC Building for Project on Water Hyacinth (Kachuripana) Craft item Making at Purbasthali-I Block, Dist. Purba Burdwan under WBKVIB.VIEW
15.12.2023 NIQ for Miscellanies Income Tax Work in WBKVIB from 1st January 2024 to 31st March 2026. During the F.Y. 2023-24VIEW
14.12.2023 Repair/Rectification of Machineries for Mango Processing Cluster at Malda, under WBKVIBVIEW
12.12.2023

Expression of Interest (EoIs) to consume the cotton yarns and fabrics in bulk volume from various production units of WBKVIB

VIEW
11.12.2023PROJECT BALUCHURI WEAVING CLUSTER AT SONAMUKHI BLOCK, DIST BANKURAVIEW
07.12.2023Notice Inviting Quotation for Miscellanies Supply, fitting, and fixing of various items at CLUB MUSLIN Store, DAKHINAPAN MARKET, Dhakuria, Kolkata, West Bengal 700068 under WBKVIB.VIEW
06.12.2023Notice Inviting Quotation for Supply of 220 Lunch Packets for the Board meeting to be held on 18.12.2023 at WBKVIB Head Office, 12, B.B.D Bag, Kolkata - 700 001VIEW
05.12.2023District Level Khadi Mela 2023-24 (Birbhum)VIEW
30.11.2023Expression of Interest for Internal Audit in W.B. Khadi & Village Industries Board, at 12 BBD Bag, Kolkata - 700001VIEW
30.11.2023NOTICE INVITING ONLINE QUOTATION FOR SUPPLYING OF MINI TRUCK(COMMERCIAL) AND LIGHT COMMERCIAL VEHICLES (LCV) FOR CARRYING KHADI/TEXTILE GOODS IN KOLKATA AND DIFFERENT DISTRICTS OF WEST BENGAL ON THE BASIS OF AS WHEN REQUIRED. (2nd CALL)VIEW
29.11.2023State Level Khadi Mela 2023-24VIEW
24.11.2023West Bengal Khadi & Village Industries Board Stall Distribution at Malda MelaVIEW
22.11.2023NIQ for Supply, fitting & fixing of 1.0 Ton Split AC, including all necessary electrification & installation at Howrah Gramin Store, Howrah Zila Parishad Complex under WBKVIB.VIEW
06.11.2023Online Quotation for Supplying of Mini Truck (Commercial) and Light Commercial Vehicles (LCV) for carrying Khadi / Textile goods in Kolkata and different districts of West Bengal based on as when required.VIEW
17.10.2023Readymade Garments Hub at Chou Pahari Jangle, near Illam bazar, Dist.-Birbhum under WBKVIB- Supply & Installation of Machinery.VIEW
13.10.2023Supply and Installation of Fire Extinguisher at WBKVIB Office at 12, B.B.D Bag, Kolkata- 700 001 (2nd Call)VIEW
12.10.2023Stall confirmation details District Level Khadi Mela – 2023-24, at Krishnanagar Public Library Ground,
Krishnanagar, Nadia (V.I.)
VIEW
12.10.2023
Stall confirmation details District Level Khadi Mela – 2023-24, at Krishnanagar Public Library Ground,
Krishnanagar, Nadia (Khadi)
VIEW
11.10.2023
Offline Notice inviting tender for Electrical Writing & Fitting Fixing for Double Storied CPC Building for Project on Water Hyacinth  (Kachuripana) Craft item Making at Purbasthali-I Block, Dist-Purba Burdwan under WBKVIB.
VIEW
09.10.2023
Life Certificate
VIEW
06.10.2023Anti-Termite Treatment of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001, during the year 2023-24  VIEW
05.10.2023
Computer Peripherals Head Office
VIEW
05.10.2023
Computer Peripherals Different District 
VIEW
30.09.2023
STALL ALLOCATION FOR DARJEELING KHADI MELA 2023-24
VIEW
29.09.2023
District Level Khadi Mela 2023-24 from 30-10-23 to 10-11-23 at Krishnagar Public Library Ground, Krishnanagar, Nadia
VIEW
18.09.2023
Renovation of Khadi Gramin Store at Shop No. 422, 1B.B.D. Block Market, Action Area 1, Street no. 165, New Town under WBKVIB
VIEW
14.09.2023
Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum- Installation of Sound System and Lighting System Diesel Generator and other allied Work. 
VIEW
13.09.2023Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum - Temporary Construction for Audience Space and other allied work.VIEW
12.09.2023Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum - Temporary Construction of stage, Metal Structure, VIP Chair, and other allied work.VIEW
12.09.2023Notice Inviting Quotation for supply, fitting, and fixing of Glow sign Board and all necessary electrification and installation at CLUB MUSLIN.VIEW
12.09.2023Renovation work (Civil & Electrical) of room in 1st floor for proposed Bhabisyat Credit Card Wings of MSME&T Department in Head Office, 12, B.B.D Bag, Kolkata- 700 001.VIEW
07.09.2023Repair Rectification of Machineries for Mango Processing Cluster at Malda under WBKVIB as details are given belowVIEW
07.09.2023Supply, fitting, and fixing of Glow sign Board of Size 8' x 1'6 including all necessary electrification and installation at Howrah Gramin Store, Howrah Zila Parishad Complex under WBKVIB.VIEW
07.09.2023Supply, fitting, and fixing of Glow sign Board of Size 6' x 2'6 including all necessary electrification and installation at Purba Burdwan under WBKVIB.VIEW
04.09.2023Binre Making From Straw at Choto Kobala, Bidya Nagar, Serampore, Purbasthali - I, Purba Burdwan under WBKVIBVIEW
29.08.2023Supply of Bee Hive Box and tool Kits for a project on Bee Keeping at Rani Bandh and Hir Bandh Block, Bankura under WBKVIB.VIEW
29.08.2023Supply and installation of Fire Extinguisher at WBKVIB Office.VIEW
25.08.2023The First Board MeetingVIEW
16.08.2023Day to Day Maintenance work for Sanitary & Plumbing work at 12, BBD Bag Kolkata- 700 001VIEW
16.08.2023Day to Day Maintenance work for Electrical work at 12, BBD Bag Kolkata- 700 001VIEW
16.08.2023

