|
We have 60 guests and no members online
Here is where I will blog all about the parks of Australia.
You can make a blog on your website by creating a category to write your blog posts in (this one is called Park Blog). Each blog post will be an article in that category. If you make a category blog menu link with 1 column it will look like this page, if you display the category description then this part is displayed.
To enhance your blog you may want to add extensions for comments, interacting with social network sites, tagging, and keeping in contact with your readers. You can also enable the syndication that is included in Joomla (in the Integration Options set Show Feed Link to Show and make sure to display the syndication module on the page).
These are my photos from parks I have visited (I didn't take them, they are all from Wikimedia Commons).
This shows you how to make a simple image gallery using articles in com_content.
In each article put a thumbnail image before a "readmore" and the full size image after it. Set the article to Show Intro Text: Hide.
We search the whole countryside for the best fruit growers.
You can let each supplier have a page that he or she can edit. To see this in action you will need to create a user who is in the suppliers group.
Create one page in the growers category for that user and make that supplier the author of the page. That user will be able to edit his or her page.
This illustrates the use of the Edit Own permission.
BUDGET
The Khadi Commission formulates budget guidelines every year. Product based annual budget for the year 2018-19 was adopted by KVIC in its 647th meeting dated. 26.7.17. On the basis of such guidelines the Budgetary works have been done for the year 2018-19.
Khadi Institutions shall also identify the Khadi products which contribute maximum to their production & sales revenue.
Khadi Institutions increase their production by 10-20% annually without considering the demand potential in the market.
Allocation of target :-
The production target for various products has been fixed on prime cost of products. The annual target for all varieties like cotton, silk, wool & polyvastra will be the sum of the Prime Cost of all the products in each variety.
Budget Approval Process:-
The State Director shall form State Khadi Monitoring Committee (SKMC) for scrutinizing and recommending the Annual Action Plans Submitted by Khadi Institutions to the Zonal Committees at Zonal Level.The SKMC shall hold discussion with the Khadi Institutions only if it is necessary and in normalcourse the Khadi Institutions may not be called for any discussion.The SKMC will ensure that all the Khadi Institutions whose budgets are considered
should possess valid certificate & Khadi Mark.
Documents required to :-
1. Registration Certificate
be submitted 2. Up to date renewed Khadi Certificate.
3. Statement showing the position of E.M & H.D
4. No. of Artisans covered under JBY & the sum
Insured.
5. Detail of purchase.
6. Budget proposal in the prescribed format. (in
triplicate)
7. Resolution of Executive Committee regarding
submission of proposal for budget.
8. Audited Balance Sheet.
9. List of Artisans. (Spinners, Weavers, Reelers,
Turners etc.)
10. Infrastructure details.
11. Implements detail.
12. Annual Progress Report.
13. Confirmation of contribution towards AWFT
14. PAN Card
15. GST Registration detail.
In the year 2018’19 altogether 153 nos. proposal of Khadi Institutions under KVIB fold were accepted and got the valid Budgetary Production Target.
DIRECT PRODUCTION CENTER OF WBKVIB
KHADI CENTER OF EXCELENCE – THE PRIDE OF WBKVIB
WBKVIB’S vision is to create sustainable eco-system in the Khadi Sector which can maximize the utilization of resources and widen the area of operation to make the Board emerge as the KHADI leader in the Country in near future.
AT ASHOKNAGAR KVIB HAS DEVELOPED A KHADI CENTRE OF EXCELLENCE IN THE FORM OF KHADI PRODUCTION CUM SPINNING, WEAVING, PRE-PROCESSING UNIT WITH RAW MATERIALS BANK AND A SALES OUTLET OF THE PRODUCT PRODUCED AT THE CENTRE WHERE EVERY ACCOUNTS, REPORTS ETC. WILL BE COMPUTERIZED. |
Khadi Center of Excellence, Ashoknagar, North 24 Parganas.
CENTRE OF EXCELLENCE MAY REFER TO A GROUP OF PEOPLE, A CENTRE OR A SHARED FACILITY OR AN ENTITY THAT PROVIDES RESEARCH AND TRAINING SUPPORT FOR DIVERSIFICATION OF THE PRODUCTION AT THE DESIRED LEVEL. |
OBJECTIVES OF KHADI CENTRE OF EXCELLENCE
Yarn Producing at the Khadi Center of Excellence, Ashoknagar, North 24 Parganas. | Exposer Visit Programme at the Khadi Center of Excellence, Ashoknagar, North 24 Parganas. |
Skilling of artisans has been receiving focused attention. Skilling helps to familiarize the artisan with latest technology and design and helps upgrade the product up to the desired standard and to create an ICONIC Production Center within the West Bengal.
On 09.03.2011, Khadi and Rural Industries Awareness Camp was held at the Center of Excellence in Ashoknagar, West Bengal Khadi and Gramin Industry Board. There was the presence of Shri Mrityunjaya Bandyopadhyay, Honorable Chief Executive Officer, Special Secretary of the West Bengal Government. There were also Shri Madhusudan Naskar, Honorable Secretary of West Bengal Khadi and the Gramin Industry Board.
FACILITIES AVAILABLE AT THE CoE :
Measuring the success of CoE by –
Success of CoE
Note: Refugee rehabilitation commissioner, 10 Camac Street Cal - 17 allotted a land – C.S Plot no. 291& 290 covering an area of more or less (4) four bighas of land in Habra-Sub-Scheme No. IV mouza Tababeria for utilizing the same for the purpose of setting up a Khadi Spinning Centre giving preference to local refugee and shall cater the need of the refugees vide memo no. B/767/RC Dt. 12.03.73.
GROWTH AND DEVELOPMENT: WOVEN IN THREAD OF KHADI CENTRE
The district Howrah possesses tremendous variety in all respect and is almost a miniature of India in terms of variation it contains.
In industrial map of West Bengal, Howrah holds a promotional position. During British period Howrah city was called “Glasgow” or “Sheffield” of India. The rapid urbanization of the district has widen the scope of ‘msme’.
But it is a matter of astonishment to note that this district till 2014 was a “NO KHADI” district.
Following the above, a comprehensive study was conducted by a team formed by the authority. And the team headed by the CEO of the Board for the possibilities of setting up of a Board’s direct production unit who gave a patient hearing to the people of some of the villages of the district Howrah.
In the block Udaynarayanpur at Pancharul G.P area some weavers and social workers showed their willingness for setting up a Khadi Production Unit. It was also revealed that there was a high possibilities of setting up of a khadi production centre. Near about 5000 weavers family are changed in the trade of hand loom sector through “Mahajan” system since a long time.
After submission of a proposal, the same was accepted and approved by the KVIB authority. And soon after that the Board authority has rightly seized of the opportunity and has given utmost importance to undertake the skilling programme under Khadi by the quality trainer of Jhargram. Moreover WBKVIB took necessary steps for capacity building of 40 spinners and 25 weavers at the initial stage according to the felt need. After that, production started at the premises of only 5 nos. weavers house through facilitating agency of Udaynarayanpur Khadi O Gram Unnayan Sanstha, who acted also as the facilitator of the programme.
GEOGRAPHICAL LOCATION OF THE UNIT
Name of the site: Uttar Harishpur
Name of the G.P.: Pancharul
Name of the Block: Udaynarayanpur (Block lies between 22® 43’ 01” North latitude and between 87® 58’ 30” East latitude)
Population clensity: 2900/Sq. Km.
River: Damodar at North West
Boundary of the Block: North- Pursura Block (Hooghly)
South- Amta- I & II (Howrah)
East- Jangipara (Hooghly)
West- Khanakul (Hooghly)
Distance of the unit: 43 Km. from Howrah city
Previous livelihood of the artisans were mainly agricultural work and some were shifted from handloom activities who were mostly working in an un-organized set up which made them prone to exploitation by MAHAJON or MIDDLEMAN.
Series of efforts had been taken by the KVIB Head Quarter to redress the problems and since after two consecutive years the unit was started witnessing good growth in terms of production, development, sales etc. Besides that the same unit have already been established at gaza village under Kurchi Shibpur G.P under same block areas.
The average performance of the unit till date is more than that of other direct production unit of the Board. It had also created an enabling environment of spinning & weaving activities under a single roof as to render better services in the right direction. Now this centre is competent enough in all respect and may be termed as integration competency centre. From record we can say that each stakeholder- the Board, the facilitator, the artisans has performed their role properly in making quality fabric product and almost defect less spinning.
It is also heartening to note that the authority of the Board has identified the unit as the “TOP DEFFECT FREE PRODUCT PRODUCER” which result less wastage during next stage of production.
Spinning Activities | Weaving Activities |
Now, the centre is being promoted to a ‘KHADI COMPETENCY PRODUCTION UNIT, and restructed with the following-
A. i) Spinning Unit (40c yarn) = 80 nos. ii) Spinning Unit (70c yarn) = 40 nos. iii) Spinning Unit (100c – 150c) = 50 nos. B.Weaving unit with pre-loom activities C.Dying Unit D.Printing Unit E.Selling Unit: Fabrics are being sold to Khadi Institution |
Or,
Fabrics are lifted by the Central Store, 12, B.B.D. Bag, Kol- 700 001 for selling of ready to use materials through Khadi Gramin Outlets of Board.
Dyeing unit
At present there are 170 spinners and 80 weavers who were imparted the necessary development training and producing products as per the desired level.
“SAMRIDDHI” KHADI PRODUCTION CENTRE, UDAYNARAYANPUR, HOWRAH
Production Planning and Control (PPC) therefore, is an effort to optimize the process of conversion of raw materials into finished fabrics required in the market. Since various activities are involved in the conversion of raw materials into finished goods, PPC is and has to be an integrated function the production unit has to derive maximum benefit out of planning. All the functions have inter-links; and the more such inter links are considered in the planning process, the better will be the planning process.
KHADI SCHEMES
Scheme is a large-scale systematic plan or arrangement for attaining some particular object or putting a particular idea into effect. West Bengal Khadi & Village Industries Board implemented various scheme in order to employment generation.
CLUSTER DEVELOPMENT
CLUSTER DEVELOPMENT PROGRAMME (CDP)
B) In many ways cluster development has been practised since the earliest communities – from the medieval village. The first conscious application of a Cluster development was in Radburn, New Jersey in 1928. Currently cluster development is applied all over the India. From recent past there is particularly a strong push for it in West Bengal. Our State is gifted with a rich range of beautiful handicrafts. Almost every district of the state has its unique handicrafts. These Products are a part and parcel of the culture of the concerned communities. Passed on from generation to generation, these village industries have the potential of sustaining the artisans economically. Contribution of this sector to the national economy is immense. The Economical benefits of cluster development is that it requires less investments in infrastructure for growing up. Cluster initiatives are considered to be efficient policy instruments in that they allow a concentration of resources and funding in targeted areas with a high growth and development potential that can spread beyond the target locations.
What is Cluster
Geographical concentrations of inter-connected (Village Industries) enterprises and associated instructions that face common challenges and opportunities.
The definition highlights two essential features of Cluster:
1. They consist of a critical mass of enterprises located in geographical proximity to each other.
2.The enterprises within them share many common features.
What is Cluster Development
It is a key strategy for enhancing the Productivity and competitiveness as well as capacity building of inter-connected enterprises within a specific cluster.
