Articles View Hits
3408968

We have 60 guests and no members online

Here is where I will blog all about the parks of Australia.

You can make a blog on your website by creating a category to write your blog posts in (this one is called Park Blog). Each blog post will be an article in that category. If you make a category blog menu link with 1 column it will look like this page, if you display the category description then this part is displayed.

To enhance your blog you may want to add extensions for comments, interacting with social network sites, tagging, and keeping in contact with your readers. You can also enable the syndication that is included in Joomla (in the Integration Options set Show Feed Link to Show and make sure to display the syndication module on the page).

These are my photos from parks I have visited (I didn't take them, they are all from Wikimedia Commons).

This shows you how to make a simple image gallery using articles in com_content.

In each article put a thumbnail image before a "readmore" and the full size image after it. Set the article to Show Intro Text: Hide.

We search the whole countryside for the best fruit growers.

You can let each supplier have a page that he or she can edit. To see this in action you will need to create a user who is in the suppliers group.

Create one page in the growers category for that user and make that supplier the author of the page. That user will be able to edit his or her page.

This illustrates the use of the Edit Own permission.

BUDGET

The Khadi Commission formulates budget guidelines every year. Product based annual budget for the year 2018-19 was adopted by KVIC in its 647th meeting dated. 26.7.17. On the basis of such guidelines the Budgetary works have been done for the year 2018-19.

Khadi Institutions shall also identify the Khadi products which contribute maximum to their production & sales revenue.

Khadi Institutions increase their production by 10-20% annually without considering the demand potential in the market.


Allocation of target :-

The production target for various products has been fixed on prime cost of products. The annual target for all varieties like cotton, silk, wool & polyvastra will be the sum of the Prime Cost of all the products in each variety.

Budget Approval Process:-

The State Director shall form State Khadi Monitoring Committee (SKMC) for scrutinizing and recommending the Annual Action Plans Submitted by Khadi Institutions to the Zonal Committees at Zonal Level.The SKMC shall hold discussion with the Khadi Institutions only if it is necessary and in normalcourse the Khadi Institutions may not be called for any discussion.The SKMC will ensure that all the Khadi Institutions whose budgets are considered
should possess valid certificate & Khadi Mark.

 

Documents required to :-

1. Registration Certificate
be submitted 2. Up to date renewed Khadi Certificate.
3. Statement showing the position of E.M & H.D
4. No. of Artisans covered under JBY & the sum
Insured.
5. Detail of purchase.
6. Budget proposal in the prescribed format. (in
triplicate)
7. Resolution of Executive Committee regarding
submission of proposal for budget.
8. Audited Balance Sheet.
9. List of Artisans. (Spinners, Weavers, Reelers,
Turners etc.)
10. Infrastructure details.
11. Implements detail.
12. Annual Progress Report.
13. Confirmation of contribution towards AWFT
14. PAN Card
15. GST Registration detail.

In the year 2018’19 altogether 153 nos. proposal of Khadi Institutions under KVIB fold were accepted and got the valid Budgetary Production Target.

 

 

DIRECT PRODUCTION CENTER OF WBKVIB

 

KHADI CENTER OF EXCELENCE – THE PRIDE OF WBKVIB

WBKVIB’S vision is to create sustainable eco-system in the Khadi Sector which can maximize the utilization of resources and widen the area of operation to make the Board emerge as the KHADI leader in the Country in near future.

 

 

AT ASHOKNAGAR KVIB HAS DEVELOPED A KHADI CENTRE OF EXCELLENCE IN THE FORM OF KHADI PRODUCTION CUM SPINNING, WEAVING,              PRE-PROCESSING UNIT WITH RAW MATERIALS BANK AND A SALES OUTLET OF THE PRODUCT PRODUCED AT THE CENTRE WHERE EVERY ACCOUNTS, REPORTS ETC. WILL BE COMPUTERIZED.

Khadi Center of Excellence, Ashoknagar, North 24 Parganas.

 

 

 CENTRE OF EXCELLENCE MAY REFER TO A GROUP OF PEOPLE, A CENTRE OR A SHARED FACILITY OR AN ENTITY THAT PROVIDES RESEARCH AND TRAINING SUPPORT FOR DIVERSIFICATION OF THE PRODUCTION AT THE DESIRED LEVEL.

 

OBJECTIVES OF KHADI CENTRE OF EXCELLENCE

  • To enhance productivity.
  • To continue an uninterpted of production in the Khadi Sector.
  • To establish Raw Material Bank. (Sliver/Roving) which will be procured from KVIC’s Central Sliver Plant, Hazipur.
  • To supply the raw materials as per the requisition of Direct Khadi Production Unit.
  • To increases both capability & capacity.
  • To add the deeper knowledge required by the concerned unit.
  • To operates spare parts godown (Charkha & loom).
  • To produce Khadi fabric.
  • To establish dyeing unit.
  • To provide a readily available support system.
  • To keep all records through computer.
  • To import training through master trainee.
  • To sell the Product from it’s own Outlets.

 

Yarn Producing at the Khadi Center of Excellence, Ashoknagar, North 24 Parganas.

Exposer Visit Programme at the Khadi Center of Excellence, Ashoknagar, North 24 Parganas.

 

Skilling of artisans has been receiving focused attention. Skilling helps to familiarize the artisan with latest technology and design and helps upgrade the product up to the desired standard and to create an ICONIC Production Center within the West Bengal.

 

On 09.03.2011, Khadi and Rural Industries Awareness Camp was held at the Center of Excellence in Ashoknagar, West Bengal Khadi and  Gramin Industry Board. There was the presence of Shri Mrityunjaya Bandyopadhyay, Honorable Chief Executive Officer, Special Secretary of the West Bengal Government. There were also Shri Madhusudan Naskar, Honorable Secretary of West Bengal Khadi and the Gramin Industry Board.

 

FACILITIES AVAILABLE AT THE CoE :

  • Smart Campus with 24x7 security facility.
  • Empowerment of women.
  • Artisans are allowed to constantly innovate.
  • In house training & practical based learning facilities.
  • Focus on high count Spinning & Weaving.
  • Opportunity to showcase artisan’s talent.
  • Generating product which is superior to what it was producing earlier.

Measuring the success of CoE by –

  • The expertise show cased.
  • Shaping vision and technology road map
  • Fill the skill gap/market gap.

Success of CoE

  • Technology road map and fill the skill gap/market gap.
  • The expertise show cased.

Note: Refugee rehabilitation commissioner, 10 Camac Street Cal - 17 allotted a land – C.S Plot no. 291& 290 covering an area of more or less (4) four bighas of land in Habra-Sub-Scheme No. IV mouza Tababeria for utilizing the same for the purpose of setting up a Khadi Spinning Centre giving preference to local refugee and shall cater the need of the refugees vide memo no. B/767/RC Dt. 12.03.73.

 

GROWTH AND DEVELOPMENT: WOVEN IN THREAD OF KHADI CENTRE

The district Howrah possesses tremendous variety in all respect and is almost a miniature of India in terms of variation it contains.

In industrial map of West Bengal, Howrah holds a promotional position. During British period Howrah city was called “Glasgow” or “Sheffield” of India. The rapid urbanization of the district has widen the scope of ‘msme’.

But it is a matter of astonishment to note that this district till 2014 was a “NO KHADI” district.

Following the above, a comprehensive study was conducted by a team formed by the authority. And the team headed by the CEO of the Board for the possibilities of setting up of a Board’s direct production unit who gave a patient hearing to the people of some of the villages of the district Howrah.

In the block Udaynarayanpur at Pancharul G.P area some weavers and social workers showed their willingness for setting up a Khadi Production Unit. It was also revealed that there was a high possibilities of setting up of a khadi production centre. Near about 5000 weavers family are changed in the trade of hand loom sector through “Mahajan” system since a long time.

After submission of a proposal, the same was accepted and approved by the KVIB authority. And soon after that the Board authority has rightly seized of the opportunity and has given utmost importance to undertake the skilling programme under Khadi by the quality trainer of Jhargram. Moreover WBKVIB took necessary steps for capacity building of 40 spinners and 25 weavers at the initial stage according to the felt need. After that, production started at the premises of only 5 nos. weavers house through facilitating agency of  Udaynarayanpur Khadi O Gram Unnayan Sanstha, who acted also as the facilitator of the programme.

 

GEOGRAPHICAL LOCATION OF THE UNIT

Name of the site: Uttar Harishpur
Name of the G.P.: Pancharul
Name of the Block: Udaynarayanpur (Block lies between 22® 43’ 01” North latitude and between 87® 58’ 30” East latitude)
Population clensity: 2900/Sq. Km.
River: Damodar at North West
Boundary of the Block: North- Pursura Block (Hooghly)
South- Amta- I & II (Howrah)
East- Jangipara (Hooghly) 
West- Khanakul (Hooghly)
Distance of the unit:  43 Km. from Howrah city

 

Previous livelihood of the artisans were mainly agricultural work and some were shifted from handloom activities who were mostly working in an un-organized set up which made them prone to exploitation by MAHAJON or MIDDLEMAN.

Series of efforts had been taken by the KVIB Head Quarter to redress the problems and since after two consecutive years the unit was started witnessing good growth in terms of production, development, sales etc. Besides that the same unit have already been established at gaza village under Kurchi Shibpur G.P under same block areas.

The average performance of the unit till date is more than that of other direct production unit of the Board. It had also created an enabling environment of spinning & weaving activities under a single roof as to render better services in the right direction. Now this centre is competent enough in all respect and may be termed as integration competency centre. From record we can say that each stakeholder- the Board, the facilitator, the artisans has performed their role properly in making quality fabric product and almost defect less spinning.

It is also heartening to note that the authority of the Board has identified the unit as the “TOP DEFFECT FREE PRODUCT PRODUCER” which result less wastage during next stage of production.

Spinning Activities

Weaving Activities

 

Now, the centre is being promoted to a ‘KHADI COMPETENCY PRODUCTION UNIT, and restructed with the following-

A. i) Spinning Unit (40c yarn) = 80 nos.      
ii) Spinning Unit (70c yarn) = 40 nos.
iii) Spinning Unit (100c – 150c) = 50 nos.
B.Weaving unit with pre-loom activities
C.Dying Unit
D.Printing Unit
E.Selling Unit: Fabrics are being sold to Khadi Institution

Or,

  1. Fabrics are lifted by the Central Store, 12, B.B.D. Bag, Kol- 700 001 for selling of ready to use materials through Khadi Gramin Outlets of Board.

    • F. Facilitating agency was selected and engaged to run the production activities properly to elevate the production up to the desired level.

       

        

 Dyeing unit

At present there are 170 spinners and 80 weavers who were imparted the necessary development training and producing products as per the desired level.

 

“SAMRIDDHI” KHADI PRODUCTION CENTRE, UDAYNARAYANPUR, HOWRAH

  1.  

Production Planning and Control (PPC) therefore, is an effort to optimize the process of conversion of raw materials into finished fabrics required in the market. Since various activities are involved in the conversion of raw materials into finished goods, PPC is and has to be an integrated function the production unit has to derive maximum benefit out of planning. All the functions have inter-links; and the more such inter links are considered in the planning process, the better will be the planning process.

 

  

KHADI SCHEMES

Scheme is a large-scale systematic plan or arrangement for attaining some particular object or putting a particular idea into effect. West Bengal Khadi & Village Industries Board implemented various scheme in order to employment generation. 