Day To Day Maintenance work for Building Works at 12, BBD Bag Kolkata- 700 001

VIEW
03.08.2023

CONSTRUCTION OF READYMADE GARMENTS HUB AT CHOUPAHARI JANGAL, NEAR ILLAMBAZAR, BIRBHUM UNDER WBKVIB

VIEW
27.07.2023

SUPPLY OF MISCELLANEOUS ITEMS FOR DASGHARA, HANDMADE PAPER CENTER, DASGHARA, HOOGHLY 

VIEW
27.07.2023

EMERGENT REPAIR WORK IN CHAIRMAN TOILET AND SECRETARY CHAMBER, CORRIDOR UNDER WBKVIB DURING YEAR 2023-24

VIEW
18.07.2023

CONSTRUCTION OF MOYA HUB INCLUDING BOUNDARY WALL, SANITARY PLUMBING, AND ELECTRICAL WORK AT JOYNAGAR, SOUTH 24 PGS UNDER WBKVIB IN THE YEAR 2023-24.

VIEW
13.07.2023

EMERGENT SHIFTING WORK FOR CLUB MUSLIN SHOWROOM (SHARING SHOP OF RESHAM SHILPA) AT DAKSHINAPAN MARKET COMPLEX UNDER WBKVIB DURING THE YEAR 2023-24

VIEW
05.07.2023

NIQ FOR SOUND SYSTEM DURING MELA 

VIEW
05.07.2023

NIQ FOR TEMPORARY ELECTRIFICATION OF,(STALL, THEME PAVILION, STAGE, INTERNAL DECORATION, VIP ROOM &  PLATFORM, etc.

VIEW
05.07.2023

NIQ FOR TEMPORARY CONSTRUCTION OF,(STALL, THEME NIQ FOR TEMPORARY CONSTRUCTION OF,(STALL, THEME PAVILION, STAGE, INTERNAL DECORATION, VIP ROOM & PLATFORM etc

VIEW
07.06.2023 

CONSTRUCTION OF MOYA HUB INCLUDING BOUNDARY WALL, SANITARY PLUMBING, AND ELECTRICAL WORK AT JOYNAGAR, SOUTH 24 PGS UNDER WBKVIB IN THE YEAR 2023-24

VIEW 

07.06.2023

EMERGENT SHIFTING WORK FOR CLUB MUSLIN SHOWROOM AT DAKSHINAPAN MARKET COMPLEX UNDER WBKVIB DURING THE YEAR 2023-24

VIEW

31.05.2023

RENEWING M.S. STRUCTURE INCLUDING PRIMING, PAINTING, AND NECESSARY ELECTRICAL WORK INCLUDING EARTH BUSBAR CONNECTION FOR ACP GLOWSING BOARD ON ROOF AT HEAD OFFICE BUILDING UNDER WBKVIB.

VIEW
19.05.2023

RENOVATION OF KHADI GRAMIN STORE AT HOWRAH ZELA PARISHAD COMPLEX UNDER WBKVIB

VIEW
15.05.2023

IMPLEMENTATION OF THE PROJECT ON WATER HYACINTH(KACHURIPANA) CRAFT ITEM MAKING AT PURBASTHALI

VIEW
15.05.2023

ANNUAL MAINTENANCE OF AC MACHINES OFFICE OF THE WBKVIB IN DIFFERENT SECTIONS

VIEW
06.04.2023 

SUPPLY & INSTALLATION OF ACP, LED GLOW SIGNBOARD IN HEADQUARTERS BUILDING

VIEW 
06.04.2023 

RENOVATION, REPAIR, AND OTHER WORK OF GRAMIN SHOWROOM AT PURBA BURDWAN

VIEW 
31.03.2023 

PUBLISHING OF TENDER NOTICE ON THE WEST BENGAL E-TENDER PORTAL WEBSITE

VIEW
24.03.2023

RESOLUTION OF THE MEETING OF THE INTERVIEW BOARD FOR ENGAGEMENT OF A RETIRED EXECUTIVE ENGINEER CIVIL AT THE HEADQUARTER OFFICE OF THE WBKVIB IN TERMS OF THE MOM OF THE 3rd BOARD MEETING OF 2022-23