Objectives of WBKVIB with a special reference to CDP
WBKVIB has undertaken 65 nos of cluster initiatives so far as per the direction of the State Govt. WBKVIB is working as a nodal agency and to ensure development, technology upgradation creation of CFC through PPP mode. Some of such initiatives are stated below. |
Marketing is one of the major activities of (he Board. The Board generally procures the products of the Certified Khadi Institutions/Societies financed by the Board as a part of Market support and sales out those goods to the customers through it's 10 (Ten) retail outlets(Showroom) situated at different important locations of Kolkata Metropolitan area as well as in some districts. Due to such trading activities of the Board poor, rural artisans, women, in particular, attached with the KVI activities are getting confirmed partial employment and side by side the propaganda of the KVI Products is also being done amongst the people. The Board is also undertaking ihe sale of Handmade Paper Products which is being produced at its production units in order to patronize a traditional collage industry of the country.
The Board undertakes the sale of KVI Products of other states too. The Board also provides Marketing support to its assisted units by way of offering them opportunities to participate in different District/State/National Level Exhibitions. The Board itself normally participates in the State as well as National Level Exhibition/Trade Fairs for promoting sales of its own and its assisted units.
Marketing department have been running the Outlet in the name of Gramin. wheres 7 (Seven) No Gramin is under P.P.P model. 2 (Two) No of Gramin running by the Board. 1 (One) No of Franchaise by the Sabang M/s Adhikary Brother.
FORMAT FOR DETAILS OF IMMOVABLE PROPERTIES OF INSTITUTIONS AS PER AUDITED BALANCE SHEET
ENHANCEMENT OF WAGES FOR SPINNING, WEAVING & OTHER ARTISANS.
DATE | SUBJECT OF ORDERS | ACTION |
04.01.2024 | STATEMENT OF VI PRODUCTS AVAILABLE IN KHADI GRAMIN (OUTLETS) | VIEW |
30.11.2023 | DISCOUNT AS ON FROM 01.01.2024 TO 31.03.2024 | VIEW |
20.11.2018 | SUBMISSION OF BANKING DETAILS AS PER PROFORMA | VIEW |
29.11.2018 | CALCULATION OF MMDA FOR ARTISANS | VIEW |
29.11.2018 | BUDGET GUIDELINES FOR KHADI & POLYVASTRA | VIEW |
29.11.2018 | THE LOOMS SUPPLIED UNDER TANTI SATHI/PROJECT MUSLIN | VIEW |
29.11.2018 | FORMAT FOR CONSTRUCTION OF WORK SHED OF MUSLIN WEAVERS as on 30.05.2018 | VIEW |
29.11.2018 | BRIEF GUIDELINES ON (MMDA) FOR KHADI INSTITUTIONS/SOCIETIES | VIEW |
6.12.2017 | REORGANIZATIONS OF 38 (THIRTY-EIGHT CLUSTERS) | VIEW |
29.11.2018 | WORK SHED SCHEME FOR MUSLIN WEAVERS UNDER 'PROJECT MUSLIN' | VIEW |
29.11.2018 | LIFE CERTIFICATE | VIEW |
29.11.2018 | BRIEF GUIDELINES FOR OPERATION OF "MUSLIN TIRTHA | VIEW |
29.11.2018 | INTERNAL AUDIT GUIDELINES FOR DISTRICT OFFICES | VIEW |
29.11.2018 | BUDGET FORMAT 2016-17 | VIEW |
13.02.2016 | BUDGET CIRCULAR 2016-17 | VIEW |
14.07.2015 | APPROVAL OF SCHEME NAMED "TANTISATHI" | VIEW |
29.11.2018 | FORMALITIES FOR REGISTRATION OF KHADI SOCIETIES | VIEW |
29.11.2018 | FORMAT FOR V. I. BUDGET OF ONGOING ACTIVITIES | VIEW |
29.11.2018 | FORMAT FOR STATEMENT SHOWING THE QUARTERLY PROGRESS REPORT OF 2014-15 UNDER KHADI AND POLYVASTRA PROGRAMME | VIEW |
29.11.2018 | FORMAT FOR DETAILS OF IMMOVABLE PROPERTIES OF INSTITUTIONS AS PER AUDITED BALANCE SHEET | VIEW |
31.03.2014 | FORM FOR CONFIRMATION OF KVIC FUNDS AS ON 31-03-2014 | VIEW |
29.11.2014 | FORMAT OF ISEC DEMAND | VIEW |
29.11.2014 | BUDGET FORMAT-2015-16 | VIEW |
28.04.2014 | ENHANCEMENT OF WAGES FOR SPINNING, WEAVING & OTHER ARTISANS | VIEW |
12.03.2014 | KVIC CIRCULAR ON EDP TRAINING DATED 12.03.2014 ON WITHDRAWAL OF EXEMPTION OF EDP TRAINING | VIEW |
31.03.2014 | EXEMPTION OF EDP TRAINING | VIEW |
26.03.2014 | MODEL CODE OF CONDUCT ON EXECUTION OF PMEGP I.C.W. PARLIAMENT ELECTION, 2014 | VIEW |
06.03.2014 | CHANGE OF THE NAME OF THE DEPARTMENT | VIEW |
06.01.2014 | KHADI MARK REGULATIONS 2013 | VIEW |
04.02.2014 | REGISTRATION OF KIS OR PERSONS UNDER KHADI MARK REGULATIONS, 2013 | VIEW |
23.12.2013 | POLICY FOR OPENING GODOWN | VIEW |
23.09.2013 | ACCREDITATION OF EDP CENTRES UNDER PMEGP | VIEW |
23.09.2013 | KHADI CERTIFICATION RULES | VIEW |
23.09.2013 | COST CHART OF KHADI & POLYVASTRA | VIEW |
22.11.2013 | GUIDELINES FOR BUDGET DISCUSSION WITH THE INSTITUTIONS AND DEPARTMENTAL UNITS FOR THE YEAR 2014-15 | VIEW |
22.11.2013 | REQUIREMENT OF FOLLOWING PAPERS/DOCUMENTS FOR BUDGET DISCUSSION FOR THE YEAR 2014-15 | VIEW |
22.11.2013 | MMDA CLAIM FORM | VIEW |
28.06.2018 | MMDA WORKSHOP BOOKLET | VIEW |
29.11.2018 | KHADI EXHIBITIONS-2018-19 | VIEW |
29.11.2018 | CERTIFICATION AND DIRECT LISTING OF NEW INSTITUTIONS | VIEW |
Notices & Tenders of the Board displayed on the Website are for general information only. The original copy of the Notices and tenders available in the Board should be consulted for authenticity.
DATE | SUBJECT OF ORDERS | ACTION |
22.11.2024 | Supplying Two nos Samsung or Similar make Brand Android Mobile phones in Head Quarter of WBKVIB, 12 no. B.B.D. Bag , Kol-01 | VIEW |
22.11.2024 | Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela Paschim Mednipur, Mednipur Burge Town Ground under West Bengal Khadi & Village Industries Board 2024-25 | VIEW |
18.11.2024 | Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela, Paschim Burdwan under West Bengal Khadi & Village Industries Board 2024-25 | VIEW |
18.11.2024 | Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela, Purulia, GEL Church Ground under West Bengal Khadi & Village Industries Board 2024-25 | VIEW |
06.11.2024 | Temporary Construction, Beautification, Installation of Sound and IT, Provide Security Guard and Temporary Construction of Toilet Block to Organizing State Level Khadi Mela under West Bengal Khadi& Village Industries Board 2024-25 | VIEW |
06.11.2024 | Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level KhadiMela, North 24 PGS under West Bengal Khadi& Village Industries Board 2024-25 | VIEW |
05.11.2024 | LIFE CERTIFICATE FORM | VIEW |
05.11.2024 | Online Notice Inviting Tender for Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist Bankura3rdCall. | VIEW |
05.11.2024 | Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur, Chhatna, Bankura 3rd Call | VIEW |
29.10.2024 | Supply and Installation of Tulaipanji Rice Packing Machine of (500gm -1Kg)in 12 B.B.D Bag Head Office under WBKVIB during the year 2024-25. | VIEW |
29.10.2024 | Day to Day Emergency Maintenance work of Plumbing, Civil & Electrical in Ground floor to Fourth floor (including Roof) of Hemanta Bhavan,12 B.B.D. Bag, Kol-1, Head Quarter of West Bengal Khadi & Village Industries Board during the year 2024-25 on basis of P.W.D. Govt. of West Bengal S.O.R-2017 and all agenda corrigendum. | VIEW |
28.10.2024 | Supply Laptop and Accessories in CEO Office Room under WBKVIB | VIEW |
25.10.2024 | Supply of V.I.P Executive Chair Godrej or similar make in Head Office(2nd Floor) of WBKVIB 12 B.B.D. Bag,Kolkata-700001. | VIEW |
22.10.2024 | Supply and Installation of New Tally Software With latest version & all necessary application tools for Marketing Section under WBKVIB. | VIEW |
26.09.2024 | Online NIT for Supply, Installation of Solar Charka, Tool Kit for Project, Training and Distribution of Solar Charka to the Khadi and Muslin Artisians in different Districts of West Bengal during the year 2024-25 under WBKVIB 2nd Call | VIEW |
26.09.2024 | Online Notice Inviting Quotation for Inviting Rate to Supply and Installation of different type of Fire Extinguisher (Cease Fire or Similar Make) at Center of Excellence Ashoknagar, North 24 Parganas, under WBKVIB during the year 2024-25 | VIEW |
24.09.2024 | Estimate for Fire and Safety of Readymade Garment Hub at Choupaharir Jangal, near Illambazar, Birbhum under WBKVIB | VIEW |
24.09.2024 | Estimate for Water Purifire of Readymade Garment Hub at Choupaharir Jangal, near Illambazar, Birbhum under WBKVIB. | VIEW |
04.09.2024 | Notice Inviting Quotation for Supply of office steel Almirah and android Phone in Head Office of WBKVIB, 12 B.B.D. Bag, Kolkata-700001. | VIEW |
03.09.2024 | Notice Inviting Quotation for Supply Desktop Computer & Accessories in CEO Office Room under WBKVIB | VIEW |
03.09.2024 | Notice Inviting Quotation for Supply Laptop and Accessories in Chairman Office Room under WBKVIB | VIEW |
02.09.2024 | Construction of Double Storied CPC Building for Honey Cluster Project at Patghara, Hingalganj, Dist.- North 24 Parganas under W.B.K.V.I.B. | VIEW |
02.09.2024 | Supply, Installation & Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIB | VIEW |
30.08.2024 | Notice Inviting Quotation for Emergency Supply and Installation of different size flex in Biswa Bangla Shopping festival at Science City & Bangla Tanter Hat at Karunamoyee under WBKVIB. | VIEW |