 

CLUSTER DEVELOPMENT

 

CLUSTER DEVELOPMENT PROGRAMME (CDP)

B) In many ways cluster development has been practised since the earliest communities – from the medieval village. The first conscious application of a Cluster development was in Radburn, New Jersey in 1928. Currently cluster development is applied all over the India. From recent past there is particularly a strong push for it in West Bengal. Our State is gifted with a rich range of beautiful handicrafts. Almost every district of the state has its unique handicrafts. These Products are a part and parcel of the culture of the concerned communities. Passed on from generation to generation, these village industries have the potential of sustaining the artisans economically. Contribution of this sector to the national economy is immense. The Economical benefits of cluster development is that it requires less investments in infrastructure for growing up. Cluster initiatives are considered to be efficient policy instruments in that they allow a concentration of resources and funding in targeted areas with a high growth and development potential that can spread beyond the target locations.

 

What is Cluster

Geographical concentrations of inter-connected (Village Industries) enterprises and associated instructions that face common challenges and opportunities.

The definition highlights two essential features of Cluster:

      1. They consist of a critical mass of enterprises located in geographical proximity to each other. 

      2.The enterprises within them share many common features.

What is Cluster Development

It is a key strategy for enhancing the Productivity and competitiveness as well as capacity building of inter-connected enterprises within a specific cluster.

Objectives of WBKVIB with a special reference to CDP

  • To organize the traditional Industries and artisan into cluster.
  • To provide sustained employment for traditional village industries artisan.
  • To render skills and capabilities through training and exposure visit.
  • To make provision for common facilities and improved tools.
  • To promote the active participations of the stake holders.
  • To enhance marketability of products of such cluster.

WBKVIB has undertaken 65 nos of cluster initiatives so far as per the direction of the State Govt. WBKVIB is working as a nodal agency and to ensure development, technology upgradation creation of CFC through PPP mode. Some of such initiatives are stated below.

 

 

Marketing is one of the major activities of (he Board. The Board generally procures the products of the Certified Khadi Institutions/Societies financed by the Board as a part of Market support and sales out those goods to the customers through it's 10 (Ten) retail outlets(Showroom) situated at different important locations of Kolkata Metropolitan area as well as in some districts. Due to such trading activities of the Board poor, rural artisans, women, in particular, attached with the KVI activities are getting confirmed partial employment and side by side the propaganda of the KVI Products is also being done amongst the people. The Board is also undertaking ihe sale of Handmade Paper Products which is being produced at its production units in order to patronize a traditional collage industry of the country.
The Board undertakes the sale of KVI Products of other states too. The Board also provides Marketing support to its assisted units by way of offering them opportunities to participate in different District/State/National Level Exhibitions. The Board itself normally participates in the State as well as National Level Exhibition/Trade Fairs for promoting sales of its own and its assisted units.

Marketing department have been running the Outlet in the name of Gramin. wheres 7 (Seven) No Gramin is under P.P.P model. 2 (Two) No of Gramin running by the Board. 1 (One) No of Franchaise by the Sabang M/s Adhikary Brother.

FORMAT FOR DETAILS OF IMMOVABLE PROPERTIES OF INSTITUTIONS AS PER AUDITED BALANCE SHEET​

ENHANCEMENT OF WAGES FOR SPINNING, WEAVING & OTHER ARTISANS.​

DATESUBJECT OF ORDERSACTION
04.01.2024STATEMENT OF VI PRODUCTS AVAILABLE IN KHADI GRAMIN (OUTLETS)VIEW
30.11.2023DISCOUNT AS ON FROM 01.01.2024 TO 31.03.2024VIEW
20.11.2018SUBMISSION OF BANKING DETAILS AS PER PROFORMAVIEW
29.11.2018CALCULATION OF MMDA FOR ARTISANSVIEW
29.11.2018 BUDGET GUIDELINES FOR KHADI & POLYVASTRA VIEW 
29.11.2018 THE LOOMS SUPPLIED UNDER TANTI SATHI/PROJECT MUSLINVIEW
29.11.2018FORMAT FOR CONSTRUCTION OF WORK SHED OF MUSLIN WEAVERS as on 30.05.2018VIEW
29.11.2018BRIEF GUIDELINES ON (MMDA) FOR KHADI INSTITUTIONS/SOCIETIESVIEW
6.12.2017REORGANIZATIONS OF 38 (THIRTY-EIGHT CLUSTERS)VIEW
29.11.2018WORK SHED SCHEME FOR MUSLIN WEAVERS UNDER 'PROJECT MUSLIN'VIEW
29.11.2018LIFE CERTIFICATEVIEW
29.11.2018BRIEF GUIDELINES FOR OPERATION OF "MUSLIN TIRTHAVIEW
 29.11.2018INTERNAL AUDIT GUIDELINES FOR DISTRICT OFFICES VIEW 
 29.11.2018BUDGET FORMAT 2016-17 VIEW 
 13.02.2016BUDGET CIRCULAR 2016-17 VIEW  
 14.07.2015APPROVAL OF SCHEME NAMED "TANTISATHI" VIEW   
 29.11.2018FORMALITIES FOR REGISTRATION OF KHADI SOCIETIES VIEW
29.11.2018FORMAT FOR V. I. BUDGET OF ONGOING ACTIVITIESVIEW
 29.11.2018FORMAT FOR STATEMENT SHOWING THE QUARTERLY PROGRESS REPORT OF 2014-15 UNDER KHADI AND POLYVASTRA PROGRAMME VIEW 
29.11.2018 FORMAT FOR DETAILS OF IMMOVABLE PROPERTIES OF INSTITUTIONS AS PER AUDITED BALANCE SHEET VIEW 
31.03.2014FORM FOR CONFIRMATION OF KVIC FUNDS AS ON 31-03-2014VIEW 
29.11.2014FORMAT OF ISEC DEMANDVIEW 
 29.11.2014BUDGET FORMAT-2015-16 VIEW  
 28.04.2014ENHANCEMENT OF WAGES FOR SPINNING, WEAVING & OTHER ARTISANS VIEW   
 12.03.2014KVIC CIRCULAR ON EDP TRAINING DATED 12.03.2014 ON WITHDRAWAL OF EXEMPTION OF EDP TRAINING VIEW   
 31.03.2014EXEMPTION OF EDP TRAINING VIEW   
26.03.2014 MODEL CODE OF CONDUCT ON EXECUTION OF PMEGP I.C.W. PARLIAMENT ELECTION, 2014 VIEW
 06.03.2014CHANGE OF THE NAME OF THE DEPARTMENT VIEW 
06.01.2014KHADI MARK REGULATIONS 2013VIEW
04.02.2014REGISTRATION OF KIS OR PERSONS UNDER KHADI MARK REGULATIONS, 2013VIEW 
23.12.2013 POLICY FOR OPENING GODOWN VIEW 
23.09.2013ACCREDITATION OF EDP CENTRES UNDER PMEGPVIEW 
23.09.2013 KHADI CERTIFICATION RULES VIEW  
23.09.2013COST CHART OF KHADI & POLYVASTRAVIEW 
22.11.2013GUIDELINES FOR BUDGET DISCUSSION WITH THE INSTITUTIONS AND DEPARTMENTAL UNITS FOR THE YEAR 2014-15VIEW
 22.11.2013REQUIREMENT OF FOLLOWING PAPERS/DOCUMENTS FOR BUDGET DISCUSSION FOR THE YEAR 2014-15  VIEW
 22.11.2013MMDA CLAIM FORM  VIEW 
28.06.2018MMDA WORKSHOP BOOKLETVIEW 
29.11.2018KHADI EXHIBITIONS-2018-19VIEW
29.11.2018CERTIFICATION AND DIRECT LISTING OF NEW INSTITUTIONSVIEW

Notices & Tenders of the Board displayed on the Website are for general information only. The original copy of the Notices and tenders available in the Board should be consulted for authenticity.