VIEW
09.03.2023

WALK-IN-INTERVIEW OF KHADI OFFICE

VIEW
30.12.2022

STATE LEVEL KHADI MELA 2023

VIEW
27.12.2022

CORRIGENDUM  DATE  EXTENSION

VIEW 
15.12.2022 

RENOVATION & REPAIRING WORK OF EXISTING SET-UP MACHINERIES IN DASGHARA HMP CENTER DHANIAKHALI, HOOGHLY UNDER WBKVIB

VIEW 
20.12.2022PUBLISHING OF TENDER NOTICE ON THE DEPARTMENTAL WEBSITEVIEW
15.12.2022CONSTRUCTION OF TOILET BLOCK, PARTITION WALL SANITARY & PLUMBING WORK FOR CHAIRMAN ROOM ON 2ND FLOOR AT HEADOFFICE BUILDING UNDER WBKVIBVIEW
14.06.2022SUPPLY & INSTALLATION OF COMPUTER & PERIPHERALSVIEW
01.06.2022REPLACEMENT AND MAINTENANCE OF ALL EXISTING BRANDED FIRE EXTINGUISHERS AT THE HEAD OFFICE BUILDINGVIEW
29.11.2021SELECTION OF THIRD-PARTY ORGANISATION FOR THE FINANCIAL YEAR 2021-22 FOR TESTING & QUALITY CHECKING OF PRODUCTSVIEW
02.09.2021DISTRIBUTORSHIP/DEALERSHIP OF TUBE-PACKED NALEN GURVIEW
12.02.2021CONSTRUCTION OF TWO-STORIED RCC FRAMED BUILDINGS FOR RURAL CRAFT AND CULTURAL HUB OF GURUNG DEVELOPMENT BOARD AT POLOLEGAON VIEW
16.12.2020APPLICATION FORM FOR SANCTIONING FAMILY PENSIONVIEW
16.12.2020APPLICATION FOR SANCTION OF  PENSIONVIEW
 01.12.2020VISITOR WISH LIST FORM VIEW
01.12.2020MSME DIRECTORATEVIEW
01.12.2020FORM - FICCI ANNUAL EXPO 2020 VIEW
01.12.2020FICCI ANNUAL EXPO 2020 EXHIBITION BOOTH SPECIFICATIONVIEW
01.12.2020FAE 2020 - BOOTH SPECIFICATION ADDITIONAL SERVICESVIEW
10.02.2020CONSTRUCTION OF SINGLE-STORIED CFC BUILDING FOR PROJECT WOMEN CLUSTER DEVELOPMENT AT KENJAKURAVIEW
17.02.2020 CONSTRUCTION OF CFC BUILDING FOR PROJECT MULBERRY SILK AT SINDEBONG KHASMAHAL ON PLOT NO 2027 VIEW 
 20.01.2020ADDITIONAL CONSTRUCTION ADJACENT LAND DEVELOPMENT AND BOUNDARY WALL WORK OF PROJECT MEKHLA AT BOXIRHAT  VIEW  
05.12.2019 DECORATION OF FAIRGROUND FOR STATE LEVEK KHADI FAIR AT TALTALA GROUND KOLKATA   VIEW   
18.11.2019ADDITIONAL WORK FOR CPC BUILDING OF PROJECT KANTHA STITCH AT BHEDIA PURBAPARA JANAKALYAN SWECHHASEVI SANGHA VIEW 
01.10.2019ADDITIONAL GARDEN WITH DECORATION FOR CPC PROJECT AT SUSUNIA   VIEW  
27.09.2019ADDITIONAL HEIGHT OF BUILDING FOR CPC PROJECT AT SUSUNIA   VIEW 
26.09.2019 LAND DEVELOPMENT AND DECORATION OF KITCHEN OR CPC PROJECT AT SUSUNIA  VIEW  
 25.09.2019EXCESS WOODWORK AND ANCILLARY WORK FOR CPC PROJECT AT SUSUNIA VIEW  
11.09.2019BOUNDARY WALL OF CPC UNDER PROJECT MUSLIN OF MAHILA SILK & COTTON KHADI TRUST AT SIMULIA  VIEW  
06.09.2019 REPAIR OF COMMON TOILET BLOCK OF KHADI HEAD OFFICEVIEW 
06.09.2019RENOVATION & DECORATION OF COMMON TOILET BLOCK 3RD FLOOR OF KHADI HEAD OFFICE VIEW
30.08.2019FRONT SHOW ACP DECORATION AND OTHER WORKS AT GRAMIN SHOWROOM AT BAGHAJATIN VIEW
30.08.2019 ELECTRICAL WIRING AND FITTINGS INSTALLED AT GRAMIN SHOWROOM AT BAGHAJATIN ROAD KOLKATAVIEW
26.08.2019LAND DEVELOPMENT & ANCILLARY WORK FOR THE FOUNDATION AREA OF THE CFC BUILDING OF PALLY SILPA BIKASH KENDRA AT ISLAMPUR VIEW 
26.08.2019ADDITIONAL WORK ON THE CFC BUILDING OF PALLY SILPA BIKASH KENDRA AT ISLAMPUR VIEW 
19.08.2019CONSTRUCTION OF ROAD RENOVATION OF OLD BUILDING AND OTHER ANCILLARY WORK AT CENTER OF EXCELLENCE-KHADI ASHOKENAGARVIEW
 16.08.2019SHOWROOM WALL FURNITURE FOR THE SHOP ROOM OF GRAMIN SHOWROOM AT BAGHAJATIN STATION ROAD  VIEW 
05.08.2019RENOVATION & DECORATION OF COMMON TOILET BLOCK 2 ND FLOOR OF KHADI HEAD OFFICE VIEW 
30.07.2019 DRAWING ROOM AND STUDY ROOM FINISHING AND DECORATION WORK ON 2ND FLOOR OF MUSLIN TIRTHO AT MALDA   VIEW  
30.07.2019 CONSTRUCTION OF ARTIFICIAL STONE FLOOR FINISH FOR KULIA TANTUBAYA MAHILA SAMITY AT BASAPARA VIEW 
30.07.2019 CONSTRUCTION OF FOUNDATION OF THE SHOWROOM AT KULIA TANTUBAYA MAHILA SAMITY AT BASAPARAVIEW 
 30.07.2019DECORATION OF OFFICE DO ROOM AT CPC OF PROJECT MUSLIN AT AILAKANDI   VIEW  
30.07.2019ADDITIONAL WORK FOR CONSTRUCTION OF CONCRETE ROOF AT 2 ND FLOOR DRAWING-ROOM AT MUSLIN TIRTHO MALDA  VIEW  
30.07.2019DRAWING ROOM AND STUDY ROOM FINISHING AND DECORATION WORK ON 2 ND FLOOR VIEW 

29.07.2019

CONSTRUCTION OF CPC BUILDING FOR PROJECT MEKHLA AT BOXIRHATVIEW

22.07.2019

CONSTRUCTION OF C.F.C BUILDING FOR DHEKI-CHATA CHAL AT CHATNA BLOCKVIEW 
 18.07.2019ADDITIONAL TIE BEAM AND BRICKWORK UP TO PLINTH LEVEL TIE BEAM AT SABONG VIEW  
18.07.2019 DRAINAGE AND SHED DYING UNIT AT COMMON SINK AREA AT CENTER OF EXCELLENCE SABAI & SAL LEAF PROJECT VIEW  
18.07.2019LAND DEVELOPMENT BY FILLING OF SOIL AND SILVER SAND INCLUDING SATURATION WITH WATER AT SABONG VIEW  
18.07.2019 LAYING PAVER BLOCK FOR CPC OF PROJECT MUSLIN AT ALIAKANDI VIEW  
 18.07.2019 LAYING ROOF TILES FOR CPC OF PROJECT MUSLINVIEW  
18.07.2019 