20.08.2024 | Notice Inviting Tender for Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist Bankura 2nd Call. | VIEW |
20.08.2024 | Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur, Chhatna, Bankura 2nd Call | VIEW |
20.08.2024 | Construction of Double Storied CPC Building for Areca Nut Processing Claster Project at Dist. Alipurduar under W.B.K.V.I.B 2nd Call | VIEW |
19.08.2024 | Supply, Installation of Solar Charka, Tool Kit for Project, Training and Distribution of Solar Charka to the Khadi and Muslin Artisians in different Districts of West Bengal during the year 2024-25 under WBKVIB | VIEW |
29.07.2024 | Installation of Glow Sign Board at Gramin Outlet Bolpur | VIEW |
26.07.2024 | Notice Inviting Quotation for Supply and Installation of Glow Sign Board(2 Nos.) in Kalyani HMP Centre, Nadia under WBKVIB | VIEW |
22.07.2024 | NOTICE INVITING QUOTATION FOR SUPPLY AND INSTALLATION OF TALLY SOFTWARE WITH LATEST VERSION & ALL NECESSARY APPLICATION TOOLS UNDER WBKVIB | VIEW |
21.07.2024 | Supplying of Bee Box in Bee Keeping Cluster ,Phase-II at Kurseong Block, Dist-Darjeeling during the Year 2024-25. | VIEW |
21.07.2024 | Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist- Bankura. | VIEW |
15.07.2024 | Supply, Installation and Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIB | VIEW |
12.07.2024 | Supply of Machine, Tools & Furniture in cluster of Binre Rice Straw Rope Making in Purba Burdwan District. | VIEW |
12.07.2024 | 1st Board Meeting Resolution 2024 | VIEW |
03.07.2024 | Supply and Installation of Stored Pressure Water Type Fire Extinguisher Capacity 2 Liter at Nalen Gur Production Building ,majdia,Nadia District. | VIEW |
03.07.2024 | Construction of Double Storied CPC Building for Areca Nut Processing Claster Project at Dist. Alipurduar under W.B.K.V.I.B | VIEW |
27.06.2024 | Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur,Chhatna,Bankura. | VIEW |
26.06.2024 | CONSTRUCTION OF DOUBLE STORIED CPC BUILDING FOR ARECA NUT PROCESSING CLASTER PROJECT AT BHAJANPUR, DIST. DARJEELING UNDER W.B.K.V.I.B. | VIEW |
25.06.2024 | Notice Inviting Quotation Beautification work in Gramin Outlet of WBKVIB at 12 B.B.D Bag, Kol- 700 001. | VIEW |
24.06.2024 | Notice Inviting Quotation for Supply and Installation of Glow Sign Board in CPC of Water Hyacinth Craft making in Purbasthali,Purba Burdwan | VIEW |
24.06.2024 | Notice Inviting Quotation for Supply of Miscellaneous articles in Head Office of WBKVIB (2nd Floor),12 B.B.D. Bag,Kolkata-700001. | VIEW |
24.06.2024 | Notice Inviting Quotation for Supply, fitting and fixing of 1 (One) No. of 2.0Ton Split Air Conditioner in Head Office(Khadi Section – 4Th Floor) under WBKVIB | VIEW |
24.06.2024 | Notice Inviting Quotation for Supply and Installation of Glow Sign Board in CPC of Binre by straw product in Purbasthali,Purba Burdwan (Size--8’0” X 4’.0”) | VIEW |
20.06.2024 | Additional Work of District Level Khadi Mela 2023-24 Burdwan District under WBKVIB (Phase-II) | VIEW |
19.06.2024 | Notice Inviting Online Tender for Remodelling and Renovation work of P.A.'s Chamber in 2nd floor of Hemanta Basu Bhavan at 12, B.B.D. Bag, Kolkata 700 001, Office of West Bengal Khadi & Village Industries Board (Civil & Electrical Work) during the year 2023-24 | VIEW |
19.06.2024 | Supply and Installation of Machineries for Dheki Processed Rice Making Project at Dalpur,Chhatna,Bankura | VIEW |
19.06.2024 | Notice Inviting Quotation for Transportation and Installation of Air Conditioner in Different District Office (Purulia, Purba Medinipur, Paschim Medinipur, Club Muslin) under WBKVIB. | VIEW |
18.06.2024 | Notice Inviting Tender for Construction of The Project Bee Keeping Cluster (may be read as Honey cluster) at DihiparaDist- Murshidabad Construction of Ground Floor Residential BuildingofDihipara Bee Keeping Cluster Industrial Cooperative Society LTD DihiparaDist- Murshidabad under WBKVIB 2nd Call | VIEW |
18.06.2024 | Online Notice Inviting Tender for Additional Renovation work of Gramin Outlet of Mayapur, Iskcon,Dist. Nadia under WBKVIB. Civil, Sanitary and Plumbing work during the Year 2023-242nd Call | VIEW |
14.06.2024 | Supply, Installation & Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIB | VIEW |
14.06.2024 | Construction of Three Storied CPC Building for District Office Purulia, Dist. Purulia Under W.B.K.V.I.B | VIEW |
14.06.2024 | Repair & Renovation of Production Unit, Construction of Double Storied Office Building and Other Allied Work of Dasghara H.M.P. Centre at Dighir | VIEW |
14.06.2024 | Additional Work of District Level Khadi Mela 2023-24 Howrah District under WBKVIB (Phase-II) | VIEW |
14.06.2024 | Additional Work of District Level Khadi Mela 2023-24 Howrah District under WBKVIB (Phase-I) | VIEW |
14.06.2024 | Additional Work of District Level Khadi Mela 2023-24 Burdwan District under WBKVIB (Phase-I) | VIEW |
13.06.2024 | Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Different District under WBKVIB. | VIEW |
13.06.2024 | Notice Inviting Quotation for Supply ,fitting and fixing of 1 (One) Nos. of 2.0Ton Split Air Conditioner in Club Muslin, Dakhinapan under WBKVIB. | VIEW |
12.06.2024 | Repair work at Canteen on 3rd floor of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001 | VIEW |
12.06.2024 | Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Purba Medinipur District under WBKVIB | VIEW |
12.06.2024 | Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Paschim Medinipur District under WBKVIB | VIEW |
12.06.2024 | Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Purulia District under WBKVIB | VIEW |
07.06.2024 | Supply and Installation of Telephone Intercom with additional accessories in different floor of Khadi Head Office Building of WBKVIB at 12 B.B.D Bag (Hemanta Bhawan) Phase - 2 | VIEW |
07.06.2024 | Supply and Installation of Telephone Intercom with additional accessories in different floor of Khadi Head Office Building of WBKVIB at 12 B.B.D Bag (Hemanta Bhawan) Phase - 1 | VIEW |
07.06.2024 | Anti-Termite Treatment of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001, during the year 2024-25 (Phase 2) | VIEW |
15.05.2024 | WALK-IN-INTERVIEW FOR ACCOUNT OFFICER CUM OFFICER IN CHARGE | VIEW |
16.04.2024 | WALK-IN-INTERVIEW FOR MARKETING OFFICER | VIEW |
02.04.2024 | WALK-IN-INTERVIEW FOR ASSISTANCE ENGINEER (CIVIL) | VIEW |
21.03.2024 | WALK-IN-INTERVIEW | VIEW |
14.03.2024 | Notice Inviting Online Quotation for Supply of Manpower (Existing) at various posts under WBKVIB (Head Office and All District Offices.) | VIEW |
07.03.2024 | Online Notice Inviting Quotation for Assignment for Assignment Regarding GST Audit on GST along with all official Formalities against monthly Transaction for the 2024-25 and 2025-26 in Respect of WBKVIB | VIEW |
07.03.2024 | Online Notice Inviting Quotation for Assignment for Preparation of Final Accounts for the F.Y. 2024-25 and 2025-26 in Respect of WBKVIB | VIEW |
06.03.2024 | Construction of Jaggery Processing Center with Boundary Wall and Ramp for Packing of Nolen Gur project at Majdia, Dist-Nadia, under WBKVIB. | VIEW |
22.02.2024 | Notice Inviting Tender for Construction of the Project Bee Keeping Cluster (may be read as Honey Cluster) at Dihipara Dist-Murshidabad Construction of Ground Floor Residential building of Dihipara bee Keeping Cluster industrial Co-operative Society LTD Dihipara Dist-Murshidabad under WBKVIB. | VIEW |
21.02.2024 | Notice inviting Online Quotation for Supplying Mini Truck Commercial and Light Commercial Vehicles LCV for carrying Khadi Textile goods in Kolkata and different districts of West Bengal based on as when required 4th Call. | VIEW |
17.02.2024 | RESOLUTION OF 3RD BOARD MEETING OF 2023-24 DATED, THE 17TH OF FEBRUARY, 2024 | VIEW |
07.02.2024 | District Level Khadi Mela 2023-24 Burdwan District | VIEW |
02.02.2024 | Notice Inviting Tender for Setup Furnace & Machineries of Pottery Cluster at Birnagar Block, Dist. Nadia under WBKVIB. | VIEW |
02.02.2024 | District Level Khadi Mela 2023-24 Howrah District from 08-03-2024 Tikia Para Station Adjacent Ground | VIEW |
01.02.2024 | Notice Inviting Quotation for supply and installation of Machinery, Associate Tools & Furniture, at CPC Building for Project on Water Hyacinth (Kachuripana) Craft Item Making at Purbasthali-I Block, Dist.- Purba Burdwan under WBKVIB- 2nd Call. | VIEW |
01.02.2024 | Notice Inviting Tender for Repair / Rectification of Machineries for Mango Processing Cluster at Malda, under WBKVIB - 3rd Call. | VIEW |
17.01.2024 | 1. STALL ALLOCATION for State Khadi Mela 2024- VI | VIEW |
17.01.2024 | 2. STALL ALLOCATION for State Khadi Mela 2024- KHADI | VIEW |
16.01.2024 | NIQ for Supply Desktop Computer & Accessories in Head Office P.A Section under WBKVIB. | VIEW |