 
DATESUBJECT OF ORDERSACTION
22.11.2024
Supplying Two nos Samsung or Similar make Brand Android Mobile phones in Head Quarter of WBKVIB, 12 no. B.B.D. Bag , Kol-01
VIEW
22.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela Paschim Mednipur, Mednipur Burge Town Ground under West Bengal Khadi & Village Industries Board 2024-25
VIEW
 18.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela, Paschim Burdwan under West Bengal Khadi & Village Industries Board 2024-25
VIEW
18.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level Khadi Mela, Purulia, GEL Church Ground under West Bengal Khadi & Village Industries Board 2024-25
VIEW
06.11.2024 
Temporary Construction, Beautification, Installation of Sound and IT, Provide Security Guard and Temporary Construction of Toilet Block to Organizing State Level Khadi Mela under West Bengal Khadi& Village Industries Board 2024-25
VIEW
06.11.2024
Temporary Construction, Beautification, Installation of Sound and IT and Provide Security Guard to Organising District Level KhadiMela, North 24 PGS under West Bengal Khadi& Village Industries Board 2024-25
VIEW
 05.11.2024LIFE CERTIFICATE FORMVIEW
05.11.2024Online Notice Inviting Tender for Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist Bankura3rdCall.VIEW
05.11.2024Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur, Chhatna, Bankura 3rd CallVIEW
29.10.2024Supply and Installation of Tulaipanji Rice Packing Machine of (500gm -1Kg)in 12 B.B.D Bag Head Office  under WBKVIB during the year 2024-25.VIEW
29.10.2024Day to Day Emergency Maintenance work of Plumbing, Civil & Electrical in Ground floor to Fourth floor (including Roof) of Hemanta Bhavan,12 B.B.D. Bag, Kol-1, Head Quarter of West Bengal Khadi & Village Industries Board during the year 2024-25 on basis of P.W.D. Govt. of West Bengal S.O.R-2017 and all agenda corrigendum.VIEW
28.10.2024Supply  Laptop and Accessories in CEO Office  Room  under WBKVIBVIEW
25.10.2024Supply of V.I.P Executive  Chair Godrej or similar make  in Head Office(2nd Floor) of WBKVIB  12 B.B.D. Bag,Kolkata-700001VIEW
22.10.2024Supply and Installation of New  Tally Software With latest version & all necessary application tools for Marketing Section under WBKVIB.VIEW
26.09.2024Online NIT for Supply, Installation of Solar Charka, Tool Kit for Project, Training and Distribution of Solar Charka to the Khadi and Muslin Artisians in different Districts of West Bengal during the year 2024-25 under WBKVIB 2nd CallVIEW
26.09.2024Online Notice Inviting Quotation for Inviting Rate to Supply and Installation of different type of Fire Extinguisher (Cease Fire or Similar Make) at Center of Excellence Ashoknagar, North 24 Parganas, under WBKVIB during the year 2024-25VIEW
24.09.2024Estimate for Fire and Safety of Readymade Garment Hub at Choupaharir Jangal, near Illambazar, Birbhum under WBKVIBVIEW
24.09.2024Estimate for Water Purifire of Readymade Garment Hub at Choupaharir Jangal, near Illambazar, Birbhum under WBKVIB.VIEW
04.09.2024Notice Inviting Quotation for Supply of office steel Almirah and android Phone in Head Office of WBKVIB, 12 B.B.D. Bag, Kolkata-700001.VIEW
03.09.2024Notice Inviting Quotation for Supply Desktop Computer & Accessories in CEO Office Room under WBKVIBVIEW
03.09.2024 Notice Inviting Quotation for Supply  Laptop and Accessories in Chairman Office  Room  under WBKVIBVIEW
02.09.2024Construction of Double Storied CPC Building for  Honey Cluster Project at Patghara, Hingalganj, Dist.- North 24 Parganas under W.B.K.V.I.B.VIEW
02.09.2024Supply, Installation & Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIBVIEW
30.08.2024Notice Inviting Quotation for Emergency  Supply and Installation of different size flex in Biswa Bangla Shopping festival at Science City  & Bangla Tanter Hat at Karunamoyee under WBKVIB.VIEW
20.08.2024Notice Inviting Tender for Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist Bankura 2nd Call.VIEW
20.08.2024 Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur, Chhatna, Bankura 2nd CallVIEW
20.08.2024Construction of Double Storied CPC Building for Areca Nut Processing Claster Project at Dist. Alipurduar under W.B.K.V.I.B 2nd CallVIEW
19.08.2024Supply, Installation of Solar Charka, Tool Kit for Project, Training and Distribution of Solar Charka to the Khadi and Muslin Artisians in different Districts of West Bengal during the year 2024-25 under WBKVIBVIEW
29.07.2024Installation of Glow Sign Board at Gramin Outlet Bolpur VIEW
26.07.2024Notice Inviting Quotation for Supply and Installation of Glow Sign Board(2 Nos.) in Kalyani HMP Centre, Nadia under WBKVIB VIEW
22.07.2024NOTICE INVITING QUOTATION FOR SUPPLY AND INSTALLATION OF TALLY SOFTWARE WITH LATEST VERSION & ALL NECESSARY APPLICATION TOOLS UNDER WBKVIBVIEW
21.07.2024Supplying of Bee Box in Bee Keeping Cluster ,Phase-II at Kurseong Block, Dist-Darjeeling during the Year 2024-25.VIEW
21.07.2024Supplying,Fitting and Fixing on Mustard Oil Extracting,Packaging and Storing at Ranibandh Block for Women of Backward Class under Ranibandh Mahila farmers Producer Company limited,Dist- Bankura.VIEW
15.07.2024Supply, Installation and Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIBVIEW
12.07.2024Supply of Machine, Tools & Furniture in cluster of Binre Rice Straw Rope Making in Purba Burdwan District.VIEW
12.07.20241st Board Meeting Resolution 2024VIEW
03.07.2024Supply and Installation of Stored Pressure Water Type Fire Extinguisher Capacity 2 Liter at Nalen Gur Production Building ,majdia,Nadia District.
VIEW
 03.07.2024Construction of Double Storied CPC Building for Areca Nut Processing Claster Project at Dist. Alipurduar under W.B.K.V.I.B VIEW
27.06.2024Supply & Installation of Machineries for Dheki Processed Rice Making Project at Dalpur,Chhatna,Bankura.VIEW
26.06.2024CONSTRUCTION OF DOUBLE STORIED CPC BUILDING FOR ARECA NUT PROCESSING CLASTER PROJECT AT BHAJANPUR, DIST. DARJEELING  UNDER W.B.K.V.I.B.VIEW
25.06.2024Notice Inviting Quotation Beautification work in Gramin Outlet of WBKVIB at 12 B.B.D Bag, Kol- 700 001.VIEW
24.06.2024Notice Inviting Quotation for Supply and Installation of Glow Sign Board in CPC of Water Hyacinth Craft making in Purbasthali,Purba BurdwanVIEW
24.06.2024 Notice Inviting Quotation for Supply of Miscellaneous articles in Head Office of WBKVIB (2nd Floor),12 B.B.D. Bag,Kolkata-700001. VIEW
24.06.2024Notice Inviting Quotation for Supply, fitting and fixing of 1 (One) No. of 2.0Ton Split Air Conditioner in Head Office(Khadi Section – 4Th Floor) under  WBKVIBVIEW
24.06.2024Notice Inviting Quotation for Supply and Installation of Glow Sign Board in CPC of  Binre by straw product in Purbasthali,Purba Burdwan (Size--8’0” X 4’.0”)VIEW
20.06.2024Additional Work of District Level Khadi Mela 2023-24 Burdwan District under WBKVIB (Phase-II)
VIEW
19.06.2024Notice Inviting Online Tender for Remodelling and Renovation work of P.A.'s Chamber in 2nd floor of Hemanta Basu Bhavan at 12, B.B.D. Bag, Kolkata 700 001, Office of West Bengal Khadi & Village Industries Board (Civil & Electrical Work) during the year 2023-24VIEW
 19.06.2024Supply and Installation of Machineries for Dheki Processed Rice Making Project at Dalpur,Chhatna,Bankura VIEW
19.06.2024Notice Inviting Quotation for Transportation and Installation of Air Conditioner in Different District Office (Purulia, Purba Medinipur, Paschim Medinipur, Club Muslin) under WBKVIB.VIEW
18.06.2024Notice Inviting Tender for Construction of The Project Bee Keeping Cluster (may be read as Honey cluster) at DihiparaDist- Murshidabad Construction of Ground Floor Residential BuildingofDihipara Bee Keeping Cluster Industrial Cooperative Society LTD DihiparaDist- Murshidabad under WBKVIB  2nd CallVIEW
18.06.2024Online Notice Inviting Tender for Additional Renovation work of Gramin Outlet of Mayapur,  Iskcon,Dist. Nadia under WBKVIB. Civil, Sanitary and Plumbing work during the Year 2023-242nd CallVIEW
14.06.2024 Supply, Installation & Maintenance of Roof Top Grid Connected Solar PV Power Plant at Different Places in West Bengal under WBKVIB VIEW
14.06.2024Construction of Three Storied CPC Building for District Office Purulia, Dist. Purulia Under W.B.K.V.I.BVIEW
14.06.2024  Repair & Renovation of Production Unit, Construction of Double Storied Office Building and Other Allied Work of Dasghara H.M.P. Centre at Dighir VIEW
14.06.2024

Additional Work of District Level Khadi Mela 2023-24 Howrah District under WBKVIB (Phase-II)

VIEW
14.06.2024

Additional Work of District Level Khadi Mela 2023-24 Howrah District under WBKVIB (Phase-I)

VIEW
14.06.2024

Additional Work of District Level Khadi Mela 2023-24 Burdwan District under WBKVIB (Phase-I)

VIEW
13.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Different District under WBKVIB.

VIEW
13.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 1 (One) Nos. of 2.0Ton Split Air Conditioner in Club Muslin, Dakhinapan under WBKVIB.

VIEW
12.06.2024

Repair work at Canteen on 3rd floor  of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001

VIEW
12.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Purba Medinipur District under WBKVIB

VIEW
12.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Paschim Medinipur District under WBKVIB

VIEW
12.06.2024

Notice Inviting Quotation for Supply ,fitting and fixing of 2 (Two) Nos. of 2.0Ton Split Air Conditioner in Purulia District under WBKVIB

VIEW
07.06.2024

Supply and Installation of Telephone Intercom with additional accessories in different floor of Khadi Head Office Building of WBKVIB at 12 B.B.D Bag (Hemanta Bhawan) Phase - 2  

VIEW
07.06.2024

Supply and Installation of Telephone Intercom with additional accessories in different floor of Khadi Head Office Building of WBKVIB at 12 B.B.D Bag (Hemanta Bhawan) Phase - 1

VIEW
07.06.2024

Anti-Termite Treatment of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001, during the year 2024-25 (Phase 2)

VIEW
15.05.2024

WALK-IN-INTERVIEW FOR ACCOUNT OFFICER CUM OFFICER IN CHARGE

VIEW
16.04.2024

WALK-IN-INTERVIEW FOR MARKETING OFFICER

VIEW
02.04.2024

WALK-IN-INTERVIEW FOR ASSISTANCE ENGINEER (CIVIL)

VIEW
21.03.2024

WALK-IN-INTERVIEW

VIEW
14.03.2024

Notice Inviting Online Quotation for Supply of Manpower (Existing) at various posts under WBKVIB (Head Office and All District Offices.)

VIEW 
07.03.2024Online Notice Inviting Quotation for Assignment for Assignment Regarding GST Audit on GST along with all official Formalities against monthly Transaction for the 2024-25 and 2025-26 in Respect of WBKVIBVIEW
07.03.2024Online Notice Inviting Quotation for Assignment for Preparation of Final Accounts for the F.Y. 2024-25 and 2025-26 in Respect of WBKVIBVIEW
06.03.2024Construction of Jaggery Processing Center with Boundary Wall and Ramp for Packing of Nolen Gur project at Majdia, Dist-Nadia, under WBKVIB. VIEW
22.02.2024 Notice Inviting Tender for Construction of the Project Bee Keeping Cluster (may be read as Honey Cluster) at Dihipara Dist-Murshidabad Construction of Ground Floor Residential building of Dihipara bee Keeping Cluster industrial Co-operative Society LTD Dihipara  Dist-Murshidabad under WBKVIB.VIEW

21.02.2024

Notice inviting Online Quotation for Supplying Mini Truck  Commercial and Light Commercial Vehicles LCV for carrying Khadi Textile goods in Kolkata and different districts of West Bengal based on as when required 4th Call.VIEW

17.02.2024

RESOLUTION OF 3RD BOARD MEETING OF 2023-24 DATED, THE 17TH OF FEBRUARY, 2024VIEW

07.02.2024

District Level Khadi Mela 2023-24 Burdwan DistrictVIEW
02.02.2024 Notice Inviting Tender for Setup Furnace & Machineries of Pottery Cluster at Birnagar Block, Dist. Nadia under WBKVIB.VIEW
02.02.2024District Level Khadi Mela 2023-24 Howrah District from 08-03-2024 Tikia Para Station Adjacent GroundVIEW
01.02.2024Notice Inviting Quotation for supply and installation of Machinery, Associate Tools & Furniture, at CPC Building for Project on Water Hyacinth (Kachuripana) Craft Item Making at Purbasthali-I Block, Dist.- Purba Burdwan under WBKVIB- 2nd Call.VIEW
01.02.2024Notice Inviting Tender for Repair / Rectification of Machineries for Mango Processing Cluster at Malda, under WBKVIB - 3rd Call.VIEW
17.01.20241. STALL ALLOCATION for State Khadi Mela 2024- VI  VIEW
17.01.20242. STALL ALLOCATION for State Khadi Mela 2024- KHADI  VIEW
 16.01.2024NIQ for Supply Desktop Computer & Accessories in Head Office P.A Section under WBKVIB.VIEW
03.01.2024Miscellanies Supply, Fitting, and  Fixing of various items at the newly renovated Newtown Khadi Gramin Store, Shop No. 422,1B, B.D.Block Market, Action Area 1, Street no. 165, Newtown under WBKVIB.VIEW
21.12.2023NIQ for Supplying of Mini Truck  Commercial and Light Commercial Vehicles LCV for carrying Khadi  Textile goods 3rd CallVIEW
19.12.2023Repair and restoration work of Gramin Outlet of WBKVIB at 12, B.B.D. Bag, Kolkata 700 001.VIEW
17.12.2023RESOLUTION OF 2ND BOARD MEETING OF 2023-24 DATED, THE 18TH OF DECEMBER,2023VIEW
15.12.2023Supply and Installation of Machinery, Associate Tools & Furniture, at CPC Building for Project on Water Hyacinth (Kachuripana) Craft item Making at Purbasthali-I Block, Dist. Purba Burdwan under WBKVIB.VIEW
15.12.2023 NIQ for Miscellanies Income Tax Work in WBKVIB from 1st January 2024 to 31st March 2026. During the F.Y. 2023-24VIEW
14.12.2023 Repair/Rectification of Machineries for Mango Processing Cluster at Malda, under WBKVIBVIEW
12.12.2023

Expression of Interest (EoIs) to consume the cotton yarns and fabrics in bulk volume from various production units of WBKVIB