SHED AT BACKSIDE OF 2 ND BUILDING AT CENTER OF EXCELLENCE SABAI & LEAF 

VIEW   
18.07.2019

REPAIR OF COMMON TOILET BLOCK 1ST FLOOR OF KHADI HEAD OFFICE 

VIEW  
18.07.2019

REPAIR OF COMMON TOILET BLOCK 2 ND FLOOR OF KHADI HEAD OFFICE 

VIEW  
16.07.2019 

INTERIOR DECORATION OF CFS SAL LEAF, EXHIBITION GALLERY, GUEST ROOMS, AND OFFICE BUILDING AT BANKURA 

 VIEW    
16.07.2019 INTERIOR DECORATION OF OFFICE BUILDING AT COOCHBEHARVIEW   
12.07.2019  ELECTRIFICATION OF COMMON TOILET BLOCK OF KHADI HEAD OFFICEVIEW   
12.07.2019RENOVATION & DECORATION OF COMMON TOILET BLOCK OF KHADI HEAD OFFICE  VIEW   
05.07.2019 CONSTRUCTION OF CPC GRAMIN KUTIRSHILPA GRAMODYOG KUTIR AT SIMULIA
VIEW 
28.06.2019 CONSTRUCTION OF CPC OF GOUR GRAMIN SILK UNNAYAN SAMITY AT KALIACHAKVIEW 
28.06.2019EXTENSION AND LAND DEVELOPMENT OF CPC UNDER PROJECT MUSLIN OF ADARSHA KHADI PRATISTHAN AT SIMULIAVIEW  
28.06.2019SUPPLY OF SET OF MACHINERY FOR SETTING UP OF LARGE CARDAMOM PROCESSING CLUSTER AT KALIMPONG VIEW  
28.06.2019 SUPPLY OF SET OF TESTING EQUIPMENT AND MACHINERY FOR SETTING UP OF MOA HUB AT JOYNAGARVIEW  
27.06.2019  CAR SHED AT BAHARAMPUR DISTRICT OFFICE EASTVIEW   
23.05.2019 LAYING PAVER BLOCK FOR CPC OF PROJECT MUSLIN AT BANKURA TOWNVIEW  
23.05.2019 LAYING ROOF TILES FOR CPC OF PROJECT MUSLIN AT BANKURA TOWNVIEW 
13.05.2019SUPPLY OF VARIOUS ITEMS INCLUDING OF FITTING & FIXING IF NECESSARY OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIBVIEW
13.05.2019FURNITURE & FIXTURE OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIBVIEW
 22.04.2019CAR SHED AT BAHARAMPUR DISTRICT OFFICE SOUTH  VIEW    
22.04.2019CAR SHED AT BAHARAMPUR DISTRICT OFFICE WESTVIEW   
22.04.2019 DEVELOPMENT OF LAND FOR CPC OF PROJECT MUSLIN AT AILAKANDI VIEW   

28.03.2019 

 SOLING WORK OF ADJACENT AREA FOR CPC BUILDING OF PROJECT MUSLIN AT ALIAKANDIVIEW   
08.05.2019 ELECTRICAL FITTING FIXING OF ALL-NEW FITTINGS OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIBVIEW 
22.04.2019 DECORATION WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIBVIEW 

24.04.2019

ADDITIONAL WORK FOR PLINTH PROTECTION & OTHER WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIBVIEW

22.04.2019

ADDITIONAL WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIBVIEW
06.03.2019 VITRIFIED TILES ON GROUND FLOOR, CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIBVIEW 
27.02.2019  INTERNAL DECORATION OF GUEST ROOM FOR CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIBVIEW 
27.02.2019INTERNAL DECORATION FOR CPC OF PROJECT MUSLIN AT AILAKANDI, DIST. BANKURA UNDER WBKVIBVIEW
06.03.2019INCREASE OF PLINTH HEIGHT FOR CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIBVIEW
27.02.2019PLINTH PROTECTION FOR CPC AT SIMLAPAL, DIST. BANKURA UNDER WBKVIBVIEW
27.02.2019INCREASE OF PLINTH HEIGHT FOR CPC AT SIMLAPAL, DIST. BANKURA UNDER WBKVIB VIEW
01.03.2019  ADDITIONAL WORK OF 1ST FLOOR SHOP AREA & ADJACENT WORKS OF CPC PROJECT AT SUSUNIAVIEW 
27.02.2019BRICKWORK AND FLOORING FINISH AND OTHER ANCILLARY WORK FOR ENTIRE NEW CONSTRUCTIONVIEW
25.01.2019CONSTRUCTION & DECORATION OF 3 NOS. MAIN BOUNDARY GATE UNDER PROJECT KHES AT LAVPURVIEW
01.03.2019 CONSTRUCTION OF C.P.C. OF COTTON KHADI BUILDING AT BARIVIEW
01.03.2019CONSTRUCTION OF CFC BUILDING FOR PROJECT SILK AT LAVPURVIEW
01.03.2019CONSTRUCTION OF CPC BUILDING OF R.C.C.H PROJECT AT GOSABSVIEW
15.02.2019DEVELOPMENT OF LAND FOR CONSTRUCTION OF CPC UNDER PROJECT KHES AT LAVPURVIEW
25.01.2019DEVELOPMENT OF LAND FOR CONSTRUCTION OF CPC UNDER PROJECT KHESVIEW
15.02.2019ELECTRICAL WIRING AND FITTING FIXING OF ALL NEW FITTING & FISCHER FOR THE CFC BUILDING WITH SUBMERSIBLE PUMP ETCVIEW

 