03.01.2024 | Miscellanies Supply, Fitting, and Fixing of various items at the newly renovated Newtown Khadi Gramin Store, Shop No. 422,1B, B.D.Block Market, Action Area 1, Street no. 165, Newtown under WBKVIB. | VIEW |
21.12.2023 | NIQ for Supplying of Mini Truck Commercial and Light Commercial Vehicles LCV for carrying Khadi Textile goods 3rd Call | VIEW |
19.12.2023 | Repair and restoration work of Gramin Outlet of WBKVIB at 12, B.B.D. Bag, Kolkata 700 001. | VIEW |
17.12.2023 | RESOLUTION OF 2ND BOARD MEETING OF 2023-24 DATED, THE 18TH OF DECEMBER,2023 | VIEW |
15.12.2023 | Supply and Installation of Machinery, Associate Tools & Furniture, at CPC Building for Project on Water Hyacinth (Kachuripana) Craft item Making at Purbasthali-I Block, Dist. Purba Burdwan under WBKVIB. | VIEW |
15.12.2023 | NIQ for Miscellanies Income Tax Work in WBKVIB from 1st January 2024 to 31st March 2026. During the F.Y. 2023-24 | VIEW |
14.12.2023 | Repair/Rectification of Machineries for Mango Processing Cluster at Malda, under WBKVIB | VIEW |
12.12.2023 | Expression of Interest (EoIs) to consume the cotton yarns and fabrics in bulk volume from various production units of WBKVIB | VIEW |
11.12.2023 | PROJECT BALUCHURI WEAVING CLUSTER AT SONAMUKHI BLOCK, DIST BANKURA | VIEW |
07.12.2023 | Notice Inviting Quotation for Miscellanies Supply, fitting, and fixing of various items at CLUB MUSLIN Store, DAKHINAPAN MARKET, Dhakuria, Kolkata, West Bengal 700068 under WBKVIB. | VIEW |
06.12.2023 | Notice Inviting Quotation for Supply of 220 Lunch Packets for the Board meeting to be held on 18.12.2023 at WBKVIB Head Office, 12, B.B.D Bag, Kolkata - 700 001 | VIEW |
05.12.2023 | District Level Khadi Mela 2023-24 (Birbhum) | VIEW |
30.11.2023 | Expression of Interest for Internal Audit in W.B. Khadi & Village Industries Board, at 12 BBD Bag, Kolkata - 700001 | VIEW |
30.11.2023 | NOTICE INVITING ONLINE QUOTATION FOR SUPPLYING OF MINI TRUCK(COMMERCIAL) AND LIGHT COMMERCIAL VEHICLES (LCV) FOR CARRYING KHADI/TEXTILE GOODS IN KOLKATA AND DIFFERENT DISTRICTS OF WEST BENGAL ON THE BASIS OF AS WHEN REQUIRED. (2nd CALL) | VIEW |
29.11.2023 | State Level Khadi Mela 2023-24 | VIEW |
24.11.2023 | West Bengal Khadi & Village Industries Board Stall Distribution at Malda Mela | VIEW |
22.11.2023 | NIQ for Supply, fitting & fixing of 1.0 Ton Split AC, including all necessary electrification & installation at Howrah Gramin Store, Howrah Zila Parishad Complex under WBKVIB. | VIEW |
06.11.2023 | Online Quotation for Supplying of Mini Truck (Commercial) and Light Commercial Vehicles (LCV) for carrying Khadi / Textile goods in Kolkata and different districts of West Bengal based on as when required. | VIEW |
17.10.2023 | Readymade Garments Hub at Chou Pahari Jangle, near Illam bazar, Dist.-Birbhum under WBKVIB- Supply & Installation of Machinery. | VIEW |
13.10.2023 | Supply and Installation of Fire Extinguisher at WBKVIB Office at 12, B.B.D Bag, Kolkata- 700 001 (2nd Call) | VIEW |
12.10.2023 | Stall confirmation details District Level Khadi Mela – 2023-24, at Krishnanagar Public Library Ground, Krishnanagar, Nadia (V.I.) | VIEW |
12.10.2023 | Stall confirmation details District Level Khadi Mela – 2023-24, at Krishnanagar Public Library Ground, Krishnanagar, Nadia (Khadi) | VIEW |
11.10.2023 | Offline Notice inviting tender for Electrical Writing & Fitting Fixing for Double Storied CPC Building for Project on Water Hyacinth (Kachuripana) Craft item Making at Purbasthali-I Block, Dist-Purba Burdwan under WBKVIB. | VIEW |
09.10.2023 | Life Certificate | VIEW |
06.10.2023 | Anti-Termite Treatment of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001, during the year 2023-24 | VIEW |
05.10.2023 | Computer Peripherals Head Office | VIEW |
05.10.2023 | Computer Peripherals Different District | VIEW |
30.09.2023 | STALL ALLOCATION FOR DARJEELING KHADI MELA 2023-24 | VIEW |
29.09.2023 | District Level Khadi Mela 2023-24 from 30-10-23 to 10-11-23 at Krishnagar Public Library Ground, Krishnanagar, Nadia | VIEW |
18.09.2023 | Renovation of Khadi Gramin Store at Shop No. 422, 1B.B.D. Block Market, Action Area 1, Street no. 165, New Town under WBKVIB | VIEW |
14.09.2023 | Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum- Installation of Sound System and Lighting System Diesel Generator and other allied Work. | VIEW |
13.09.2023 | Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum - Temporary Construction for Audience Space and other allied work. | VIEW |
12.09.2023 | Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum - Temporary Construction of stage, Metal Structure, VIP Chair, and other allied work. | VIEW |
12.09.2023 | Notice Inviting Quotation for supply, fitting, and fixing of Glow sign Board and all necessary electrification and installation at CLUB MUSLIN. | VIEW |
12.09.2023 | Renovation work (Civil & Electrical) of room in 1st floor for proposed Bhabisyat Credit Card Wings of MSME&T Department in Head Office, 12, B.B.D Bag, Kolkata- 700 001. | VIEW |
07.09.2023 | Repair Rectification of Machineries for Mango Processing Cluster at Malda under WBKVIB as details are given below | VIEW |
07.09.2023 | Supply, fitting, and fixing of Glow sign Board of Size 8' x 1'6 including all necessary electrification and installation at Howrah Gramin Store, Howrah Zila Parishad Complex under WBKVIB. | VIEW |
07.09.2023 | Supply, fitting, and fixing of Glow sign Board of Size 6' x 2'6 including all necessary electrification and installation at Purba Burdwan under WBKVIB. | VIEW |
04.09.2023 | Binre Making From Straw at Choto Kobala, Bidya Nagar, Serampore, Purbasthali - I, Purba Burdwan under WBKVIB | VIEW |
29.08.2023 | Supply of Bee Hive Box and tool Kits for a project on Bee Keeping at Rani Bandh and Hir Bandh Block, Bankura under WBKVIB. | VIEW |
29.08.2023 | Supply and installation of Fire Extinguisher at WBKVIB Office. | VIEW |
25.08.2023 | The First Board Meeting | VIEW |
16.08.2023 | Day to Day Maintenance work for Sanitary & Plumbing work at 12, BBD Bag Kolkata- 700 001 | VIEW |
16.08.2023 | Day to Day Maintenance work for Electrical work at 12, BBD Bag Kolkata- 700 001 | VIEW |
16.08.2023 | Day To Day Maintenance work for Building Works at 12, BBD Bag Kolkata- 700 001 | VIEW |
03.08.2023 | CONSTRUCTION OF READYMADE GARMENTS HUB AT CHOUPAHARI JANGAL, NEAR ILLAMBAZAR, BIRBHUM UNDER WBKVIB | VIEW |
27.07.2023 | SUPPLY OF MISCELLANEOUS ITEMS FOR DASGHARA, HANDMADE PAPER CENTER, DASGHARA, HOOGHLY | VIEW |
27.07.2023 | EMERGENT REPAIR WORK IN CHAIRMAN TOILET AND SECRETARY CHAMBER, CORRIDOR UNDER WBKVIB DURING YEAR 2023-24 | VIEW |
18.07.2023 | CONSTRUCTION OF MOYA HUB INCLUDING BOUNDARY WALL, SANITARY PLUMBING, AND ELECTRICAL WORK AT JOYNAGAR, SOUTH 24 PGS UNDER WBKVIB IN THE YEAR 2023-24. | VIEW |
13.07.2023 | EMERGENT SHIFTING WORK FOR CLUB MUSLIN SHOWROOM (SHARING SHOP OF RESHAM SHILPA) AT DAKSHINAPAN MARKET COMPLEX UNDER WBKVIB DURING THE YEAR 2023-24 | VIEW |
05.07.2023 | NIQ FOR SOUND SYSTEM DURING MELA | VIEW |
05.07.2023 | NIQ FOR TEMPORARY ELECTRIFICATION OF,(STALL, THEME PAVILION, STAGE, INTERNAL DECORATION, VIP ROOM & PLATFORM, etc. | VIEW |
05.07.2023 | NIQ FOR TEMPORARY CONSTRUCTION OF,(STALL, THEME NIQ FOR TEMPORARY CONSTRUCTION OF,(STALL, THEME PAVILION, STAGE, INTERNAL DECORATION, VIP ROOM & PLATFORM etc | VIEW |
07.06.2023 | CONSTRUCTION OF MOYA HUB INCLUDING BOUNDARY WALL, SANITARY PLUMBING, AND ELECTRICAL WORK AT JOYNAGAR, SOUTH 24 PGS UNDER WBKVIB IN THE YEAR 2023-24 | VIEW |
07.06.2023 | EMERGENT SHIFTING WORK FOR CLUB MUSLIN SHOWROOM AT DAKSHINAPAN MARKET COMPLEX UNDER WBKVIB DURING THE YEAR 2023-24 | VIEW |
31.05.2023 | RENEWING M.S. STRUCTURE INCLUDING PRIMING, PAINTING, AND NECESSARY ELECTRICAL WORK INCLUDING EARTH BUSBAR CONNECTION FOR ACP GLOWSING BOARD ON ROOF AT HEAD OFFICE BUILDING UNDER WBKVIB. | VIEW |
19.05.2023 | RENOVATION OF KHADI GRAMIN STORE AT HOWRAH ZELA PARISHAD COMPLEX UNDER WBKVIB | VIEW |
15.05.2023 | IMPLEMENTATION OF THE PROJECT ON WATER HYACINTH(KACHURIPANA) CRAFT ITEM MAKING AT PURBASTHALI | VIEW |
15.05.2023 | ANNUAL MAINTENANCE OF AC MACHINES OFFICE OF THE WBKVIB IN DIFFERENT SECTIONS | VIEW |
06.04.2023 | SUPPLY & INSTALLATION OF ACP, LED GLOW SIGNBOARD IN HEADQUARTERS BUILDING | VIEW |
06.04.2023 | RENOVATION, REPAIR, AND OTHER WORK OF GRAMIN SHOWROOM AT PURBA BURDWAN | VIEW |
31.03.2023 | PUBLISHING OF TENDER NOTICE ON THE WEST BENGAL E-TENDER PORTAL WEBSITE | VIEW |
24.03.2023 | RESOLUTION OF THE MEETING OF THE INTERVIEW BOARD FOR ENGAGEMENT OF A RETIRED EXECUTIVE ENGINEER CIVIL AT THE HEADQUARTER OFFICE OF THE WBKVIB IN TERMS OF THE MOM OF THE 3rd BOARD MEETING OF 2022-23 | VIEW |
09.03.2023 | WALK-IN-INTERVIEW OF KHADI OFFICE | VIEW |
30.12.2022 | STATE LEVEL KHADI MELA 2023 | VIEW |