VIEW
11.12.2023PROJECT BALUCHURI WEAVING CLUSTER AT SONAMUKHI BLOCK, DIST BANKURAVIEW
07.12.2023Notice Inviting Quotation for Miscellanies Supply, fitting, and fixing of various items at CLUB MUSLIN Store, DAKHINAPAN MARKET, Dhakuria, Kolkata, West Bengal 700068 under WBKVIB.VIEW
06.12.2023Notice Inviting Quotation for Supply of 220 Lunch Packets for the Board meeting to be held on 18.12.2023 at WBKVIB Head Office, 12, B.B.D Bag, Kolkata - 700 001VIEW
05.12.2023District Level Khadi Mela 2023-24 (Birbhum)VIEW
30.11.2023Expression of Interest for Internal Audit in W.B. Khadi & Village Industries Board, at 12 BBD Bag, Kolkata - 700001VIEW
30.11.2023NOTICE INVITING ONLINE QUOTATION FOR SUPPLYING OF MINI TRUCK(COMMERCIAL) AND LIGHT COMMERCIAL VEHICLES (LCV) FOR CARRYING KHADI/TEXTILE GOODS IN KOLKATA AND DIFFERENT DISTRICTS OF WEST BENGAL ON THE BASIS OF AS WHEN REQUIRED. (2nd CALL)VIEW
29.11.2023State Level Khadi Mela 2023-24VIEW
24.11.2023West Bengal Khadi & Village Industries Board Stall Distribution at Malda MelaVIEW
22.11.2023NIQ for Supply, fitting & fixing of 1.0 Ton Split AC, including all necessary electrification & installation at Howrah Gramin Store, Howrah Zila Parishad Complex under WBKVIB.VIEW
06.11.2023Online Quotation for Supplying of Mini Truck (Commercial) and Light Commercial Vehicles (LCV) for carrying Khadi / Textile goods in Kolkata and different districts of West Bengal based on as when required.VIEW
17.10.2023Readymade Garments Hub at Chou Pahari Jangle, near Illam bazar, Dist.-Birbhum under WBKVIB- Supply & Installation of Machinery.VIEW
13.10.2023Supply and Installation of Fire Extinguisher at WBKVIB Office at 12, B.B.D Bag, Kolkata- 700 001 (2nd Call)VIEW
12.10.2023Stall confirmation details District Level Khadi Mela – 2023-24, at Krishnanagar Public Library Ground,
Krishnanagar, Nadia (V.I.)
VIEW
12.10.2023
Stall confirmation details District Level Khadi Mela – 2023-24, at Krishnanagar Public Library Ground,
Krishnanagar, Nadia (Khadi)
VIEW
11.10.2023
Offline Notice inviting tender for Electrical Writing & Fitting Fixing for Double Storied CPC Building for Project on Water Hyacinth  (Kachuripana) Craft item Making at Purbasthali-I Block, Dist-Purba Burdwan under WBKVIB.
VIEW
09.10.2023
Life Certificate
VIEW
06.10.2023Anti-Termite Treatment of Khadi Head Office Building at 12, BBD Bag, Kolkata 700 001, during the year 2023-24  VIEW
05.10.2023
Computer Peripherals Head Office
VIEW
05.10.2023
Computer Peripherals Different District 
VIEW
30.09.2023
STALL ALLOCATION FOR DARJEELING KHADI MELA 2023-24
VIEW
29.09.2023
District Level Khadi Mela 2023-24 from 30-10-23 to 10-11-23 at Krishnagar Public Library Ground, Krishnanagar, Nadia
VIEW
18.09.2023
Renovation of Khadi Gramin Store at Shop No. 422, 1B.B.D. Block Market, Action Area 1, Street no. 165, New Town under WBKVIB
VIEW
14.09.2023
Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum- Installation of Sound System and Lighting System Diesel Generator and other allied Work. 
VIEW
13.09.2023Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum - Temporary Construction for Audience Space and other allied work.VIEW
12.09.2023Emergent Decoration Work for Shilanyas Ceremony Program for Construction of Readymade Garments Hub at Illambazar Birbhum - Temporary Construction of stage, Metal Structure, VIP Chair, and other allied work.VIEW
12.09.2023Notice Inviting Quotation for supply, fitting, and fixing of Glow sign Board and all necessary electrification and installation at CLUB MUSLIN.VIEW
12.09.2023Renovation work (Civil & Electrical) of room in 1st floor for proposed Bhabisyat Credit Card Wings of MSME&T Department in Head Office, 12, B.B.D Bag, Kolkata- 700 001.VIEW
07.09.2023Repair Rectification of Machineries for Mango Processing Cluster at Malda under WBKVIB as details are given belowVIEW
07.09.2023Supply, fitting, and fixing of Glow sign Board of Size 8' x 1'6 including all necessary electrification and installation at Howrah Gramin Store, Howrah Zila Parishad Complex under WBKVIB.VIEW
07.09.2023Supply, fitting, and fixing of Glow sign Board of Size 6' x 2'6 including all necessary electrification and installation at Purba Burdwan under WBKVIB.VIEW
04.09.2023Binre Making From Straw at Choto Kobala, Bidya Nagar, Serampore, Purbasthali - I, Purba Burdwan under WBKVIBVIEW
29.08.2023Supply of Bee Hive Box and tool Kits for a project on Bee Keeping at Rani Bandh and Hir Bandh Block, Bankura under WBKVIB.VIEW
29.08.2023Supply and installation of Fire Extinguisher at WBKVIB Office.VIEW
25.08.2023The First Board MeetingVIEW
16.08.2023Day to Day Maintenance work for Sanitary & Plumbing work at 12, BBD Bag Kolkata- 700 001VIEW
16.08.2023Day to Day Maintenance work for Electrical work at 12, BBD Bag Kolkata- 700 001VIEW
16.08.2023

Day To Day Maintenance work for Building Works at 12, BBD Bag Kolkata- 700 001

VIEW
03.08.2023

CONSTRUCTION OF READYMADE GARMENTS HUB AT CHOUPAHARI JANGAL, NEAR ILLAMBAZAR, BIRBHUM UNDER WBKVIB

VIEW
27.07.2023

SUPPLY OF MISCELLANEOUS ITEMS FOR DASGHARA, HANDMADE PAPER CENTER, DASGHARA, HOOGHLY 

VIEW
27.07.2023

EMERGENT REPAIR WORK IN CHAIRMAN TOILET AND SECRETARY CHAMBER, CORRIDOR UNDER WBKVIB DURING YEAR 2023-24

VIEW
18.07.2023

CONSTRUCTION OF MOYA HUB INCLUDING BOUNDARY WALL, SANITARY PLUMBING, AND ELECTRICAL WORK AT JOYNAGAR, SOUTH 24 PGS UNDER WBKVIB IN THE YEAR 2023-24.

VIEW
13.07.2023

EMERGENT SHIFTING WORK FOR CLUB MUSLIN SHOWROOM (SHARING SHOP OF RESHAM SHILPA) AT DAKSHINAPAN MARKET COMPLEX UNDER WBKVIB DURING THE YEAR 2023-24

VIEW
05.07.2023

NIQ FOR SOUND SYSTEM DURING MELA 

VIEW
05.07.2023

NIQ FOR TEMPORARY ELECTRIFICATION OF,(STALL, THEME PAVILION, STAGE, INTERNAL DECORATION, VIP ROOM &  PLATFORM, etc.

VIEW
05.07.2023

NIQ FOR TEMPORARY CONSTRUCTION OF,(STALL, THEME NIQ FOR TEMPORARY CONSTRUCTION OF,(STALL, THEME PAVILION, STAGE, INTERNAL DECORATION, VIP ROOM & PLATFORM etc

VIEW
07.06.2023 

CONSTRUCTION OF MOYA HUB INCLUDING BOUNDARY WALL, SANITARY PLUMBING, AND ELECTRICAL WORK AT JOYNAGAR, SOUTH 24 PGS UNDER WBKVIB IN THE YEAR 2023-24

VIEW 

07.06.2023

EMERGENT SHIFTING WORK FOR CLUB MUSLIN SHOWROOM AT DAKSHINAPAN MARKET COMPLEX UNDER WBKVIB DURING THE YEAR 2023-24

VIEW

31.05.2023

RENEWING M.S. STRUCTURE INCLUDING PRIMING, PAINTING, AND NECESSARY ELECTRICAL WORK INCLUDING EARTH BUSBAR CONNECTION FOR ACP GLOWSING BOARD ON ROOF AT HEAD OFFICE BUILDING UNDER WBKVIB.

VIEW
19.05.2023

RENOVATION OF KHADI GRAMIN STORE AT HOWRAH ZELA PARISHAD COMPLEX UNDER WBKVIB

VIEW
15.05.2023

IMPLEMENTATION OF THE PROJECT ON WATER HYACINTH(KACHURIPANA) CRAFT ITEM MAKING AT PURBASTHALI

VIEW
15.05.2023

ANNUAL MAINTENANCE OF AC MACHINES OFFICE OF THE WBKVIB IN DIFFERENT SECTIONS

VIEW
06.04.2023 

SUPPLY & INSTALLATION OF ACP, LED GLOW SIGNBOARD IN HEADQUARTERS BUILDING

VIEW 
06.04.2023 

RENOVATION, REPAIR, AND OTHER WORK OF GRAMIN SHOWROOM AT PURBA BURDWAN

VIEW 
31.03.2023 

PUBLISHING OF TENDER NOTICE ON THE WEST BENGAL E-TENDER PORTAL WEBSITE

VIEW
24.03.2023

RESOLUTION OF THE MEETING OF THE INTERVIEW BOARD FOR ENGAGEMENT OF A RETIRED EXECUTIVE ENGINEER CIVIL AT THE HEADQUARTER OFFICE OF THE WBKVIB IN TERMS OF THE MOM OF THE 3rd BOARD MEETING OF 2022-23