22.01.2019DYING UNIT AT HARISHPUR MUSLIN PRODUCTION CENTER AT DIST-HOWRAH UNDER WBKVIBVIEW
22.01.2019 DRAINAGE AND SHED FOR DYING UNIT AT HARISHPUR MUSLIN PRODUCTION CENTER AT DIST-HOWRAH UNDER WBKVIB VIEW
25.01.2019CONSTRUCTION OF CPC OF PROJECT KADMA,BATASA AT VILL- SHYAMGANJPARA, WARD- 15 VIEW
25.01.2019CONSTRUCTION OF KHADI PRODUCTION CENTRE BUILDING AT VILL+PO-MOHANDIH,DIST-PURULIAVIEW
22.11.2018DECORATION OF FAIR GROUND FOR STATE LEVEL KHADI FAIR 2018 AT TALTALA GROUND ,KOLKATA UNDER WEST BENGAL KHADI & VILLAGE INDUSTRIES BOARD VIEW
14.09.2018TRUSS AND OTHER ANCILLARY WORK ON GROUND FLOOR AT CHALTABERIA,DIST-NORTH 24 PGS UNDER WBKVIBVIEW
14.09.2018CONSTRUCTION OF ROOF TRUSS AT CHALTABERIA, DIST. NORTH 24 PGS UNDER WBKVIBVIEW
 18.01.2019CONSTRUCTION OF CPC BUILDING OF PROJECT POTTERY FOR BIRNAGAR MRITSHILPA GUCHHA UNNAYAN PRAKALPA AT BIRNAGAR PURATAN DIGHIRPAR,DIST-NADIAVIEW
 17.01.2019EXTRA WORK FOR CARRYING AND FILLING OF SILVER SAND INCLUDING SATURATION AND ADDITIONAL ORDER FOR FLOOR TILES FOR THE OFFICE ROOM AT BHUNIAKHALI GRAMBIKASH KENDRAVIEW
 17.01.2019EXTRA WORK FOR PLUMBING, SANITARY AND PAINTING WOK AT BHUNIAKHALI GRAMBIKASH KENDRA VIEW
 25.07.2018CONSTRUCTION OF ROOF TRUSS(NORTHERN SIDE)AT GAJA TANTUBAY SAMABY SAMITY LTD,GAZA,UDAYNARAYANPUR,DIST-HOWRAH UNDER WBKVIB VIEW
18.09.2018 RENOVATION OF VIP ROOM OF 1 ST FLOOR OF WBKVIB OFFICE BUILDING AT 12 BBD BAG,KOLKATA-700001VIEW 
18.09.2018CONSTRUCTION OF RAMP OF CPC UNDER PROJECT MUSLIN AT HARISHPUR,DIST.HOWRAH UNDER WBKVIBVIEW
18.09.2018CONSTRUCTION OF FLOOR FINISH OF CPC UNDER PROJECT MUSLIN AT HARISHPUR,DIST.HOWRAH UNDER WBKVIB VIEW
18.09.2018CONSTRUCTION OF CFC BUILDING FOR PROJECT MUSLIN AT LAVPUR,DIST-BIRBHUM UNDER WBKVIBVIEW
21.08.2018GARDEN FOR CPC PF PROJECT MUSLIN AT ASHOKENAGAR (NORTHERN SIDE), DIST-NORTH 24PGS UNDER WBKVIBVIEW
24.08.2018 REPAIR, RENOVATION, DECORATION & ELECTRICAL WOKS OF SHOWROOM OF KHADI (GRAMIN) AT PARK CENTER, KOLKATA VIEW
02.08.2018 NEW FITTING FIXTURE AND SOME CIVIL WORKS OF NEW BUILDING FOR MUSLIN EXHIBITION CUM SALES FOR FOREIGN TOUR CIRCUIT AT SASHINAGAR ,DIST-BURDWAN UNDER WBKVIB VIEW
26.07.2018 ELECTRICAL WIRING AND FITTING OF ALL NEW FITTINGS & FIXTURE AT MERCHANDISING ROOM AT 1st FLOOR AT 12 BBD BAG,KOLKATA-700001 VIEW
25.07.2018  CONSTRUCTION OF ROOF TRUSS (SOUTHERN SIDE) AT GAZA TANTUBAY SAMABAY SAMITY LTD.,GAZA ,UDAYNARAYANPUR,DIST- HOWRAH UNDER WBKVIBVIEW
26.07.2018 CONSTRUCTION OF ENTRANCE GATE,JACQUARD FOUNDATION AND OTHER ANCILLARY WORK OF GIGANJ RESHAM KHADI SANGHA AT GIAGANJ,MURSHIDABAD UNDER WBKVIB VIEW
26.07.2018CONSTRUCTION OF CPC BUILDING(PHASE-II)FOR GIAGANJ RESHAM KHADI SANGHA AT GIAGANJ,MURSHIDABAD UNDER WBKVIBVIEW
 16.07.2018 Supply and installation of high resolution projector (10M visibility) with standy screen 6'x4' size with HP i5 processor laptop adding 17 screen for 4(Four) Muslin Tirtha's of WBKVIBVIEW
 16.07.2018Repair and renovation merchandising room at 1st floor at 12 BBD Bag, Kolkata-700001 VIEW
16.07.2018Furniture at Gramin Showroom at Baharmpore MallVIEW
16.07.2018Electrical wiring and fitting of all new fitting & fixture at Giaganj Resham Khadi Sangha at Giaganj, Murshidabad under WBKVIBVIEW
 16.07.2018Decoration at merchandising room at 1st floor at 12 BBD Bag, Kolkata-700001 VIEW
 16.07.2018 Construction of Truss on Ground Floor of Giaganj Resham Khadi Sangha at Giaganj, Murshidabad under WBKVIBVIEW
16.07.2018 Construction of roof truss and ancillary work at Gaza Tantubay Samabay Samity Ltd. Gaza, Udaynarayanpur, Dist Howrah under WBKVIBVIEW