27.12.2022 | CORRIGENDUM DATE EXTENSION | VIEW |
15.12.2022 | RENOVATION & REPAIRING WORK OF EXISTING SET-UP MACHINERIES IN DASGHARA HMP CENTER DHANIAKHALI, HOOGHLY UNDER WBKVIB | VIEW |
20.12.2022 | PUBLISHING OF TENDER NOTICE ON THE DEPARTMENTAL WEBSITE | VIEW |
15.12.2022 | CONSTRUCTION OF TOILET BLOCK, PARTITION WALL SANITARY & PLUMBING WORK FOR CHAIRMAN ROOM ON 2ND FLOOR AT HEADOFFICE BUILDING UNDER WBKVIB | VIEW |
14.06.2022 | SUPPLY & INSTALLATION OF COMPUTER & PERIPHERALS | VIEW |
01.06.2022 | REPLACEMENT AND MAINTENANCE OF ALL EXISTING BRANDED FIRE EXTINGUISHERS AT THE HEAD OFFICE BUILDING | VIEW |
29.11.2021 | SELECTION OF THIRD-PARTY ORGANISATION FOR THE FINANCIAL YEAR 2021-22 FOR TESTING & QUALITY CHECKING OF PRODUCTS | VIEW |
02.09.2021 | DISTRIBUTORSHIP/DEALERSHIP OF TUBE-PACKED NALEN GUR | VIEW |
12.02.2021 | CONSTRUCTION OF TWO-STORIED RCC FRAMED BUILDINGS FOR RURAL CRAFT AND CULTURAL HUB OF GURUNG DEVELOPMENT BOARD AT POLOLEGAON | VIEW |
16.12.2020 | APPLICATION FORM FOR SANCTIONING FAMILY PENSION | VIEW |
16.12.2020 | APPLICATION FOR SANCTION OF PENSION | VIEW |
01.12.2020 | VISITOR WISH LIST FORM | VIEW |
01.12.2020 | MSME DIRECTORATE | VIEW |
01.12.2020 | FORM - FICCI ANNUAL EXPO 2020 | VIEW |
01.12.2020 | FICCI ANNUAL EXPO 2020 EXHIBITION BOOTH SPECIFICATION | VIEW |
01.12.2020 | FAE 2020 - BOOTH SPECIFICATION ADDITIONAL SERVICES | VIEW |
10.02.2020 | CONSTRUCTION OF SINGLE-STORIED CFC BUILDING FOR PROJECT WOMEN CLUSTER DEVELOPMENT AT KENJAKURA | VIEW |
17.02.2020 | CONSTRUCTION OF CFC BUILDING FOR PROJECT MULBERRY SILK AT SINDEBONG KHASMAHAL ON PLOT NO 2027 | VIEW |
20.01.2020 | ADDITIONAL CONSTRUCTION ADJACENT LAND DEVELOPMENT AND BOUNDARY WALL WORK OF PROJECT MEKHLA AT BOXIRHAT | VIEW |
05.12.2019 | DECORATION OF FAIRGROUND FOR STATE LEVEK KHADI FAIR AT TALTALA GROUND KOLKATA | VIEW |
18.11.2019 | ADDITIONAL WORK FOR CPC BUILDING OF PROJECT KANTHA STITCH AT BHEDIA PURBAPARA JANAKALYAN SWECHHASEVI SANGHA | VIEW |
01.10.2019 | ADDITIONAL GARDEN WITH DECORATION FOR CPC PROJECT AT SUSUNIA | VIEW |
27.09.2019 | ADDITIONAL HEIGHT OF BUILDING FOR CPC PROJECT AT SUSUNIA | VIEW |
26.09.2019 | LAND DEVELOPMENT AND DECORATION OF KITCHEN OR CPC PROJECT AT SUSUNIA | VIEW |
25.09.2019 | EXCESS WOODWORK AND ANCILLARY WORK FOR CPC PROJECT AT SUSUNIA | VIEW |
11.09.2019 | BOUNDARY WALL OF CPC UNDER PROJECT MUSLIN OF MAHILA SILK & COTTON KHADI TRUST AT SIMULIA | VIEW |
06.09.2019 | REPAIR OF COMMON TOILET BLOCK OF KHADI HEAD OFFICE | VIEW |
06.09.2019 | RENOVATION & DECORATION OF COMMON TOILET BLOCK 3RD FLOOR OF KHADI HEAD OFFICE | VIEW |
30.08.2019 | FRONT SHOW ACP DECORATION AND OTHER WORKS AT GRAMIN SHOWROOM AT BAGHAJATIN | VIEW |
30.08.2019 | ELECTRICAL WIRING AND FITTINGS INSTALLED AT GRAMIN SHOWROOM AT BAGHAJATIN ROAD KOLKATA | VIEW |
26.08.2019 | LAND DEVELOPMENT & ANCILLARY WORK FOR THE FOUNDATION AREA OF THE CFC BUILDING OF PALLY SILPA BIKASH KENDRA AT ISLAMPUR | VIEW |
26.08.2019 | ADDITIONAL WORK ON THE CFC BUILDING OF PALLY SILPA BIKASH KENDRA AT ISLAMPUR | VIEW |
19.08.2019 | CONSTRUCTION OF ROAD RENOVATION OF OLD BUILDING AND OTHER ANCILLARY WORK AT CENTER OF EXCELLENCE-KHADI ASHOKENAGAR | VIEW |
16.08.2019 | SHOWROOM WALL FURNITURE FOR THE SHOP ROOM OF GRAMIN SHOWROOM AT BAGHAJATIN STATION ROAD | VIEW |
05.08.2019 | RENOVATION & DECORATION OF COMMON TOILET BLOCK 2 ND FLOOR OF KHADI HEAD OFFICE | VIEW |
30.07.2019 | DRAWING ROOM AND STUDY ROOM FINISHING AND DECORATION WORK ON 2ND FLOOR OF MUSLIN TIRTHO AT MALDA | VIEW |
30.07.2019 | CONSTRUCTION OF ARTIFICIAL STONE FLOOR FINISH FOR KULIA TANTUBAYA MAHILA SAMITY AT BASAPARA | VIEW |
30.07.2019 | CONSTRUCTION OF FOUNDATION OF THE SHOWROOM AT KULIA TANTUBAYA MAHILA SAMITY AT BASAPARA | VIEW |
30.07.2019 | DECORATION OF OFFICE DO ROOM AT CPC OF PROJECT MUSLIN AT AILAKANDI | VIEW |
30.07.2019 | ADDITIONAL WORK FOR CONSTRUCTION OF CONCRETE ROOF AT 2 ND FLOOR DRAWING-ROOM AT MUSLIN TIRTHO MALDA | VIEW |
30.07.2019 | DRAWING ROOM AND STUDY ROOM FINISHING AND DECORATION WORK ON 2 ND FLOOR | VIEW |
29.07.2019 | CONSTRUCTION OF CPC BUILDING FOR PROJECT MEKHLA AT BOXIRHAT | VIEW |
22.07.2019 | CONSTRUCTION OF C.F.C BUILDING FOR DHEKI-CHATA CHAL AT CHATNA BLOCK | VIEW |
18.07.2019 | ADDITIONAL TIE BEAM AND BRICKWORK UP TO PLINTH LEVEL TIE BEAM AT SABONG | VIEW |
18.07.2019 | DRAINAGE AND SHED DYING UNIT AT COMMON SINK AREA AT CENTER OF EXCELLENCE SABAI & SAL LEAF PROJECT | VIEW |
18.07.2019 | LAND DEVELOPMENT BY FILLING OF SOIL AND SILVER SAND INCLUDING SATURATION WITH WATER AT SABONG | VIEW |
18.07.2019 | LAYING PAVER BLOCK FOR CPC OF PROJECT MUSLIN AT ALIAKANDI | VIEW |
18.07.2019 | LAYING ROOF TILES FOR CPC OF PROJECT MUSLIN | VIEW |
18.07.2019 | SHED AT BACKSIDE OF 2 ND BUILDING AT CENTER OF EXCELLENCE SABAI & LEAF | VIEW |
18.07.2019 | REPAIR OF COMMON TOILET BLOCK 1ST FLOOR OF KHADI HEAD OFFICE | VIEW |
18.07.2019 | REPAIR OF COMMON TOILET BLOCK 2 ND FLOOR OF KHADI HEAD OFFICE | VIEW |
16.07.2019 | INTERIOR DECORATION OF CFS SAL LEAF, EXHIBITION GALLERY, GUEST ROOMS, AND OFFICE BUILDING AT BANKURA | VIEW |
16.07.2019 | INTERIOR DECORATION OF OFFICE BUILDING AT COOCHBEHAR | VIEW |
12.07.2019 | ELECTRIFICATION OF COMMON TOILET BLOCK OF KHADI HEAD OFFICE | VIEW |
12.07.2019 | RENOVATION & DECORATION OF COMMON TOILET BLOCK OF KHADI HEAD OFFICE | VIEW |
05.07.2019 | CONSTRUCTION OF CPC GRAMIN KUTIRSHILPA GRAMODYOG KUTIR AT SIMULIA | VIEW |
28.06.2019 | CONSTRUCTION OF CPC OF GOUR GRAMIN SILK UNNAYAN SAMITY AT KALIACHAK | VIEW |
28.06.2019 | EXTENSION AND LAND DEVELOPMENT OF CPC UNDER PROJECT MUSLIN OF ADARSHA KHADI PRATISTHAN AT SIMULIA | VIEW |
28.06.2019 | SUPPLY OF SET OF MACHINERY FOR SETTING UP OF LARGE CARDAMOM PROCESSING CLUSTER AT KALIMPONG | VIEW |
28.06.2019 | SUPPLY OF SET OF TESTING EQUIPMENT AND MACHINERY FOR SETTING UP OF MOA HUB AT JOYNAGAR | VIEW |
27.06.2019 | CAR SHED AT BAHARAMPUR DISTRICT OFFICE EAST | VIEW |
23.05.2019 | LAYING PAVER BLOCK FOR CPC OF PROJECT MUSLIN AT BANKURA TOWN | VIEW |
23.05.2019 | LAYING ROOF TILES FOR CPC OF PROJECT MUSLIN AT BANKURA TOWN | VIEW |
13.05.2019 | SUPPLY OF VARIOUS ITEMS INCLUDING OF FITTING & FIXING IF NECESSARY OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIB | VIEW |
13.05.2019 | FURNITURE & FIXTURE OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIB | VIEW |
22.04.2019 | CAR SHED AT BAHARAMPUR DISTRICT OFFICE SOUTH | VIEW |
22.04.2019 | CAR SHED AT BAHARAMPUR DISTRICT OFFICE WEST | VIEW |
22.04.2019 | DEVELOPMENT OF LAND FOR CPC OF PROJECT MUSLIN AT AILAKANDI | VIEW |
28.03.2019 | SOLING WORK OF ADJACENT AREA FOR CPC BUILDING OF PROJECT MUSLIN AT ALIAKANDI | VIEW |
08.05.2019 | ELECTRICAL FITTING FIXING OF ALL-NEW FITTINGS OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIB | VIEW |
22.04.2019 | DECORATION WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIB | VIEW |
24.04.2019 | ADDITIONAL WORK FOR PLINTH PROTECTION & OTHER WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIB | VIEW |
22.04.2019 | ADDITIONAL WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIB | VIEW |
06.03.2019 | VITRIFIED TILES ON GROUND FLOOR, CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIB | VIEW |
27.02.2019 | INTERNAL DECORATION OF GUEST ROOM FOR CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIB | VIEW |
27.02.2019 | INTERNAL DECORATION FOR CPC OF PROJECT MUSLIN AT AILAKANDI, DIST. BANKURA UNDER WBKVIB | VIEW |
06.03.2019 | INCREASE OF PLINTH HEIGHT FOR CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIB | VIEW |
27.02.2019 | PLINTH PROTECTION FOR CPC AT SIMLAPAL, DIST. BANKURA UNDER WBKVIB | VIEW |
27.02.2019 | INCREASE OF PLINTH HEIGHT FOR CPC AT SIMLAPAL, DIST. BANKURA UNDER WBKVIB | VIEW |
01.03.2019 | ADDITIONAL WORK OF 1ST FLOOR SHOP AREA & ADJACENT WORKS OF CPC PROJECT AT SUSUNIA | VIEW |
27.02.2019 | BRICKWORK AND FLOORING FINISH AND OTHER ANCILLARY WORK FOR ENTIRE NEW CONSTRUCTION | VIEW |
25.01.2019 | CONSTRUCTION & DECORATION OF 3 NOS. MAIN BOUNDARY GATE UNDER PROJECT KHES AT LAVPUR | VIEW |
01.03.2019 | CONSTRUCTION OF C.P.C. OF COTTON KHADI BUILDING AT BARI | VIEW |
01.03.2019 | CONSTRUCTION OF CFC BUILDING FOR PROJECT SILK AT LAVPUR | VIEW |
01.03.2019 | CONSTRUCTION OF CPC BUILDING OF R.C.C.H PROJECT AT GOSABS | VIEW |
15.02.2019 | DEVELOPMENT OF LAND FOR CONSTRUCTION OF CPC UNDER PROJECT KHES AT LAVPUR | VIEW |
25.01.2019 | DEVELOPMENT OF LAND FOR CONSTRUCTION OF CPC UNDER PROJECT KHES | VIEW |
15.02.2019 | ELECTRICAL WIRING AND FITTING FIXING OF ALL NEW FITTING & FISCHER FOR THE CFC BUILDING WITH SUBMERSIBLE PUMP ETC | VIEW |
Act, Rules & Regulations of the Board displayed in the Website are for general information only. For authenticity, the original copy of the Act, Rules & Regulations available in the Board, should be consulted.