VIEW
09.03.2023

WALK-IN-INTERVIEW OF KHADI OFFICE

VIEW
30.12.2022

STATE LEVEL KHADI MELA 2023

VIEW
27.12.2022

CORRIGENDUM  DATE  EXTENSION

VIEW 
15.12.2022 

RENOVATION & REPAIRING WORK OF EXISTING SET-UP MACHINERIES IN DASGHARA HMP CENTER DHANIAKHALI, HOOGHLY UNDER WBKVIB

VIEW 
20.12.2022PUBLISHING OF TENDER NOTICE ON THE DEPARTMENTAL WEBSITEVIEW
15.12.2022CONSTRUCTION OF TOILET BLOCK, PARTITION WALL SANITARY & PLUMBING WORK FOR CHAIRMAN ROOM ON 2ND FLOOR AT HEADOFFICE BUILDING UNDER WBKVIBVIEW
14.06.2022SUPPLY & INSTALLATION OF COMPUTER & PERIPHERALSVIEW
01.06.2022REPLACEMENT AND MAINTENANCE OF ALL EXISTING BRANDED FIRE EXTINGUISHERS AT THE HEAD OFFICE BUILDINGVIEW
29.11.2021SELECTION OF THIRD-PARTY ORGANISATION FOR THE FINANCIAL YEAR 2021-22 FOR TESTING & QUALITY CHECKING OF PRODUCTSVIEW
02.09.2021DISTRIBUTORSHIP/DEALERSHIP OF TUBE-PACKED NALEN GURVIEW
12.02.2021CONSTRUCTION OF TWO-STORIED RCC FRAMED BUILDINGS FOR RURAL CRAFT AND CULTURAL HUB OF GURUNG DEVELOPMENT BOARD AT POLOLEGAON VIEW
16.12.2020APPLICATION FORM FOR SANCTIONING FAMILY PENSIONVIEW
16.12.2020APPLICATION FOR SANCTION OF  PENSIONVIEW
 01.12.2020VISITOR WISH LIST FORM VIEW
01.12.2020MSME DIRECTORATEVIEW
01.12.2020FORM - FICCI ANNUAL EXPO 2020 VIEW
01.12.2020FICCI ANNUAL EXPO 2020 EXHIBITION BOOTH SPECIFICATIONVIEW
01.12.2020FAE 2020 - BOOTH SPECIFICATION ADDITIONAL SERVICESVIEW
10.02.2020CONSTRUCTION OF SINGLE-STORIED CFC BUILDING FOR PROJECT WOMEN CLUSTER DEVELOPMENT AT KENJAKURAVIEW
17.02.2020 CONSTRUCTION OF CFC BUILDING FOR PROJECT MULBERRY SILK AT SINDEBONG KHASMAHAL ON PLOT NO 2027 VIEW 
 20.01.2020ADDITIONAL CONSTRUCTION ADJACENT LAND DEVELOPMENT AND BOUNDARY WALL WORK OF PROJECT MEKHLA AT BOXIRHAT  VIEW  
05.12.2019 DECORATION OF FAIRGROUND FOR STATE LEVEK KHADI FAIR AT TALTALA GROUND KOLKATA   VIEW   
18.11.2019ADDITIONAL WORK FOR CPC BUILDING OF PROJECT KANTHA STITCH AT BHEDIA PURBAPARA JANAKALYAN SWECHHASEVI SANGHA VIEW 
01.10.2019ADDITIONAL GARDEN WITH DECORATION FOR CPC PROJECT AT SUSUNIA   VIEW  
27.09.2019ADDITIONAL HEIGHT OF BUILDING FOR CPC PROJECT AT SUSUNIA   VIEW 
26.09.2019 LAND DEVELOPMENT AND DECORATION OF KITCHEN OR CPC PROJECT AT SUSUNIA  VIEW  
 25.09.2019EXCESS WOODWORK AND ANCILLARY WORK FOR CPC PROJECT AT SUSUNIA VIEW  
11.09.2019BOUNDARY WALL OF CPC UNDER PROJECT MUSLIN OF MAHILA SILK & COTTON KHADI TRUST AT SIMULIA  VIEW  
06.09.2019 REPAIR OF COMMON TOILET BLOCK OF KHADI HEAD OFFICEVIEW 
06.09.2019RENOVATION & DECORATION OF COMMON TOILET BLOCK 3RD FLOOR OF KHADI HEAD OFFICE VIEW
30.08.2019FRONT SHOW ACP DECORATION AND OTHER WORKS AT GRAMIN SHOWROOM AT BAGHAJATIN VIEW
30.08.2019 ELECTRICAL WIRING AND FITTINGS INSTALLED AT GRAMIN SHOWROOM AT BAGHAJATIN ROAD KOLKATAVIEW
26.08.2019LAND DEVELOPMENT & ANCILLARY WORK FOR THE FOUNDATION AREA OF THE CFC BUILDING OF PALLY SILPA BIKASH KENDRA AT ISLAMPUR VIEW 
26.08.2019ADDITIONAL WORK ON THE CFC BUILDING OF PALLY SILPA BIKASH KENDRA AT ISLAMPUR VIEW 
19.08.2019CONSTRUCTION OF ROAD RENOVATION OF OLD BUILDING AND OTHER ANCILLARY WORK AT CENTER OF EXCELLENCE-KHADI ASHOKENAGARVIEW
 16.08.2019SHOWROOM WALL FURNITURE FOR THE SHOP ROOM OF GRAMIN SHOWROOM AT BAGHAJATIN STATION ROAD  VIEW 
05.08.2019RENOVATION & DECORATION OF COMMON TOILET BLOCK 2 ND FLOOR OF KHADI HEAD OFFICE VIEW 
30.07.2019 DRAWING ROOM AND STUDY ROOM FINISHING AND DECORATION WORK ON 2ND FLOOR OF MUSLIN TIRTHO AT MALDA   VIEW  
30.07.2019 CONSTRUCTION OF ARTIFICIAL STONE FLOOR FINISH FOR KULIA TANTUBAYA MAHILA SAMITY AT BASAPARA VIEW 
30.07.2019 CONSTRUCTION OF FOUNDATION OF THE SHOWROOM AT KULIA TANTUBAYA MAHILA SAMITY AT BASAPARAVIEW 
 30.07.2019DECORATION OF OFFICE DO ROOM AT CPC OF PROJECT MUSLIN AT AILAKANDI   VIEW  
30.07.2019ADDITIONAL WORK FOR CONSTRUCTION OF CONCRETE ROOF AT 2 ND FLOOR DRAWING-ROOM AT MUSLIN TIRTHO MALDA  VIEW  
30.07.2019DRAWING ROOM AND STUDY ROOM FINISHING AND DECORATION WORK ON 2 ND FLOOR VIEW 

29.07.2019

CONSTRUCTION OF CPC BUILDING FOR PROJECT MEKHLA AT BOXIRHATVIEW

22.07.2019

CONSTRUCTION OF C.F.C BUILDING FOR DHEKI-CHATA CHAL AT CHATNA BLOCKVIEW 
 18.07.2019ADDITIONAL TIE BEAM AND BRICKWORK UP TO PLINTH LEVEL TIE BEAM AT SABONG VIEW  
18.07.2019 DRAINAGE AND SHED DYING UNIT AT COMMON SINK AREA AT CENTER OF EXCELLENCE SABAI & SAL LEAF PROJECT VIEW  
18.07.2019LAND DEVELOPMENT BY FILLING OF SOIL AND SILVER SAND INCLUDING SATURATION WITH WATER AT SABONG VIEW  
18.07.2019 LAYING PAVER BLOCK FOR CPC OF PROJECT MUSLIN AT ALIAKANDI VIEW  
 18.07.2019 LAYING ROOF TILES FOR CPC OF PROJECT MUSLINVIEW  
18.07.2019 

SHED AT BACKSIDE OF 2 ND BUILDING AT CENTER OF EXCELLENCE SABAI & LEAF 

VIEW   
18.07.2019

REPAIR OF COMMON TOILET BLOCK 1ST FLOOR OF KHADI HEAD OFFICE 

VIEW  
18.07.2019

REPAIR OF COMMON TOILET BLOCK 2 ND FLOOR OF KHADI HEAD OFFICE 

VIEW  
16.07.2019 

INTERIOR DECORATION OF CFS SAL LEAF, EXHIBITION GALLERY, GUEST ROOMS, AND OFFICE BUILDING AT BANKURA 

 VIEW    
16.07.2019 INTERIOR DECORATION OF OFFICE BUILDING AT COOCHBEHARVIEW   
12.07.2019  ELECTRIFICATION OF COMMON TOILET BLOCK OF KHADI HEAD OFFICEVIEW   
12.07.2019RENOVATION & DECORATION OF COMMON TOILET BLOCK OF KHADI HEAD OFFICE  VIEW   
05.07.2019 CONSTRUCTION OF CPC GRAMIN KUTIRSHILPA GRAMODYOG KUTIR AT SIMULIA
VIEW 
28.06.2019 CONSTRUCTION OF CPC OF GOUR GRAMIN SILK UNNAYAN SAMITY AT KALIACHAKVIEW 
28.06.2019EXTENSION AND LAND DEVELOPMENT OF CPC UNDER PROJECT MUSLIN OF ADARSHA KHADI PRATISTHAN AT SIMULIAVIEW  
28.06.2019SUPPLY OF SET OF MACHINERY FOR SETTING UP OF LARGE CARDAMOM PROCESSING CLUSTER AT KALIMPONG VIEW  
28.06.2019 SUPPLY OF SET OF TESTING EQUIPMENT AND MACHINERY FOR SETTING UP OF MOA HUB AT JOYNAGARVIEW  
27.06.2019  CAR SHED AT BAHARAMPUR DISTRICT OFFICE EASTVIEW   
23.05.2019 LAYING PAVER BLOCK FOR CPC OF PROJECT MUSLIN AT BANKURA TOWNVIEW  
23.05.2019 LAYING ROOF TILES FOR CPC OF PROJECT MUSLIN AT BANKURA TOWNVIEW 
13.05.2019SUPPLY OF VARIOUS ITEMS INCLUDING OF FITTING & FIXING IF NECESSARY OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIBVIEW
13.05.2019FURNITURE & FIXTURE OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIBVIEW
 22.04.2019CAR SHED AT BAHARAMPUR DISTRICT OFFICE SOUTH  VIEW    
22.04.2019CAR SHED AT BAHARAMPUR DISTRICT OFFICE WESTVIEW   
22.04.2019 DEVELOPMENT OF LAND FOR CPC OF PROJECT MUSLIN AT AILAKANDI VIEW   

28.03.2019 

 SOLING WORK OF ADJACENT AREA FOR CPC BUILDING OF PROJECT MUSLIN AT ALIAKANDIVIEW   
08.05.2019 ELECTRICAL FITTING FIXING OF ALL-NEW FITTINGS OF RCCH PROJECT BUILDING OF HARIHARPARA BAUL AT HARIHARPARA, DIST-MURSHIDABAD (WB) UNDER WBKVIBVIEW 
22.04.2019 DECORATION WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIBVIEW 

24.04.2019

ADDITIONAL WORK FOR PLINTH PROTECTION & OTHER WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIBVIEW

22.04.2019

ADDITIONAL WORK FOR CONSTRUCTION OF RCCH BUILDING AT HARIHARPARA, DIST-MURSHIDABAD UNDER WBKVIBVIEW
06.03.2019 VITRIFIED TILES ON GROUND FLOOR, CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIBVIEW 
27.02.2019  INTERNAL DECORATION OF GUEST ROOM FOR CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIBVIEW 
27.02.2019INTERNAL DECORATION FOR CPC OF PROJECT MUSLIN AT AILAKANDI, DIST. BANKURA UNDER WBKVIBVIEW
06.03.2019INCREASE OF PLINTH HEIGHT FOR CPC OF PROJECT MUSLIN AT AILAKANDI (BANKURA TOWN), DIST. BANKURA UNDER WBKVIBVIEW
27.02.2019PLINTH PROTECTION FOR CPC AT SIMLAPAL, DIST. BANKURA UNDER WBKVIBVIEW
27.02.2019INCREASE OF PLINTH HEIGHT FOR CPC AT SIMLAPAL, DIST. BANKURA UNDER WBKVIB VIEW
01.03.2019  ADDITIONAL WORK OF 1ST FLOOR SHOP AREA & ADJACENT WORKS OF CPC PROJECT AT SUSUNIAVIEW 
27.02.2019BRICKWORK AND FLOORING FINISH AND OTHER ANCILLARY WORK FOR ENTIRE NEW CONSTRUCTIONVIEW
25.01.2019CONSTRUCTION & DECORATION OF 3 NOS. MAIN BOUNDARY GATE UNDER PROJECT KHES AT LAVPURVIEW
01.03.2019 CONSTRUCTION OF C.P.C. OF COTTON KHADI BUILDING AT BARIVIEW
01.03.2019CONSTRUCTION OF CFC BUILDING FOR PROJECT SILK AT LAVPURVIEW
01.03.2019CONSTRUCTION OF CPC BUILDING OF R.C.C.H PROJECT AT GOSABSVIEW
15.02.2019DEVELOPMENT OF LAND FOR CONSTRUCTION OF CPC UNDER PROJECT KHES AT LAVPURVIEW
25.01.2019DEVELOPMENT OF LAND FOR CONSTRUCTION OF CPC UNDER PROJECT KHESVIEW
15.02.2019ELECTRICAL WIRING AND FITTING FIXING OF ALL NEW FITTING & FISCHER FOR THE CFC BUILDING WITH SUBMERSIBLE PUMP ETCVIEW

 

Act, Rules & Regulations of the Board displayed in the Website are for general information only. For authenticity, the original copy of the Act, Rules & Regulations available in the Board, should be consulted.

  OUR OFFICES

 Head Office: WEST BENGAL KHADI & VILLAGE INDUSTRIES BOARD
 12, B.B.D Bag, Kolkata- 700 001 

  

  Sl. No.             District Offices  Sl. No.            District Offices
  1.