 16.07.2018  Construction of roof truss (Eastern Side) at Gaza Tantubay Samabay Samity Ltd, Gaza, Udaynarayanpur, Dist - Howrah under WBKVIBVIEW
 18.06.2018  SUPPLY AND INSTALLATION OF BEE HIVES AND ACCESSORIES TO WBKVIBVIEW
 25.05.2018  ELECTRICAL WIRING AND FITTING OF ALL NEW FITTINGS & FIXTURE FOR THE GUEST ROOM, STAIR CASE , SUBMERSIBLE AT CFC MANTHAN MAHILA KHADI SAMITY AT SUJAPUR, MALDAVIEW
 08.06.2018 CONSTRUCTION OF GUEST ROOM AND STORE ROOM AT 1ST FLOOR OF CPC FOR MANTHAN MAHILA KHADI SAMITY AT BOUNDARY SUJAPUR, MALDAVIEW
 08.06.2018CONSTRUCTION OF BOUNDARY WALL OF CPC FOR MANTHAN MAHILA KHADI SAMITY AT BOUNDARY SUJAPUR, MALDA VIEW
 18.06.2018CONSTRUCTION OF CPC FOR MUSLIN AT GOPIBALLAVPUR (PHASE II), JHARGRAM VIEW
 18.06.2018CONSTRUCTION OF PRODUCTION CENTRE FOR MUSLIN AT HARISHPUR (PHASE II), UDAYNARAYANPUR VIEW
  20.06.2018  WOOD WORK AND FILLING WORK OF MANTHAN MAHILA KHADI SAMITY AT BOUNDARY SUJAPUR, MALDAVIEW
 20.06.2018 DECORATION WORK FOR FLOOR FINISHING BY VITRIFIED TILES OF CPC FOR MANTHAN MAHILA KHADI SAMITY AT BOUNDARY SUJAPUR, MALDAVIEW
 16.05.2018CONSTRUCTION OF GUEST ROOM AT CFC OF SATHI SEVA SAMITY AT AT DARIRJANGAL AT SANDESHKHALI,24 PARGANAS VIEW
 03.05.2018 WORK FOR FLOOR FINISHING BY VITRIFIED TILES OF CFC FOR JOYGOPALPUR AT SANDESHKHALI,24 PARGANASVIEW
 03.05.2018GATE & OTHER ANCILLARY WORK AT JOYGOPALPUR AT SANDESHKHALI,24 PARGANAS VIEW
 03.05.2018ADDITIONAL CONSTRUCTION OF CPC AT KALIACHAK,MALDA VIEW
 03.05.2018 ELECTRICAL WIRING AND FITTING FIXING OF ALL NEW FITTINGS & FIXTURE CPC AT KALIACHAK,MALDAVIEW
 24.04.2018 ROOF TRASS OF CFC AT SATHI SEVA SAMITY AT SANDESHKHALIVIEW 
 24.04.2018ROOF TRASS OF CFC AT JOYGOPALPUR YOUTH DEVELOPMENT CENTRE AT JOYGOPALPUR VIEW
 24.04.2018CONSTRUCTION OF SHOWROOMS FOR JOYGOPALPUR YOUTH DEVELOPMENT CENTRE AT SANDESHKHALI VIEW
 24.04.2018 CONSTRUCTION AND RENOVATION OF OLD OFFICE ROOM AT GROUND FLOOR WITH NECESSARY DECORATION OF CFC AT SATHI SEVA SAMITY AT SANDESHKHALIVIEW
  18.04.2018  PAINTING WORK AT 4TH FLVIEW
 18.04.2018 INTERNAL WOOD PARTITION WORKVIEW
 19.04.2018ELCTRICAL WIRING AND FITTING AT CPC UNDER PROJECT MUSLIN AT DOMKALVIEW
 24.04.2018CONSTRUCTION OF GUEST ROOM AT TOP FLOOR OF EXISTING BUILDING AT DOMKAL-PHASE-II VIEW
 19.04.2018CONSTRUCTION OF GUEST ROOM AT TOP FLOOR OF EXISTING BUILDING AT DOMKAL VIEW
 18.04.2018 4TH FL LOBBY DECORATIONVIEW
  23.03.2018 CONSTRUCTION OF CPC BUILDING AT SONAMUKHI,BANKURA VIEW
  23.03.2018  CONSTRUCTION OF CPC BUILDING FOR VERMICOMPOST AT RATHERHAT, JALPAIGURIVIEW
 23.03.2018 CONSTRUCTION AND INTERIOR DECORATION AT JHARGRAM, MIDNAPOREVIEW
 23.03.2018 CONSTRUCTION OF CPC BUILDING OF MUSLIN AT KALIACHAK, MALDAVIEW
 26.02.2018 CONSTRUCTION OF CFC BUILDING UNDER RCCH PROJECT AT MALDI, PURULIAVIEW
22.02.2018CONSTRUCTION OF CPC BUILDING OF ADARSHA KHADI PRATISTAN AT SIMULIA, MURSHIDABADVIEW
12.02.2018CONSTRUCTION OF CPC BUILDING OF PROJECT SALPATA AND SABAI AT JAGANNATHPUR,SIMLAPAL BANKURAVIEW
 12.02.2018 CONSTRUCTION OF CPC BUILDING OF PROJECT SABAI AT JHILMILI, BANKURAVIEW
 15.02.2018 CONSTRUCTION OF CPC BUILDING OF PROJECT KHESH UNDER PPP MODEL AT BAKUL,LAVPUR, DIST - BIRBHUMVIEW
 31.01.2018 CONSTRUCTION OF CPC BUILDING AT BHUNIAKHALI GRAMBIKASH KENDRAVIEW
 29.01.2018CONSTRUCTION OF CPC BUILDING INCLUDING ELECTRIFICATION FOR MADURKATHI AT SABANG AND PINGLA VIEW
 29.01.2018 CONSTRUCTION OF CPC UNDER PROJECT MUSLIN OF GAZA TANTUBAY SAMABAY SAMITY LTD.VIEW
 11.01.2018 COMPLETE REPAIR, RENOVATION AND DECORATION OF WBKVIB HEAD OFFICEVIEW