OUR OFFICES
Head Office: WEST BENGAL KHADI & VILLAGE INDUSTRIES BOARD
12, B.B.D Bag, Kolkata- 700 001
Sl. No. | District Offices | Sl. No. | District Offices |
1. | The District Officer (Birbhum) | 2. | The District Officer (Bankura) |
3. | The District Officer (Burdwan) | 4. | The District Officer (Uttar Dinajpur) West Bengal Khadi & Village Industries Board, Block-II, (1st floor), Raiganj Commercial Estate, Raiganj Super Market, P.O. Raiganj, District: Uttar Dinajpur. |
5. | The District Officer (Howrah) West Bengal Khadi & Village Industries Board, Shapur (Sibtala) W. Road, P.O. Dasnagar, District: Howrah. | 6. | The District Officer (Hooghly) West Bengal Khadi & Village Industries Board, Old Zilla Parishad Building, Ground Floor P.O. Chinsurah, District: Hooghly. |
7. | The District Officer (Purba Medinipur) West Bengal Khadi & Village Industries Board, Vill- Chaksrikrishnapur (Nimtouri High Road), P.O. Kulberiya, Tamluk District: Purba Medinipur, 721 101. | 8. | The District Officer (Paschim Medinipur) West Bengal Khadi & Village Industries Board, Zilla Parishad Complex, D.R.D.C. Building, 2nd Floor, P.O. & District: Paschim Medinipur. |
9. | The District Officer (Malda) West Bengal Khadi & Village Industries Board, C.C.P.C Building 77-A,/95, K.J. Sanyal Road, Atul Market, P.O. & District: Malda. | 10. | The District Officer (Murshidabad) West Bengal Khadi & Village Industries Board, 20, Barrack Square, P.O. Berhampore, District: Murshidabad. |
11. | The District Officer (North 24 Parganas) West Bengal Khadi & Village Industries Board, Rishi Bankim Sarani, Zilla Parishad Bhavan, P.O. Barasat, District: North 24 Parganas. | 12. | The District Officer (Dakshin Dinajpur) West Bengal Khadi & Village Industries Board, Zilla Parishad Complex, P.O. Balurghat, District: Dakshin Dinajpur. |
13. | The District Officer (Purulia) West Bengal Khadi & Village Industries Board, N.R.E.P Building, Zilla Parishad Complex, P.O. & District: Purulia. | 14. | The District Officer (Nadia) West Bengal Khadi & Village Industries Board, Nadia District Office, Muslin Tirtha Madhu Chowdhury Lane, P.O. Ghurni, Krishnanagar Dist- Nadia, 741 103 |
15. | The District Officer (South 24 Parganas) West Bengal Khadi & Village Industries Board, South 24 Parganas District Office, 2, Muzaffar Ahmed Street, Kolkata- 700 016. | 16. | The District Officer (Coochbehar) West Bengal Khadi & Village Industries Board, Nripendranarayan Road, Udichi Building, P.O. & District: Coochbehar. |
17. | The District Officer (Darjeeling) West Bengal Khadi & Village Industries Board, Netaji Subhash Road, Subhash Pally South, Ward No. 20 (Old C.P.W.D Office) P.O. Siliguri, District: Darjeeling. | 18. | The District Officer (Jalpaiguri)
|
RURAL CRAFT HUB
Handicrafts of Bengal embody our rich heritage of aesthetics, creativity and artistry. In today’s globalised world, the growing retail industry, fashion and luxury markets demand for green productions. Besides on the rises its high potential for employment, the craft sector is economically important from the point of low capital investment, high ratio of value addition, and high potential for export and foreign exchange earning for the country. WBKVIB thus aims to unleash the potential of the sector in terms of employment, enterprise, export and growth. WBKVIB is implementing the project with a vision to develop the villages with hundreds of families traditionally skillled in craft traditions like Sitalpati, Madhurkathi, Terracotta, Pathachitra, Dokra, Wooden Mask and Clay Doll making, Kantha as vibrant craft hubs connected to national and international markets.
OBJECTIVES OF RURAL CRAFT HUB
Sl. No. | NAME | YEAR OF PUBLISH |
1. | PROSPECT OF KHADI INDUSTRIES | 2008 |
2. | GUIDELINE OF PMEGP | 2009 |
3. | MDA MODALITIES | 2011 |
4. | BANGLAR MUSLIN | 2014 |
5. | HAND MADE PAPER INDUSTRY | 2014 |
6. | CREATIVITY BENGAL | 2015 |
7. | MUSLIN SUTA ‘O’ KAPORER RANJAN VIDYA (IN BENGALI) | 2015 |
8. | PROJECT MUSLIN | 2015 |
9. | KATUNIR JANYYA PROSIKHAN PUSTIKA – 2015 BAYAN SHILPI DER JANYYA PROSIKHAN PUSTIKA – 2015 | 2015 |
10. | HAND BOOK ON KHADI | 2016 |
11. | KHADI KARYAKRAM SAHAHIKA | 2016 |
12. | MADURKHATI BROCHURE | 2017 |
13. | MADURKATHI E CATALOGUE | 2017 |
14. | WBKVIB- TOWARDS A NEW HORIZON | 2018 |
15. | REVISED MMDA GUIDELINES | 2019 |
VILLAGE INDUSTRIES SCHEMES
Any Industry that is located within a rural area, where the Fixed Capital Investment per Artisan (weaver) does not exceed Rupees One hundred thousand The Fixed Capital Investment can be changed by the Central Government of India whenever it so requires. Another advantage of Village Industries is that they require little or no capital to set up, thereby making them an economically viable option for the rural poor. This is an important point with reference to India in view of its stark income, regional and rural/urban inequalities.
Scheme is a large-scale systematic plan or arrangement for attaining some particular object or putting a particular idea into effect. West Bengal Khadi & Village Industries Board implemented various scheme in order to employment generation. Under the Special Component Plan, the Board has implemented various schemes, like foot-wear making, cane and bamboo articles making, carpentry and black-smithy works to provide employment to the artisans:-
TRAINING & WORKSHOP
i).Organising EDP Training for implementation of PMEGP under Village Industries Programme. |
Boards Event management is the application of project management to the creation and development of large-scale events such as fashon show, participation in fair, etc. It involves studying the brand, identifying its target audience, devising the event concept, and coordinating the technical aspects before actually launching the event.
There are separate cell for the process of planning and coordinating the event is usually referred to as event planning and which can include budgeting, scheduling, site selection, acquiring necessary permits, coordinating transportation and parking, arranging for speakers or entertainers, arranging decor, event security, catering, coordinating with third party vendors, and emergency plans. Each event is different in its nature so process of planning & execution of each event differs on basis of type of event.
KVIB also promotes products made using the indigenous handspun fabric in the Global Market. The average Khadi Sales through departmental sales outlets(Gramin) also witnessed a marked increase. One of the policy decisions of WBKVIB is to allow Private Parties to sell Khadi products under the brand name GRAMIN under the PPP model for the same and for such it is to execute an agreement with WBKVIB & Private Party/ Khadi Institution/ any Govt. Organization. Such sales outlets are spread within the state of West Bengal. Such tie-ups would be beneficial to both organizations.
Sale of Khadi Products – At a glance
Sale of Khadi Products – At a glance | For 2016-17 Rs. | For 2017-18 Rs. | For 2018-19 Rs. |
| 3.60 70.00 80.00 90.00 75.00 58.00 40.00 20.00 263.00 106.00 | 2.00 200.00 100.00 102.00 280.00 80.00 62.00 22.00 296.00 250.00 | 3.40 291.00 314.76 207.00 76.00 70.00 151.84 14.00 495.00 725.00 |
PROCEDURE OF FORMATION
SPINNING
WEAVING
MDA/MMDA
The MDA (Marketing Development Assistance) scheme has been introduced in place of long existing Rebate scheme as an assistance to Artisans and Khadi Institutions.
Quantum
i) Artisans- 50% of settled amount.
ii) Institution- 50% of settled amount.
MDA is calculated on COST OF PROD. value but since 2017-18 a new scheme namely MMDA (Modified Marketing Development Assistance) has been introduced in place of MDA scheme on the strength of approval accorded by MSME&T Deptt. of W.B. vide memo no. 169/MSMET(v)/2k-09/15 dtd. 18.01.18.
MMDA is calculated on PRIME COST of Prod. value.
State Govt. share of MDA & MMDA are @ Rs. 10% & 15% respectively. All the Khadi producing Institutions having valid certificate are entitled to avail such benefit under this scheme.
THE MODIFIED MARKET DEVELOPMENT ASSISTANCE (MMDA) ON PRODUCTION SCHEME TO BE IMPLEMENTED WITH EFFECT FROM 01.04.2017 UNDER THE PURVIEW OF WEST BENGAL KHADI & VILLAGE INDUSTRIES BOARD.
BACKGROUND:
Khadi is handspun and hand woven cloth made by around a million traditional rural artisans. Handspun and hand woven characteristic is the Unique Selling Proposition of Khadi. Govt. of India has been providing MMDA @ 30% on the prime cost of production of Khadi in order to facilitate the product to compete with other textile product in the market.
Implementation of Modified Marketing Development Assistance (MMDA) scheme for Khadi & Polyvastra w.e.f 01/04/2017 in place of earlier MDA approved by MSSE & T Department, Govt. of West Bengal under the purview of WBKVIB.
MSSE & Department, Govt. of W.B with the concurrence of Finance (Audit) Department, Govt. of W.B has accorded approval for the introduction of Modified Market Development Assistance (MMDA) scheme with effect from 1-04-2017 in lieu of existing MDA by West Bengal Khadi & Village Industries Board in this State as per Govt. of India’s Circular No. DK/KC/Khadi/MPDA/Guidelines/16-17 dated. 26-12-2016 and guidelines laid down therwith issued by Directorate of Khadi Coordination, Khadi & Village Industries Commission subject to compliance of formalities laid down of the aforesaid Circular No. DKC/MDA-Policy/2010-11 dtd 16-04-10 of Govt. of India.
And the State Government accorded approval Vide No. 169-MSMET (V)/2K-09/15 dtd. 18-01-2018.
On the strength of the above noted order the WBKVIB has now decided to formulate and issue the brief Guidelines for giving immediate effect for introduction of Modified Market Development Assistance (MMDA) scheme on behalf of the MSME & T Department, Govt. of W.B w.e.f 01-04-2017.