  The District Officer (Birbhum)
  West Bengal Khadi & Village Industries Board,      Adarpur (Near FCI Godown & Mahabir Hotel),        P.O. Barabagan, Suri,
  District: Birbhum, 731 101.

  2.

  The District Officer (Bankura)
  West Bengal Khadi & Village Industries Board,
  Rampur Monohartala, Beside Priyadarshi Hotel,          P.O. & District: Bankura

  3.

  The District Officer (Burdwan)
  West Bengal Khadi & Village Industries      Board,
  Spandan Complex (Ground Floor), G.T.        Road,      P.O. & District: Burdwan

  4.  The District Officer (Uttar Dinajpur)
  West Bengal Khadi & Village Industries Board,            Block-II, (1st floor), Raiganj Commercial Estate,          Raiganj Super Market,
  P.O. Raiganj, District: Uttar Dinajpur.
  5.  The District Officer (Howrah)
  West Bengal Khadi & Village Industries Board,      Shapur (Sibtala) W. Road, P.O. Dasnagar,
  District: Howrah.
  6.  The District Officer (Hooghly)
  West Bengal Khadi & Village Industries Board,
  Old Zilla Parishad Building, Ground Floor
  P.O. Chinsurah, District: Hooghly.
  7.  The District Officer (Purba Medinipur)
  West Bengal Khadi & Village Industries Board,
  Vill- Chaksrikrishnapur (Nimtouri High Road),        P.O. Kulberiya, Tamluk District: Purba                    Medinipur, 721 101.
  8.  The District Officer (Paschim Medinipur)
  West Bengal Khadi & Village Industries Board,            Zilla   Parishad Complex, D.R.D.C. Building, 2nd            Floor, P.O. & District: Paschim Medinipur.
  9.  The District Officer (Malda)
  West Bengal Khadi & Village Industries Board,
  C.C.P.C Building 77-A,/95,
  K.J. Sanyal Road, Atul Market,
  P.O. & District: Malda.
  10.  The District Officer (Murshidabad)
  West Bengal Khadi & Village Industries Board,
  20, Barrack Square,
  P.O. Berhampore,
  District: Murshidabad.
  11.  The District Officer (North 24 Parganas)
  West Bengal Khadi & Village Industries Board,
  Rishi Bankim Sarani,
  Zilla Parishad Bhavan, P.O. Barasat,
  District: North 24 Parganas.
  12.  The District Officer (Dakshin Dinajpur)
  West Bengal Khadi & Village Industries Board,
  Zilla Parishad Complex,
  P.O. Balurghat,
  District: Dakshin Dinajpur.
  13.  The District Officer (Purulia)
  West Bengal Khadi & Village Industries Board,
  N.R.E.P Building,
  Zilla Parishad Complex,
  P.O. & District: Purulia.
  14.  The District Officer (Nadia)
  West Bengal Khadi & Village Industries Board,            Nadia District Office,
  Muslin Tirtha
  Madhu Chowdhury Lane,
  P.O. Ghurni, Krishnanagar
  Dist- Nadia, 741 103
  15.  The District Officer (South 24 Parganas)
  West Bengal Khadi & Village Industries Board,      South 24 Parganas District Office, 2, Muzaffar        Ahmed Street,
  Kolkata- 700 016.
  16.  The District Officer (Coochbehar)
  West Bengal Khadi & Village Industries Board,
  Nripendranarayan Road,
  Udichi Building,
  P.O. & District: Coochbehar.
  17.  The District Officer (Darjeeling)
  West Bengal Khadi & Village Industries Board,
  Netaji Subhash Road, Subhash Pally South,            Ward No. 20 (Old C.P.W.D Office)
  P.O. Siliguri, District: Darjeeling.
  18.

  The District Officer (Jalpaiguri)
  West Bengal Khadi & Village Industries         Board,
  Collectorate Building,
  Block- ‘A’, 2nd Floor,
  P.O. & District: Jalpaiguri.

 

RURAL CRAFT HUB

Handicrafts of Bengal embody our rich heritage of aesthetics, creativity and artistry. In today’s globalised world, the growing retail industry, fashion and luxury markets demand for green productions. Besides on the rises its high potential for employment, the craft sector is economically important from the point of low capital investment, high ratio of value addition, and high potential for export and foreign exchange earning for the country. WBKVIB thus aims to unleash the potential of the sector in terms of employment, enterprise, export and growth. WBKVIB is implementing the project with a vision to develop the villages with hundreds of families traditionally skillled in craft traditions like Sitalpati, Madhurkathi, Terracotta, Pathachitra, Dokra, Wooden Mask and Clay Doll making, Kantha as vibrant craft hubs connected to national and international markets.

OBJECTIVES OF RURAL CRAFT HUB

  • Identifying, moblising and building capacity of 3000 artists families in 11 locations of West Bengal, create 10 Rural Craft Hubs and to access global/national market.
  • The project aimed at developing a vibrant craft sector by converting the traditional craft skills of West Bengal into viable enterprise, thereby ensuring socio-economic development of the rural poor.
  • To provide hard intervention of the WBKVIB for setting up the RCH projects at different places in West Bengal.
  • To enable the artisans in accessing market.

 

  Sl. No.      NAME  YEAR OF PUBLISH
1.PROSPECT OF KHADI INDUSTRIES2008
2.GUIDELINE OF PMEGP2009
3.MDA MODALITIES2011
4.BANGLAR MUSLIN2014
5.HAND MADE PAPER INDUSTRY2014
6.CREATIVITY BENGAL2015
7.MUSLIN SUTA ‘O’ KAPORER RANJAN VIDYA (IN BENGALI)2015
8.PROJECT MUSLIN2015
9.

KATUNIR JANYYA PROSIKHAN PUSTIKA – 2015

BAYAN SHILPI DER JANYYA PROSIKHAN PUSTIKA – 2015
2015
10.HAND BOOK ON KHADI2016
11.KHADI KARYAKRAM SAHAHIKA2016
12.MADURKHATI BROCHURE2017
13.MADURKATHI E CATALOGUE2017
14.WBKVIB- TOWARDS A NEW HORIZON2018
15.REVISED MMDA GUIDELINES2019

 

 

 VILLAGE INDUSTRIES SCHEMES

Any Industry that is located within a rural area, where the Fixed Capital Investment per Artisan (weaver) does not exceed Rupees One hundred thousand The Fixed Capital Investment can be changed by the Central Government of India whenever it so requires. Another advantage of Village Industries is that they require little or no capital to set up, thereby making them an economically viable option for the rural poor. This is an important point with reference to India in view of its stark income, regional and rural/urban inequalities.

Scheme is a large-scale systematic plan or arrangement for attaining some particular object or putting a particular idea into effect. West Bengal Khadi & Village Industries Board implemented various scheme in order to employment generation. Under the Special Component Plan, the Board has implemented various schemes, like foot-wear making, cane and bamboo articles making, carpentry and black-smithy works to provide employment to the artisans:-

TRAINING & WORKSHOP

i).Organising EDP Training for implementation of PMEGP under Village Industries Programme.
ii).Organising Trade Training with active collaboration of KVIC for different Village Industries Programme,
iii).Organising in Service Training of Board's Office personnel for upgradation of their skill and efficiency.
iv).Holding Workshops on different issues related to Khadi, Village Industries, Accounts and Marketing for Dissemination of new ideas for effective implementation Of Board's Programme.

Boards Event management is the application of project management to the creation and development of large-scale events such as fashon show, participation in fair, etc. It involves studying the brand, identifying its target audience, devising the event concept, and coordinating the technical aspects before actually launching the event.

There are separate cell for the process of planning and coordinating the event is usually referred to as event planning and which can include budgeting, scheduling, site selection, acquiring necessary permits, coordinating transportation and parking, arranging for speakers or entertainers, arranging decor, event security, catering, coordinating with third party vendors, and emergency plans. Each event is different in its nature so process of planning & execution of each event differs on basis of type of event.

 

 

KVIB also promotes products made using the indigenous handspun fabric in the Global Market. The average Khadi Sales through departmental sales outlets(Gramin) also witnessed a marked increase. One of the policy decisions of WBKVIB is to allow Private Parties to sell Khadi products under the brand name GRAMIN under the PPP  model for the same and for such it is to execute an agreement with WBKVIB & Private Party/ Khadi Institution/ any Govt. Organization. Such sales outlets are spread within the state of West Bengal. Such tie-ups would be beneficial to both organizations.

  

Sale of Khadi Products – At a glance

Sale of Khadi Products – At a glanceFor 2016-17 Rs.For 2017-18 Rs.For 2018-19 Rs.
  • Collection of premium from Gramins (under P.P.P Model)

    Retail Sales Report of Khadi Gramins (12 nos.)

    Retail Sales Report on District Level Exhibitions

    Retail Sales Report on other State Level Exhibitions

    Retail Sales Report on National Level Exhibitions

    Retail Sales Report on International Level Exhibitions

    Wholesale from Central Store under Biswa Bangla for V.I Product

    Whole Sale of Muslin Products under Biswa Bangla

    Sales Report on State Level Khadi Mela organized by WBKVIB

    Sales Report Zonal Level Khadi Mela organized by WBKVIB

 3.60

  70.00

  80.00

90.00

75.00

58.00

40.00

20.00

263.00

106.00

2.00

200.00

100.00

102.00

280.00

80.00

62.00

22.00

296.00

250.00

3.40

291.00

314.76

207.00

76.00

70.00

151.84

14.00

495.00

725.00

 

 

 

 

 

 

 

 

 

 

 

PROCEDURE OF FORMATION

SPINNING

WEAVING

MDA/MMDA 

The MDA (Marketing Development Assistance) scheme has been introduced in place of long existing Rebate scheme as an assistance to Artisans and Khadi Institutions.

Quantum

i) Artisans- 50% of settled amount.
ii) Institution- 50% of settled amount.
MDA is calculated on COST OF PROD. value but since 2017-18 a new scheme namely MMDA (Modified Marketing Development Assistance) has been introduced in place of MDA scheme on the strength of approval accorded by MSME&T Deptt. of W.B. vide memo no. 169/MSMET(v)/2k-09/15 dtd. 18.01.18.
MMDA is calculated on PRIME COST of Prod. value.
State Govt. share of MDA & MMDA are @ Rs. 10% & 15% respectively. All the Khadi producing Institutions having valid certificate are entitled to avail such benefit under this scheme.

 

 

 

THE MODIFIED MARKET DEVELOPMENT ASSISTANCE (MMDA) ON PRODUCTION SCHEME TO BE IMPLEMENTED WITH EFFECT FROM 01.04.2017 UNDER THE PURVIEW OF WEST BENGAL KHADI & VILLAGE INDUSTRIES BOARD.


BACKGROUND:

Khadi is handspun and hand woven cloth made by around a million traditional rural artisans. Handspun and hand woven characteristic is the Unique Selling Proposition of Khadi. Govt. of India has been providing MMDA @ 30% on the prime cost of production of Khadi in order to facilitate the product to compete with other textile product in the market.

Implementation of Modified Marketing Development Assistance (MMDA) scheme for Khadi & Polyvastra w.e.f 01/04/2017 in place of earlier MDA approved by MSSE & T Department, Govt. of West Bengal under the purview of WBKVIB.
MSSE & Department, Govt. of W.B with the concurrence of Finance (Audit) Department, Govt. of W.B has accorded approval for the introduction of Modified Market Development Assistance (MMDA) scheme with effect from 1-04-2017 in lieu of existing MDA by West Bengal Khadi & Village Industries Board in this State as per Govt. of India’s Circular No. DK/KC/Khadi/MPDA/Guidelines/16-17 dated. 26-12-2016 and guidelines laid down therwith issued by Directorate of Khadi Coordination, Khadi & Village Industries Commission subject to compliance of formalities laid down of the aforesaid Circular No. DKC/MDA-Policy/2010-11 dtd 16-04-10 of Govt. of India.