  04.01.2018  CONSTRUCTION OF CPC OF PROJECT MUSLIN (PHASE II)VIEW
 27.12.2017CONSTRUCTION OF CPC BUILDING OF AT BISWA RESHAM KHADI GRAMODYOG SANGHA VIEW
13.12.2017NOTICE INVITING TENDER FOR BANKURA TOWN, BANKURA & HARISHPUR, HOWRAHVIEW
 23.10.2017 EXPRESSION OF INTEREST FOR WEAVING CLUSTER AT KENJAKURA, BANKURAVIEW
 16.05.2017EXPRESSION OF INTEREST - MALDA VIEW
  10.08.2016 CONSTRUCTION OF CPC BUILDING OF NABIN CHANDRA RESHAM KHADI GRAMODYOG SAMITY, GOKARNA, MURSHIDABAD UNDER WBKVIB VIEW
 10.08.2016 CONSTRUCTION OF CPC BUILDING OF DULALGANJ GRAMIN SILK REELING & WEAVING UNNAYAN SAMITY,GAYASBARI, MALDA UNDER WBKVIBVIEW
  10.08.2016 CONSTRUCTION OF CPC BUILDING OF DOMKAL MAHILA GRAMODYOG RESHAM 'O' KHADI SAMITY, DOMKAL, MURSHIDABAD UNDER WBKVIB VIEW
 10.08.2016CONSTRUCTION OF CPC BUILDING OF BASWA RESHAM KHADI KUTIR, BASWA, BIRBHUM UNDER WBKVIB VIEW
 10.08.2016CONSTRUCTION OF CFC AT CHALTABERIA GANO UNNAYAN SANSTHA, NORTH- 24 PARGANAS (WB) VIEW
 26.04.2016 NOTICE INVITING QUOTATION FOR SPINNING 400s METRIC COUNT OF MUSLIN YARN ON CHARKHAVIEW
 26.06.2015REPAIR, RENOVATION OF CLUSTER DEVELOPMENT BUILDING & EXISTING OFFICE BUILDING WITH NEW ANNEX BUILDING CONSTRUCTION AT 2D, BARRACK SQR, BAHARAMPUR UNDER WBKVIB.VIEW
 26.06.2015 CONSTRUCTION OF OFFICE BUILDING AT SONAMUKHI, BANKURA.VIEW
 26.06.2015CONSTRUCTION OF TWO STORIED BUILDING FOR PATACHITRA CLUSTER DEVELOPMENT WORK AT PINGLA, PASCHIM MIDNAPORE. VIEW
 21.04.2015CONSTRUCTION OF CFC BUILDING AT NADIA UNDER PROJECT MUSLINVIEW
 29.01.2015TENDER NOTICE FOR CONSTRUCTION OF NOA ORNAMENTS CLUSTER BUILDING AT UDAYNARAYANPUR, UNDER UDAYNARAYANPUR DEV. BLOCK. DIST- HOWRAHVIEW
  07.01.2015  SEALED QUOTATIONS FOR INTERNAL AUDIT AND THEREAFTER PREPARATION OF FINAL ACCOUNTSVIEW
22.12.2014CONSTRUCTION OF CFC UNDER CLUSTER DEVELOPMENT PROGRAMME (RCH) AT NATUNGRAM, BLOCK: PURBASTHALI–II, DIST.: BARDHAMAN, WEST BENGAL. (WOODEN DOLL)VIEW
 22.12.2014 RENOVATION & CONSTRUCTION OF CFC BUILDING UNDER CLUSTER DEVELOPMENT PROGRAMME (RCH) AT MAHISBATHAN, BLOCK: KUSHMUNDI, DAKSHIN DINAJPUR, WEST BENGAL. (WOODEN MASK) VIEW
 22.12.2014CONSTRUCTION OF CFC UNDER CLUSTER DEVELOPMENT PROGRAMME (RCH) AT BLOCK: AUSHGRAM – I, DARIYAPUR, DIST.: BARDHAMAN, WEST BENGAL. (DOKRA) VIEW
 22.12.2014 RE TENDERS FOR SUPPLY OF LIQUID JIGGERY (NALEN GUR) IN PACKET FORM.VIEW
 05.12.2014 NOTICE INVITING QUOTATION FOR SUPPLY OF LIQUID JIGGERY (NALEN GUR) IN PACKET FORM.VIEW
  03.12.2014  NOTICE INVITING QUOTATION FOR ENTIRE OLD STOCK OF KHADI / SILK / READY MADE GARMENTSVIEW
  09.07.2014 REPAIRING & RENOVATION OF OFFICER'S ROOM ON SOUTH-WEST SIDE OF 3RD FLOOR OF KVIB OFFICE BUILDING 12,B.B.D BAG,KOLKATA – 1. VIEW
 02.07.2014REPAIRING & RENOVATION OF OFFICER'S ROOM ON SOUTHERN SIDE OF 3RD FLOOR OF KVIB OFFICE BUILDING 12,B.B.D BAG,KOLKATA – 1. VIEW
 02.07.2014REPAIRING & RENOVATION OF OFFICER'S ROOM ON NORTHERN SIDE OF 3RD FLOOR OF KVIB OFFICE BUILDING 12,B.B.D BAG,KOLKATA – 1. VIEW
  24.06.2014  REPAIRING & RENOVATION OF OFFICER'S ROOM ON SOUTHERN SIDE OF 2ND FLOOR OF KVIB OFFICE BUILDING 12,B.B.D BAG,KOLKATA – 1.VIEW
 16.06.2014REPAIRING & RENOVATION OF OFFICER'S ROOM ON NORTHERN SIDE OF 2ND FLOOR OF KVIB OFFICE BUILDING 12,B.B.D BAG,KOLKATA – 1. VIEW
 31.03.2014QUOTATION FROM CHARTERED ACCOUNTANT FIRM FOR REPARATION OF FINAL ACCOUNTS FOR THE YEAR 2012-13VIEW
 07.02.2014TENDER FOR SEWING /STITCHING MACHINE for SAL LEAF PLATE/BOWL STITCHINGVIEW
 22.01.2014TENDER NOTICE FOR CONSTRUCTION OF BATHROOM CUM WATER CLOSETS & URINALVIEW