The scheme has been effective from 1st April, 2017. The scheme will help Khadi Sector to reorient their activities extending adequate emphasis towards increasing artisans’ earnings as well as ensuring quality of Khadi to customers.
After introduction of MMDA from the end of KVIC, Govt. of India, the proposal for providing matching MMDA in the line of erstwhile MDA scheme to the certified Khadi Institutions/Societies in our state out of State Plan Resources and thereafter, the State Govt. has also decided to accept the proposal of the Board for Introduction of MMDA Scheme @ 15% on Prime Cost of production out of State Plan Resources.
The brief Guidelines in respect of above are now enunciate below for information and compliance for Certified Khadi Institutions/Societies, Offices of WBKVIB and KVIC in the State of West Bengal and others concerned.
Brief Guidelines for implementation of MMDA (State Govt. share)
1. The existing MDA scheme has been modified and termed as MMDA (Modified Marketing Development assistance). The newly scheme is effective from 2017-18 (01.04.2017).
2. The Modified MDA (State Govt. share) shall be calculated @ Rs. 15% on PRIME COST. The Prime Cost includes cost of raw material plus conversion changes up to grey cloth plus processing charges without margins (Establishment Expenditure, Trading, Insurance & Bank Interest)
3. All the Khadi Institutions/ Societies have to submit their claims in the form of MMDA instead of MDA as per existing proforma.
4. Under MMDA scheme the artisans engaged in the pre processing activities of Spinning & Weaving, Dyeing & Warping shall also be considered as the stakeholders along with Spinners, Weavers, Reelers and Turners.
5. The staff of Khadi Institutions involved in either in Production or Sale shall be considered as stakeholder of such MMDA.
6. Khadi Institutions/Societies undertaking production as well as sales activities shall be entitled for 50% of MMDA on Prime Cost and the remaining 50% shall be distributed among the spinners, weavers, reelers, turners and other respective artisans.
7. The Khadi Institutions/Societies should submit their claims of MMDA yearly to the respective District Offices of the Board.
8. Settlement of Claim:
All the claims as received will be examined and audited time to time by the entrusted officials of the Board and on the strength of desired recommendations from concerned District Officer the verified claim bills/reports shall be considered for payment subject to availability of fund from State Govt.
9. Furnishing of Utilization Certificate:
The Khadi institutions/societies availing MMDA will be bound to furnish utilization certificate within 1 month from the date of receipt of MMDA grant.
10. Utilization of MMDA for certain purpose, such as renovation, modernisation etc. may take a period more than one year. In such cases the Societies/Institutions will be allowed to spent MMDA portion up to 2 years.
The Khadi Institutions/Societies must submit their claims along with following documents:
1) Claim Bill in duplicate (as per proforma)
2) Copy of SFC approved target.
3) Copy of Certificate from the Registrar of society regarding Members of respective Managing Committee.
4) Copy of resolution regarding MMDA claim.
All the payments by the Khadi Institution/Societies out of MMDA must be through Aadhar linked bank (RTGS/NEFT) a/c to its stakeholders.
Components of MMDA:
COST OF RAW MATERIAL
+
SPINNING/REELING AND WEAVING CHARGES INCLUDING PROCESS WASTAGE, ARTISANS INCENTIVE AND ARTISANS WELFARE FUND ETC.
+
WET PROCESSING i.e BLEACHING, DYEING, MERCERIZING AND PRINTING CHARGES ALONG WITH PROCESS WASTE.
[PRIME COST]
Compliance of all the above points will be ensured by WBKVIB while settling the MMDA claim of each Institution/Society.
Definition of MMDA: MMDA on Production is an assistance proposed to be provided on Prime Cost of Khadi and polyvastra achieved by the certified Khadi institutions. The Khadi institutions, having valid Khadi certificate and categorized are only eligible to avail MMDA grant from WBKVIB/State Govt.
Rate Of MMDA: MMDA shall be allowed @ 15% ‘on Prime Cost (Cotton including Muslin Khadi, Silk, Woollen) and polyvastra to the extent of production target approved by the Standing Finance Committee (SFC) of KVIC for a particular Financial Year.
Producing Institution for the purpose of MMDA will mean the institution engaged in the activity of production of Khadi.
Selling Institution or sales outlets including departmentally run units of KVIC and KVIB for the purpose of MMDA will mean the institutions engaged in the activity of selling of Khadi purchased from producing institution.
Composite Institutions will mean the institutions engaged in the activity of producing and selling of Khadi.
Test Check/Test Audit and Monitoring of MMDA on Production:
1. WBKVIB shall conduct test audit/check of MMDA claims through its own officials in respect of all the institutions availing MMDA. The WBKVIB will reserve its right for such test audit/check and in case of any mis-utilization, it may order for complete audit of accounts of the Khadi institution. The MMDA claims will also be opened for ‘internal audit’ by the A.G., West Bengal.
2. As the funds for MMDA would be extended from Public fund, the Office of Auditor General of WB will have the right of conducting audit/test check or otherwise as decided by that office.
Dispute settlement in transfer of MMDA:
1. In case of non transfer or improper transfer of MMDA by the producing institutions to other stake holders especially the Artisans, the Stake Holders should bring such transactions immediately (Within one month of transaction) to the notice of the H.O through its District Office who will direct the producing Institutions to the eligible portion of MMDA forthwith. If any Khadi producing institution is not complying with the norms as laid down in the circular the CEO, WBKVIB will reserved the right to deduct the amount from the claim of the khadi producing institutions and remit the same to the Stake Holders i.e Artisans/Institutions as the case may be.
2. The Chief Executive Officer, WBKVIB shall be the appellate authority for all disputes and all Khadi Institutions will be bound by his decision.
MUSLIN TIRTHA
It is an integrated activity centre where all the facilities will be available to develop muslin), where research and development on Muslin will be continuing, have been established by the Board in the following District Viz-
Sl No. | Place where Muslin Tirtha situated | Construction cost | Activities |
1 | Krishnanagar, Nadia | 1.86 cr. | Training cum production of High count Muslin |
2 | Berhampur, Murshidabad | 1.35 cr. | Training cum production of High count Muslin |
3 | Malda | 2.04 cr. | Training cum production of low count Muslin |
4 | Suri, Birbhum | 1.27 cr. | Training cum production of low count Muslin |
Muslin Tirtha of West Bengal KHadi & V.I Board have established in four districts i. e Nadia, Murshidabad, Birbhum and Malda for organize of skill development training, production and services with help of khadi societies/institutions under project muslin scheme in respect of spinning, weaving, designing, dyeing, pre-processing activities etc, as well as marketing promotion of khadi products for livelihood development of the artisans attached with the khadi societies
Modalities of "Muslin Tirtha"
A) Raw Material Bank
i) To procure Roving from Central Sliver Plant, KVIC(Hajipur & Trichur or any such plant) and to supply Cotton roving for Spinning 10(T-20(r & 300" Metric Count of Muslin Yarn to various Khadi Societies,
ii) To procure Suvin Cotton / Sliver from bonafide agencies / plant and to supply Suvin Cotton / Sliver for Spinning 400S-500S Metric Count of Muslin Yarn to various Khadi Societies.
Mode of operation of Raw Material Bank
i) Khadi Societies have to place indent for Raw Material to District Officer along with the Demand Draft drawn in favour of "West Bengal Khadi & Village Industries Board". Rate of materials will be fixed up by H.Q.
ii) Raw Material will be issued by the District Officer to the Khadi Societies.
iii) Stock Register is to be maintained by D.O. and Stock position indicating available Stock and further requirement is to be submitted monthly to H.Q.
B) Training Centre for Spinning, Weaving & Dyeing & Printing of Muslin Yarn & Fabric
Training Centre on Spinning for Muslin Yarn At Muslin Tirtha, Nadia, training will be imparted for spinning on high count of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame) - 10 Nos. (For Spinning, of 400s- 500s Metric)
At Muslin Tirtha, Birbhum. Training will be imparted for spinning on medium & high count of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame) - 5 Nos. (For Spinning of 400s-5 00s Metric Count of Muslin Yarn)
ii) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 300s Metric Count of Muslin Yarn)
iii) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 200s Metric Count of Muslin Yarn)
iv) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 100s-150s Metric Count of Muslin Yarn)
Training Centre for Weaving & Designing at Nadia, Maida, Murshidabad & Birbhum
i) Frame Loom - 5 Nos.
ii) Jacquard Loom (100 & 200 hooks)- 1 Nos.
iii) Dobby Loom - 2 Nos.
Training Centre for scouring, bleaching, dyeing & finishing Muslin Yarn & Fabric at Nadia, Malda, Murshidabad & Birbhum
i) Raw Material, Dye, Chemical etc. will be arranged by D.O. of the concerned district officer after obtaining approval of Chief Executive Officer.
ii) Equipments for dyeing & scouring, bleaching & finishing will be installed by H.Q., in due time.
ii) No. of 8 Spindle Charkha (Metal Body) - 10 Nos. (For Spinning 300s Metric Count of Muslin Yarn)
At Muslin Tirtha, Murshidabad Training will be imparted for spinning on high count of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame)- 10 Nos. (For Spinning of 400s-500s Charkha of Muslin)
ii) No. of 8 Spindle Charkha (Metal Body) - 10 Nos. (For Spinning 300s Metric Count of Muslin Yarn)
At Muslin Tirtha, Malda Training will be imparted for spinning of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame) - 5 Nos. (For Spinning of 400s-500sMetric Count of Muslin Yarn)
ii) No. of 8 Spindle Charkha (Metal Body)-5 Nos. (For Spinning 300s Metric Count of Muslin Yarn)
iii) No. of 8 Spindle Charkha (Metal Body)-5 Nos. (For Spinning 200s Metric Count of Muslin Yarn)
iv) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 100s- 150s Metric Count of Muslin Yarn)
Board's officials from Head Quarter or from other Districts may stay in the Guest House during official tour without any cost but fooding have to arrange by the officials. Out side Guest may be allowed to stay in the Guest House by paying Rs. 1OO/-{ Rupees One Hundreed) only per day maximum 3 (three) days with prior approval of C.E.O. of the Board. District Officer has to maintain Log Book for the Guest House. No staff is allowed to stay in the Guest House permanently. Guest House should be cleaned & maintained properly. District Officer will take appropriate action regarding this. Fund collected to stay in the Guest House by the outsiders is to be remitted to Head Quarter in every Month. |
SOCIETIES , KHADI INSTITUTIONS
Khadi Institution
The Societies Registration Act, 1860, provides for facilities to form institutions for carrying on social and economic activities especially with a view to creating gainful employment for poor artisans through Khadi activities organized on no profit no loss basis. However, this Act does not permit formation of institutions to undertake commercial activities.
Structure of Institution
Registered institutions have their own decentralized units of production and each institution has a Chairman, Secretary, Treasurer and other executive members. So far as the institution is concerned, the Chairman of the institution is assisted by the Secretary, Treasurer, Accountant, Internal Auditors, Production Managers, Sales Managers and others. It would not be out of place to mention here that most of Institutional Seretaries hold on to the same post for years together without any retirement age limit and some times it is even here ditony.
Operational Area
Each institution has its own operational area which is demarcated by the Certification Committee of KVIC, Mumbai.