And the State Government accorded approval Vide No. 169-MSMET (V)/2K-09/15 dtd. 18-01-2018.

On the strength of the above noted order the WBKVIB has now decided to formulate and issue the brief Guidelines for giving immediate effect for introduction of Modified Market Development Assistance (MMDA) scheme on behalf of the MSME & T Department, Govt. of W.B w.e.f 01-04-2017.
The scheme has been effective from 1st April, 2017. The scheme will help Khadi Sector to reorient their activities extending adequate emphasis towards increasing artisans’ earnings as well as ensuring quality of Khadi to customers.

After introduction of MMDA from the end of KVIC, Govt. of India, the proposal for providing matching MMDA in the line of erstwhile MDA scheme to the certified Khadi Institutions/Societies in our state out of State Plan Resources and thereafter, the State Govt. has also decided to accept the proposal of the Board for Introduction of MMDA Scheme @ 15% on Prime Cost of production out of State Plan Resources.

The brief Guidelines in respect of above are now enunciate below for information and compliance for Certified Khadi Institutions/Societies, Offices of WBKVIB and KVIC in the State of West Bengal and others concerned.

Brief Guidelines for implementation of MMDA (State Govt. share)

1. The existing MDA scheme has been modified and termed as MMDA (Modified Marketing Development assistance). The newly scheme is effective from 2017-18 (01.04.2017).
2. The Modified MDA (State Govt. share) shall be calculated @ Rs. 15% on PRIME COST. The Prime Cost includes cost of raw material plus conversion changes up to grey cloth plus processing charges without margins (Establishment Expenditure, Trading, Insurance & Bank Interest)
3. All the Khadi Institutions/ Societies have to submit their claims in the form of MMDA instead of MDA as per existing proforma.
4. Under MMDA scheme the artisans engaged in the pre processing activities of Spinning & Weaving, Dyeing & Warping shall also be considered as the stakeholders along with Spinners, Weavers, Reelers and Turners.
5. The staff of Khadi Institutions involved in either in Production or Sale shall be considered as stakeholder of such MMDA.
6. Khadi Institutions/Societies undertaking production as well as sales activities shall be entitled for 50% of MMDA on Prime Cost and the remaining 50% shall be distributed among the spinners, weavers, reelers, turners and other respective artisans.
7. The Khadi Institutions/Societies should submit their claims of MMDA yearly to the respective District Offices of the Board.
8. Settlement of Claim:
All the claims as received will be examined and audited time to time by the entrusted officials of the Board and on the strength of desired recommendations from concerned District Officer the verified claim bills/reports shall be considered for payment subject to availability of fund from State Govt.
9. Furnishing of Utilization Certificate:
The Khadi institutions/societies availing MMDA will be bound to furnish utilization certificate within 1 month from the date of receipt of MMDA grant.

10. Utilization of MMDA for certain purpose, such as renovation, modernisation etc. may take a period more than one year. In such cases the Societies/Institutions will be allowed to spent MMDA portion up to 2 years.

The Khadi Institutions/Societies must submit their claims along with following documents:

1) Claim Bill in duplicate (as per proforma)
2) Copy of SFC approved target.
3) Copy of Certificate from the Registrar of society regarding Members of respective Managing Committee.
4) Copy of resolution regarding MMDA claim.
All the payments by the Khadi Institution/Societies out of MMDA must be through Aadhar linked bank (RTGS/NEFT) a/c to its stakeholders.

Components of MMDA:


COST OF RAW MATERIAL
+
SPINNING/REELING AND WEAVING CHARGES INCLUDING PROCESS WASTAGE, ARTISANS INCENTIVE AND ARTISANS WELFARE FUND ETC.
+
WET PROCESSING i.e BLEACHING, DYEING, MERCERIZING AND PRINTING CHARGES ALONG WITH PROCESS WASTE.

[PRIME COST]


Compliance of all the above points will be ensured by WBKVIB while settling the MMDA claim of each Institution/Society.

Definition of MMDA: MMDA on Production is an assistance proposed to be provided on Prime Cost of Khadi and polyvastra achieved by the certified Khadi institutions. The Khadi institutions, having valid Khadi certificate and categorized are only eligible to avail MMDA grant from WBKVIB/State Govt.

Rate Of MMDA: MMDA shall be allowed @ 15% ‘on Prime Cost (Cotton including Muslin Khadi, Silk, Woollen) and polyvastra to the extent of production target approved by the Standing Finance Committee (SFC) of KVIC for a particular Financial Year.

Producing Institution for the purpose of MMDA will mean the institution engaged in the activity of production of Khadi.
Selling Institution or sales outlets including departmentally run units of KVIC and KVIB for the purpose of MMDA will mean the institutions engaged in the activity of selling of Khadi purchased from producing institution.
Composite Institutions will mean the institutions engaged in the activity of producing and selling of Khadi.


Test Check/Test Audit and Monitoring of MMDA on Production:

1. WBKVIB shall conduct test audit/check of MMDA claims through its own officials in respect of all the institutions availing MMDA. The WBKVIB will reserve its right for such test audit/check and in case of any mis-utilization, it may order for complete audit of accounts of the Khadi institution. The MMDA claims will also be opened for ‘internal audit’ by the A.G., West Bengal.

2. As the funds for MMDA would be extended from Public fund, the Office of Auditor General of WB will have the right of conducting audit/test check or otherwise as decided by that office.

Dispute settlement in transfer of MMDA:

1. In case of non transfer or improper transfer of MMDA by the producing institutions to other stake holders especially the Artisans, the Stake Holders should bring such transactions immediately (Within one month of transaction) to the notice of the H.O through its District Office who will direct the producing Institutions to the eligible portion of MMDA forthwith. If any Khadi producing institution is not complying with the norms as laid down in the circular the CEO, WBKVIB will reserved the right to deduct the amount from the claim of the khadi producing institutions and remit the same to the Stake Holders i.e Artisans/Institutions as the case may be.

2. The Chief Executive Officer, WBKVIB shall be the appellate authority for all disputes and all Khadi Institutions will be bound by his decision.

 

 

MUSLIN TIRTHA

 It is an integrated activity centre where all the facilities will be available to develop muslin), where research and development on Muslin will be continuing, have been established by the Board in the following District Viz-

 

Sl No.

Place where Muslin Tirtha situated

Construction cost

Activities

1

Krishnanagar, Nadia

1.86 cr.

Training cum production of High count Muslin

2

Berhampur, Murshidabad

1.35 cr.

Training cum production of High count Muslin

3

Malda

2.04 cr.

Training cum production of low count Muslin

4

Suri, Birbhum

1.27 cr.

Training cum production of low count Muslin

 

Muslin Tirtha of West Bengal KHadi & V.I Board have established in four districts i. e Nadia, Murshidabad, Birbhum and Malda for organize of skill development training, production and services with help of khadi societies/institutions under project muslin scheme in respect of spinning, weaving, designing, dyeing, pre-processing activities etc, as well as marketing promotion of khadi products for livelihood development of the artisans attached with the khadi societies

 
Modalities of "Muslin Tirtha"

A) Raw Material Bank
i) To procure Roving from Central Sliver Plant, KVIC(Hajipur & Trichur or any such plant) and to supply Cotton roving for Spinning 10(T-20(r & 300" Metric Count of Muslin Yarn to various Khadi Societies,

ii) To procure Suvin Cotton / Sliver from bonafide agencies / plant and to supply Suvin Cotton / Sliver for Spinning 400S-500S Metric Count of Muslin Yarn to various Khadi Societies.

Mode of operation of Raw Material Bank
i) Khadi Societies have to place indent for Raw Material to District Officer along with the Demand Draft drawn in favour of "West Bengal Khadi & Village Industries Board". Rate of materials will be fixed up by H.Q.
ii) Raw Material will be issued by the District Officer to the Khadi Societies. 
iii) Stock Register is to be maintained by D.O. and Stock position indicating available Stock and further requirement is to be submitted monthly to H.Q.

B) Training Centre for Spinning, Weaving & Dyeing & Printing of Muslin Yarn & Fabric

Training Centre on Spinning for Muslin Yarn At Muslin Tirtha, Nadia, training will be imparted for spinning on high count of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame) - 10 Nos. (For Spinning, of 400s- 500s Metric) 

 At Muslin Tirtha, Birbhum. Training will be imparted for spinning on medium & high count of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame) - 5 Nos. (For Spinning of 400s-5 00s Metric Count of Muslin Yarn)
ii) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 300s Metric Count of Muslin Yarn)
iii) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 200s Metric Count of Muslin Yarn)
iv) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 100s-150s Metric Count of Muslin Yarn)

Training Centre for Weaving & Designing at Nadia, Maida, Murshidabad & Birbhum

i) Frame Loom - 5 Nos.
ii) Jacquard Loom (100 & 200 hooks)- 1 Nos.
iii) Dobby Loom - 2 Nos.

Training Centre for scouring, bleaching, dyeing & finishing Muslin Yarn & Fabric at Nadia, Malda, Murshidabad & Birbhum
i) Raw Material, Dye, Chemical etc. will be arranged by D.O. of the concerned district officer after obtaining approval of Chief Executive Officer.
ii) Equipments for dyeing & scouring, bleaching & finishing will be installed by H.Q., in due time.
ii) No. of 8 Spindle Charkha (Metal Body) - 10 Nos. (For Spinning 300s Metric Count of Muslin Yarn)

At Muslin Tirtha, Murshidabad Training will be imparted for spinning on high count of muslin yarn.

i) No. of 5 Spindle Charkha (Wooden Frame)- 10 Nos. (For Spinning of 400s-500s Charkha of Muslin)
ii) No. of 8 Spindle Charkha (Metal Body) - 10 Nos. (For Spinning 300s Metric Count of Muslin Yarn)

At Muslin Tirtha, Malda Training will be imparted for spinning of muslin yarn.
i) No. of 5 Spindle Charkha (Wooden Frame) - 5 Nos. (For Spinning of 400s-500sMetric Count of Muslin Yarn)
ii) No. of 8 Spindle Charkha (Metal Body)-5 Nos. (For Spinning 300s Metric Count of Muslin Yarn)
iii) No. of 8 Spindle Charkha (Metal Body)-5 Nos. (For Spinning 200s Metric Count of Muslin Yarn)
iv) No. of 8 Spindle Charkha (Metal Body) - 5 Nos. (For Spinning 100s- 150s Metric Count of Muslin Yarn)

 

Board's officials from Head Quarter or from other Districts may stay in the Guest House during official tour without any cost but fooding have to arrange by the officials. Out side Guest may be allowed to stay in the Guest House by paying Rs. 1OO/-{ Rupees One Hundreed) only per day maximum 3 (three) days with prior approval of C.E.O. of the Board. District Officer has to maintain Log Book for the Guest House. No staff is allowed to stay in the Guest House permanently. Guest House should be cleaned & maintained properly. District Officer will take appropriate action regarding this. Fund collected to stay in the Guest House by the outsiders is to be remitted to Head Quarter in every Month.

 

 

SOCIETIES , KHADI INSTITUTIONS


Khadi Institution
The Societies Registration Act, 1860, provides for facilities to form institutions for carrying on social and economic activities especially with a view to creating gainful employment for poor artisans through Khadi activities organized on no profit no loss basis. However, this Act does not permit formation of institutions to undertake commercial activities.