 16.01.2014 Tender for Roof Treatment work on top Floor (5th) of KVIB office building at 12, B.B.D. Bag , Kolkata -1 for northern side of the building.VIEW
  16.01.2014  Tender for Roof Treatment work on top Floor (5th) of KVIB office building at 12, B.B.D. Bag , Kolkata -1 for southern side of the building.VIEW
 05.12.2013 TENDER FOR DECORATION OF STALL AT SANTINIKETAN POUSH MELAVIEW
27.11.2013SUPPLY OF PADEL OPERATED SABAI/BABUI ROPE MAKING MACHINES AND BABUI/SABAI ROPE TWISTING MACHINESVIEW
27.11.2013SUPPLY OF 20 NOS. OF BIO-MASS OPERATED SAL LEAF PLATE/BOWL MAKING MACHINESSUPPLY OF 20 NOS. OF BIO-MASS OPERATED SAL LEAF PLATE/BOWL MAKING MACHINESVIEW
27.11.2013103 K ROTARY STITCH MASTER FOOT OPERATED STITCHING MACHINE OF USHA COMPANY AND POWER OPERATED (ELECTRIC) SAL LEAF MOLDING MACHINE(HEAVY ) WITH DICEVIEW
25.11.2013TENDER FOR WOODEN STOOLSVIEW
25.11.2013TENDER FOR SEWING MACHINEVIEW
25.11.2013TENDER FOR MOULDING MACHINEVIEW
12.11.2013TENDER NOTICE FOR SALEVIEW
13.12.2017  NOTICE INVITING TENDER FOR BANKURA TOWN, BANKURA & HARISHPUR, HOWRAHVIEW
22.01.2019CONSTRUCTION OF GUEST ROOM ON OLD BUILDING OF GRAMIN KUTIR AT SALAR , DIST.MURSHIDABAD UNDER WBKVIBVIEW
22.01.2019CONSTRUCTION OF CPC BUILDING(PHASE II) FOR GRAMIN KUTIRSILPA GRAMODYOG KUTIR AT SALAR,DIST.MURSHIDABAD UNDER WBKVIBVIEW
04.02.2019CONSTRUCTION OF CPC BUILDING OF PROJECT KANTHA STITCH AT VIVEKANANDA CHILD ACADEMY,NH 2B,BAGBARI,BHEDIA,DIST-PURBA BURDWAN UNDER WBKVIBVIEW
09.01.2019REPAIR,RENOVATION & INSTALLATION OF IRON STELL SPIRAL STAIR WITH ROOF TREATMENT AT NOA ORNAMENT CLUSTER,GAZA,DIST- HOWRAH UNDER WBKVIBVIEW
12.02.2019CONSTRUCTION OF ROOF TRUSS OF BUILDING FOR VERMICOMPOST AT RATHERHAT,JALPAIGURI UNDER WBKVIBVIEW
12.02.2019 DEVELOPMENT OF LAND FOR CPC AT RANPUR, DIST- BANKURA UNDER WBKVIBVIEW
 12.02.2019 PLINTH POTECTION FOR CPC OF PROJECT MUSLIN AT RANPUR, DIST. BANKURA UNDER WBKVIB VIEW
 12.02.2019  CAR SHED AT BAHARAMPUR DISTRICT OFFICE (NORTH),DIST-MURSHIDABAD UNDER WBKVIBVIEW
12.02.2019CAR SHED AT BAHARAMPUR DISTRICT OFFICE (NORTH EAST),DIST-MURSHIDABAD UNDER WBKVIBVIEW
12.02.2019PLINTH PROTECTION & ANCILLARYWORK FOR CONSTRUCTION OF WERMICOMPOST AT RSTHERHAT,JALPAIGURI UNDER WBKVIBVIEW
 21.02.2019 CONSTRUCTION OF CFC BUILDING FOR RCCH PROJECT AT VILL- GHORBHANGAVIEW
 21.02.2019 CONSTRUCTION OF CFC BUILDING OF RCCH PROJECT AT JALANGIVIEW
  21.02.2019  CONSTRUCTION OF RCCH PROJECT (BHAWAIYA )AT SALKUMARVIEW
 12.02.2019CONSTRUCTION OF ENTRANCE GATE AND OTHER ANCILLARY WORK OF GRAMIN KUTIR SHILPA AT SALARVIEW
 15.02.2019ADDITIONAL & EXTRA WORK FOR CONSTRUCTION OF DRAWING ROOM AT 2 ND FLOOR INFRONT OF GUEST ROOM AT MUSLIN TIRTHOVIEW
15.02.2019CONSTRUCTION OF RAMP OF CPC UNDER PROJECT MUSLIN AT HARISHPURVIEW
12.02.2019CONSTRUCTION OF ROOF TRUSS OF GRAMIN KUTIRSILPA GRAMODYOG KUTIR AT SALARVIEW
15.02.2019CONSTRUCTION OF FLOOR FINISH OF CPC UNDER PROJECT MUSLIN  VIEW
15.02.2019  DEVELOPMENT OF LAND FOR CPC AT RAIPURVIEW
15.02.2019 INCREASE OF PLINTH HEIGHT FOR CPC AT RAIPUR VIEW
15.02.2019REPAIR,RENOVATION OF OLD ROOF TRUSS AND PROVIDING FALSE CEILING VIEW
 27.02.2019RENOVATION,ADDITION,ALTERATION OF MUSLIN TIRTHO WITH MAKING OF FALSE CELLING AT MALDA VIEW
15.02.2019PLINTH PROTECTION WITH OTHER ANCILLARY WORK FOR CPC BUILDING AT SABONGVIEW
15.02.2019LAYING SURFACE DRAIN FOR CPC OF PROJECT MUSLIN AT BAKURA TOWN (South Side)VIEW
15.02.2019LAYING SURFACE DRAIN FOR CPC OF PROJECT MUSLIN AT BAKURA TOWN (North Side)VIEW
15.02.2019EXCESS HEIGHT OF BOUNDARY WALL FOR CONSTRUCTION OF CPC UNDER PROJECT KHESVIEW