Function of Registered Khadi Institution
1. Extension of Khadi activity in the rural and remote areas.
2. To give financial and technical guidance to the individual artisans.
3. To supply the raw materials and marketing of the products of the artisans.
4. To supply the tools and equipment for the registered artisans.
5. To select the artisans for training/upgradation at the centres or outside the centre.
The registered institutions perform broad socio economic functions for the welfare of artisans, non-artisans and the people of the area concerned.
KVIC SOCITIES
KVIB SOCITIES
PROJECT MUSLIN
Background of Project Muslin :
Under British rule, the British East India company could not compete with local muslin with their own export of cloth to the Indian subcontinent.
Though Gandhiji believed Khadi can play a vital role in the economic growth of the nation the Bengali muslin industry was suppressed by various colonial policies. As a result, the quality of muslin suffered and the finesse of the cloth was lost.
There have been a few attempts at reviving the muslin industry even after independence. In the present day, many different types of muslins are produced in many different places.
It surfaced that those who were attached with Muslin compelled to shift to the other profession as they could not get benefits they were entitled to. Due to lack of storage and lack of proper marketing and it has become a seasonal occupation. They were in despair, the hands that could weave dreams, that could create beauty were becoming listeners. The Youth were either not learning or unlearning the teaching of their forefather. Some of them became agricultural workers, some of them started pulling rickshaw. The West Bengal Khadi & Village Industries Board has rightly seized of the opportunity and has given utmost importance to intervene in the following areas.
1. Skilling/Training : It is an important Policy Priority for Bengal Muslin.
2. Infrastructural Support.
3. Quality Control.
A revival package for superfine cotton-thread has been taken up under ‘PROJECT MUSLIN’ by the Department of Micro, Small and Medium Enterprises and Textiles, Government of West Bengal. Its primary objective is to revive the muslin industry and ensure that the artisans get remunerative returns and appreciation for their unique skills. WBKVIB was entrusted to implement the project.
It was indeed an honour for the WBKVIB made a MOU with Kolkata Craft Combine Society for soft intervention to the Muslin artisans.
1. Skilling/Training :
WBKVIB’s policy intervention have translated into concrete programmes of action which addressed four major skill challenges – scale, quality, employability and aspirations and several interventions have been introduced in both short term and long term.
Upskilling and reskilling a key component of the skill ecosystem.
WBKVIB had been imparting skill training across the state through Privet Partners.
Skilling is destined to become a great success in coming years and widen the opertunities for women in big way added to this is the need to diversify Products of Khadi Muslin.
Start ups showed that there were huge prospects ahead and little more encouragement and support from the KVIB would bring out the desired result.
Training Projects were allocated to those trainers who can train properly so that weavers can change themselves with the changing time. This is a perfect case study as to how all concerns can join hands.
Skilling had been receiving focused attention. Skilling helps to familiarize the artisan with latest technology and design and help to upgrade the product to the Global standard with better dyeing process and weaving techniques.
The artisans were mostly poor exposure to new technologies. Series of efforts had been taken to redress this problems and the sector is now witnessing good growth in terms of product developments.
Sl No.
|
NAME OF THE DISTRICT
| TRAINING ON | |||
---|---|---|---|---|---|
SPINNING | WEAVING & DESIGNING | DYING & PRINTING | PRE LOOM | ||
1 | MURSHIDABAD | 19 | 04 | 02 | 01 |
2 | MALDA | 12 | 0 | 0 | 0 |
3 | BURDWAN | 08 | 01 | 01 | 0 |
4 | BIRBHUM | 12 | 03 | 01 | 01 |
5 | NADIA | 08 | 02 | 02 | 0 |
6 | PASCHIM MEDINIPUR | 01 | 01 | 01 | 0 |
7 | BANKURA | 04 | 02 | 01 | 0 |
8 | HOWRAH | 04 | 04 | 0 | 02 |
9 | HOOGLY | 06 | 01 | 0 | 01 |
10 | 24TH PGS (N) | 01 | 0 | 0 | 0 |
TOTAL | 75 | 18 | 08 | 05 |
Training of high count Muslin (400s – 600s and above)
Matiary Kutir Shilpa Pratisthan at Nawadwip is the facilitating agency which runs the training center under WBKVIB for creating Muslin fabric of 500 count and plans to take up the challenge of producing fabric as fine as 600 counts. There are approximately 60 women that work in the
unit and they plan to extend it to more women of the area and make it a complete unit handled exclusively by women.
Training of Muslin(High count) at Matiary Kutir Shilpa Pratisthan,Nabadwip,Nadia
MODERNIZATION OF PRE-LOOM/WEAVING PREPARATORY SECTION FOR KHADI SECTOR
West Bengal Khadi & Village Industries Board had taken a project of “Pre-Loom/Weaving Preparatory Section” in the arena of Khadi Sector in association with Govt. College of Engineering & Textile Technology, Serampore.
1. Preparatory process is the backbone of weaving performance i.e. quality and production. In Khadi, the primitive process is laborious and time consuming. As a result the suitable process is to be developed for preparatory section of Khadi Industry is utmost essential.
2. The aim of this project is to enhance the quality of Khadi fabric and also to resolve the problem associated with Khadi Weavers and Khadi Weaver’s family by adoption of appropriate technology with the modification and mechanisation of Yarn preparation process which will reduce the work load and time of Weavers and thereby to resolve the social problem associated with the Khadi Weavers and Khadi Weaver’s family.
3. Hence, the aim of this project is to improve the Khadi preparatory process by (i) Method of wetting of yarn prior to sizing (ii) Modification of sizing paste preparation (iii) Elimination of step by modification of sizing recipe (iv) Improvement of knotting technique (v) Introducing of sectional warping over peg warping and (vi) Mechanised winding process.
AT A GLANCE (Outcome of the Project)
Sl. No. | Section | Previous | Now | Outcome |
1. | Yarn Wetting Process | Process time:4-5 days | Process time: less than 1 days | Loom waiting time reduces by minimum of 3 days |
2. | Sizing Paste Preparation | Rice Dust Paste | Latai making is Eliminated | New recipe for enhances the quality and productivity |
3. | Latai Making Process after Sizing | 1. Making of Latai (Cage Winding) from wet sized yarn 2.Drying of yarn in overlapped condition drying is time consuming | 1.Yarns are dried in more open form 2.Drying time is reduced 3.Drying can be done in house. | Elimination of tedious process reduces the loom waiting time |
Making of লাটাই from wet sized yarn causes entanglement. |
Use of rice based starch for sizing causes damage to yarn on storage |
Infrastructural Support
I. An infrastructure – Comprising Physical Infra, technology and innovation support. WBKVIB is on spree of revival of the glory MUSLIN KHADI, at the grass root level and in the past years 4633 nos. appropriate CHARKHAS and 4580 nos. advanced looms were supplied to the selected Muslin artisans who possess enough potential and possibilities. These units can be on the way to becoming the piller of growth. Availibilities of infrastructure means access to latest technology.
SL NO. | District | No. of Charkha | No. of loom supplied |
1. | Paschim Medinipur | 15 | 250 |
2. | Purulia | 52 | 86 |
3. | Nadia | 283 | 64 |
4. | Murshidabad | 1606 | 1282 |
5. | Malda | 1228 | 785 |
6. | Howrah | 244 | 168 |
7. | Purba Medinipur | 30 | 10 |
8. | Hooghly | 110 | 24 |
9. | Burdwan | 339 | 124 |
10. | Birbhum | 378 | 729 |
11. | Bankura | 70 | 769 |
12. | Darjeeling | 1 | 240 |
13. | 24 Parganas (N) | 183 | 38 |
14. | 24 Parganas (S) | 77 | 0 |
15. | Head Quarter | 2 | 0 |
16. | KCCS (Facilitator) | 15 | 11 |
TOTAL | 4633 | 4580 |
II.The possibilities and potential for job creation and weath formation are immence in the Khadi Sector and to provide gainful employment at the doorsteps of the rural un-employed, especially youth and women. Women’s emancipation and empowerment at the core of all development activities of WBKVIB. Within good infrastructural facilities the building of CPC is an important and so far 496 nos. CPC have been completed and 96 nos. will be completed soon for the place of working Muslin Artisans.
STATEMENT FOR WORKSHED SCHEME
SL NO | District | No of Proposal Received | No. of Proposal approved | No of Proposal Accepted | No. of Proposal under process | No. of Proposal rejected | No. of artisan deposited own contribution | Fund disbursed for no. of cases | Fund to be disbursed for no. of cases | Fund disbursed (Rs.) |
1. | HOOGHLY | 3 | 0 | 1 | 0 | 2 | 0 | 0 | 0 | 0 |
2. | NADIA | 3 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 |
3. | BIRBHUM | 256 | 172 | 0 | 0 | 84 | 167 | 86 | 81 | 9674265/- |
4. | MURSHIDABAD | 279 | 278 | 1 | 0 | 0 | 278 | 278 | 0 | 31272645/- |
5. | BANKURA | 24 | 23 | 0 | 0 | 1 | 12 | 12 | 11 | 1349897/- |
6. | PURULIA | 53 | 41 | 0 | 0 | 12 | 39 | 38 | 1 | 4274675/- |
7. | HOWRAH | 13 | 13 | 0 | 0 | 0 | 13 | 13 | 0 | 1462396/- |
8. | PURBA BURDWAN | 28 | 26 | 0 | 0 | 2 | 19 | 19 | 3 | 2087482/- |
TOTAL | 659 | 553 | 2 | 3 | 101 | 528 | 446 | 96 | 50121360/- |
It is an attempt to facilitate the development of Khadi spinners and weavers essentially belonging to BPL category by providing them financial assistance for construction of worksheds, on pilot basis.
Financial Assistance for construction of workshed will be provided to those Khadi Artisans who belong to BPL category through the Khadi institutions with which these khadi artisans are associated.
Quality Control :
Quality Control is a set of steps or guidelines designed to guarantee that a product (Khadi Fabric) meets certain performance standards and customer expectation. The above is generally measured by various production components or a set of steps or guidelines
|
The entire components and tested at Board’s in house testing laborotary by the experienced textile engineers before receiving any such fabrics which is in brief :
Raw materials of Muslin Khadi Fabric | A Khadi Institution (may be either the fold of KVIB or KVIC) Producing Muslin Khadi can only develop higher performance and sustainable profit ability if the quality standard are maintained (in sync) to the global standard. It also enhance competitiveness in Muslin Khadi Industry. The programme aims to develop global competitiveness among Bengal’s Muslin Khadi Producers by improving the process design techn ology and market access. It also aims at value – added cost effective solution. Muslin Khadi is already repositioning on the Khadi Map. |
Board has set up a physical testing of cotton yarn and fabrics, chemical testing of cotton fabrics testing laboratory and also for the standardization of the parameters which is an ultramodern lab manned by qualified personal to ensure maintenance of quality to meet the stringent standard. We may test both physical and chemical properties of the yarn and fabric. (ISO certificate obtained and furnished below).
KHADI ARTISIAN MAP
The West Bengal Khadi & Village Industries Board's Buyer-Seller Meet (BSM) is a tailor-made match-making platform where select national and international buyers, consisting of retailers, wholesalers and distributors, are introduced to prominent West Bengal's Khadi & Village industries manufacturers through one-on-one pre-scheduled meetings.