Structure of Institution
Registered institutions have their own decentralized units of production and each institution has a Chairman, Secretary, Treasurer and other executive members. So far as the institution is concerned, the Chairman of the institution is assisted by the Secretary, Treasurer, Accountant, Internal Auditors, Production Managers, Sales Managers and others. It would not be out of place to mention here that most of Institutional Seretaries hold on to the same post for years together without any retirement age limit and some times it is even here ditony.

Operational Area 
Each institution has its own operational area which is demarcated by the Certification Committee of KVIC, Mumbai.

Function of Registered Khadi Institution 

1. Extension of Khadi activity in the rural and remote areas.
2. To give financial and technical guidance to the individual artisans.
3. To supply the raw materials and marketing of the products of the artisans.
4. To supply the tools and equipment for the registered artisans.
5. To select the artisans for training/upgradation at the centres or outside the centre.
The registered institutions perform broad socio economic functions for the welfare of artisans, non-artisans and the people of the area concerned.

 

 

KVIC SOCITIES

KVIB SOCITIES

PROJECT MUSLIN

 

MUSLINLADY1.png
MUSLIN3.png
MUSLIN.png
MUSLIN2.png
previous arrow
next arrow
 
MSME&T Deptt., Govt. of W.B. through its WBKVIB has taken up the ‘Project Muslin”, where WBKVIB has been assigned the task of exploring the possibilities and potentials for reviving the old glory of heritage MUSLIN CRAFT, the pride of Bengal in one hand and overall livelihood development through a holistic approach of the stake holders on the other.
 

Background of Project Muslin :

Under British rule, the British East India company could not compete with local muslin with their own export of cloth to the Indian subcontinent.

Though Gandhiji believed Khadi can play a vital role in the economic growth of the nation the Bengali muslin industry was suppressed by various colonial policies. As a result, the quality of muslin suffered and the finesse of the cloth was lost.

There have been a few attempts at reviving the muslin industry even after independence. In the present day, many different types of muslins are produced in many different places.

It surfaced that those who were attached with Muslin compelled to shift to the other profession as they could not get benefits they were entitled to. Due to lack of storage and lack of proper marketing and it has become a seasonal occupation. They were in despair, the hands that could weave dreams, that could create beauty were becoming listeners. The Youth were either not learning or unlearning the teaching of their forefather. Some of them became agricultural workers, some of them started pulling rickshaw. The West Bengal Khadi & Village Industries Board has rightly seized of the opportunity and has given utmost importance to intervene in the following areas.

 1. Skilling/Training : It is an important Policy Priority for Bengal Muslin.

 2. Infrastructural Support.

 3. Quality Control.

A revival package for superfine cotton-thread has been taken up under ‘PROJECT MUSLIN’ by the Department of Micro, Small and Medium Enterprises and Textiles, Government of West Bengal. Its primary objective is to revive the muslin industry and ensure that the artisans get remunerative returns and appreciation for their unique skills. WBKVIB was entrusted to implement the project.

It was indeed an honour for  the WBKVIB made a MOU with Kolkata Craft Combine Society for soft intervention to the Muslin artisans.

1. Skilling/Training :

WBKVIB’s policy intervention have translated into concrete programmes of action which addressed four major skill challenges – scale, quality, employability and aspirations and several interventions have been introduced in both short term and long term.

Upskilling and reskilling a key component of the skill ecosystem.

WBKVIB had been imparting skill training across the state through Privet Partners.

Skilling is destined to become a great success in coming years and widen the opertunities for women in big way added to this is the need to diversify Products of Khadi Muslin.

Start ups showed that there were huge prospects ahead and little more encouragement and support from the KVIB would bring out the desired result.

Training Projects were allocated to those trainers who can train properly so that weavers can change themselves with the changing time. This is a perfect case study as to how all concerns can join hands.

Skilling had been receiving focused attention. Skilling helps to familiarize the artisan with latest technology and design and help to upgrade the product to the Global standard with better dyeing process and weaving techniques.

The artisans were mostly poor exposure to new technologies. Series of efforts had been taken to redress this problems and the sector is now witnessing good growth in terms of product developments.

 

Sl No.

 

 

 

NAME OF THE DISTRICT

 

 

TRAINING ON

SPINNING

WEAVING & DESIGNING

DYING & PRINTINGPRE LOOM

1

MURSHIDABAD

19

04

02

01

2

MALDA

12

0

0

0

3

BURDWAN

08

01

01

0

4

BIRBHUM

12

03

01

01

5

NADIA

08

02

020

6

PASCHIM MEDINIPUR

0101010

7

BANKURA

0402010

8

HOWRAH

0404002
9

HOOGLY

0601001
10

24TH PGS (N)

01000

TOTAL

75180805

 

Training of high count Muslin (400s – 600s and above)

Matiary Kutir Shilpa Pratisthan at Nawadwip is the facilitating agency which runs the training center under WBKVIB for creating Muslin fabric of 500 count and plans to take up the challenge of producing fabric as fine as 600 counts. There are approximately 60 women that work in the

unit and they plan to extend it to more women of the area and make it a complete unit handled exclusively by women. 

 

Training of Muslin(High count) at Matiary Kutir Shilpa Pratisthan,Nabadwip,Nadia

 

MODERNIZATION OF PRE-LOOM/WEAVING PREPARATORY SECTION FOR KHADI SECTOR

West Bengal Khadi & Village Industries Board had taken a project of “Pre-Loom/Weaving Preparatory Section” in the arena of Khadi Sector in association with Govt. College of Engineering & Textile Technology, Serampore.

 1. Preparatory process is the backbone of weaving performance i.e. quality and production. In Khadi, the primitive process is laborious and time consuming. As a result the suitable process is to be developed for preparatory section of Khadi Industry is utmost essential.

2. The aim of this project is to enhance the quality of Khadi fabric and also to resolve the problem associated with Khadi Weavers and Khadi Weaver’s family by adoption of appropriate technology with the modification and mechanisation of Yarn preparation process which will reduce the work load and time of Weavers and thereby to resolve the social problem associated with the Khadi Weavers and Khadi Weaver’s family.

3. Hence, the aim of this project is to improve the Khadi preparatory process by (i) Method of wetting of yarn prior to sizing (ii) Modification of sizing paste preparation (iii) Elimination of step by modification of sizing recipe (iv) Improvement of knotting technique (v) Introducing of sectional warping over peg warping and (vi) Mechanised winding process.

AT A GLANCE (Outcome of the Project)

Sl. No.SectionPreviousNowOutcome
1.Yarn Wetting ProcessProcess time:4-5 days

Process time: less than

1 days

Loom waiting time reduces by minimum

of 3 days

2.Sizing Paste PreparationRice Dust PasteLatai making is Eliminated

New recipe for enhances the quality

and productivity

3.Latai Making Process after Sizing

1. Making of Latai

(Cage Winding)

from wet sized yarn

2.Drying of yarn in overlapped condition drying is time consuming

1.Yarns are dried in more open form

2.Drying time is reduced

3.Drying can be done in house.

Elimination of tedious process reduces

the loom waiting time

 

 

Making of লাটাই from wet sized yarn causes entanglement.

 

 Use of rice based starch for sizing causes damage to yarn on storage

 

 

 

 

 

 

 

 Infrastructural Support

I. An infrastructure – Comprising Physical Infra, technology and innovation support. WBKVIB is on spree of revival of the glory MUSLIN KHADI, at the grass root level and in the past years 4633 nos. appropriate CHARKHAS and 4580 nos. advanced looms were supplied to the selected Muslin artisans who possess enough potential and possibilities. These units can be on the way to becoming the piller of growth. Availibilities of infrastructure means access to latest technology.

 

SL NO.DistrictNo. of CharkhaNo. of loom supplied

1.

Paschim Medinipur15250

2.

Purulia5286

3.

Nadia28364

4.

Murshidabad16061282

5.

Malda1228785

6.

Howrah 244168

7.

Purba Medinipur3010

8.

Hooghly 11024

9.

Burdwan339124

10.

Birbhum 378729

11.

Bankura70769

12.

Darjeeling1240

13.

24 Parganas (N)18338

14.

24 Parganas (S)770

15.

Head Quarter20

16.

KCCS (Facilitator)1511

TOTAL

46334580

 

II.The possibilities and potential for job creation and weath formation are immence in the Khadi Sector and to provide gainful employment at the doorsteps of the rural un-employed, especially youth and women. Women’s emancipation and empowerment at the core of all development activities of WBKVIB. Within good infrastructural facilities the building of CPC is an important and so far 496 nos. CPC have been completed and 96 nos. will be completed soon for the place of working Muslin Artisans.

 

STATEMENT FOR WORKSHED SCHEME

SL NODistrictNo of Proposal Received No. of Proposal approvedNo of Proposal AcceptedNo. of Proposal under processNo. of Proposal rejectedNo. of artisan deposited own contributionFund  disbursed for no. of casesFund to be disbursed for no. of casesFund disbursed (Rs.)

1.

HOOGHLY301020000

2.

NADIA300300000

3.

BIRBHUM256172008416786819674265/-

4.

MURSHIDABAD279278100278278031272645/-
5.

BANKURA

24230011212111349897/-
6.

PURULIA

53410012393814274675/-
7.

HOWRAH

1313000131301462396/-
8.

PURBA BURDWAN

2826002191932087482/-

TOTAL 

659553231015284469650121360/-

 

It is an attempt to facilitate the development of Khadi spinners and weavers essentially belonging to BPL category by providing them financial assistance for construction of worksheds, on pilot basis.

Financial Assistance for construction of workshed will be provided to those Khadi Artisans who belong to BPL category through the Khadi institutions with which these khadi artisans are associated.

Quality Control :

Quality Control is a set of steps or guidelines designed to guarantee that a product (Khadi Fabric) meets certain performance standards and customer expectation. The above is generally measured by various production components or a set of steps or guidelines       

                                            

  • Selection of raw materials.
  • Fiber manufacturing.
  • Yarn manufacturing.
  • Fabric construction.
  • Dye and coloration.
  • Printing & design
 

 

 

The entire components and tested at Board’s in house testing laborotary by the experienced textile engineers before receiving any such fabrics which is in brief :

  • Yarn testing : yarn occupies the intermediate position in the manufacture of fabric from raw materials. Yarn results are therefore essential, both for estimating the quality of raw material and controlling the quality of fabric produced.
  • Sampling : the sampling must be true and representative of the Bulk lot.
  • Ambient condition for yarn testing : Elongation, yarn evenness, imperfections, count etc. temperature 20+ 2 degree centigrade.

 

Raw materials of Muslin Khadi Fabric

A Khadi Institution (may be either the fold of KVIB or KVIC) Producing Muslin Khadi can only develop higher performance and sustainable profit ability if the quality standard are maintained (in sync) to the global standard. It also enhance competitiveness in Muslin Khadi Industry.

The programme aims to develop global competitiveness among Bengal’s Muslin Khadi Producers by improving the process design techn ology and market access. It also aims at value – added cost effective solution.

Muslin Khadi is already repositioning on the Khadi Map.

 

Board has set up a physical testing of cotton yarn and fabrics, chemical testing of cotton fabrics testing laboratory and also for the standardization of the parameters which is an ultramodern lab manned by qualified personal to ensure maintenance of quality to meet the stringent standard. We may test both physical and chemical properties of the yarn and fabric. (ISO certificate obtained and furnished below).

                                                       

 

 

 

 

 

 

 

 

KHADI ARTISIAN MAP

 

 

 

 

 

The West Bengal Khadi & Village Industries Board's Buyer-Seller Meet (BSM) is a tailor-made match-making platform where select national and international buyers, consisting of retailers, wholesalers and distributors, are introduced to prominent West Bengal's Khadi & Village industries manufacturers through one-on-one pre-scheduled meetings.